Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML14007A141 | 31 December 2013 | Terms of Renewed License Is Not Likely to Adversely Affect Any Listed Species Under National Marine Fisheries Service | |
ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML13361A158 | 20 December 2013 | Response to NRC Request for Additional Information Regarding Relief Request PRR-22 | Large early release frequency DM weld |
ML13351A163 | 20 December 2013 | Branch Chief Reassignment for Plant Licensing Branch I-1 | |
ML13352A243 | 18 December 2013 | NRC Investigation Report No. 1-2013-017 (EA-13-174)- Ltr to Licensee (Public) | |
ML13225A587 | 16 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Containment Hardened Vent Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML13350A038 | 13 December 2013 | Acknowledgment Ltr to M. Seidel Re Safety at the Pilgrim Nuclear Power Station | |
ML13346A481 | 12 December 2013 | Acknowledgment Ltr to Susan Weegar Re Safety at Pilgrim Nuclear Power Station | |
ML14015A170 | 12 December 2013 | Pilgrim Dry Cask Presentation - Dec. 12, 2013 | Earthquake |
IR 05000293/2013009 | 12 December 2013 | IR 05000293-13-009; 11/4/13 to 11/21/13; Pilgrim Nuclear Power Station; Engineering Specialist Plant Modifications Inspection | Safe Shutdown Operator Manual Action Battery sizing |
ML13346A478 | 12 December 2013 | Acknowledgment Ltr to Meg Sheehan and Kevin Cassidy Re Compliance with the Endangered Species Act at the Pilgrim Nuclear Power Station | |
ML13346A483 | 12 December 2013 | Acknowledgment Ltr to Stephen Dunker Re Safety at the Pilgrim Nuclear Power Station | |
ML14006A273 | 12 December 2013 | NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant | Earthquake |
ML14003A046 | 12 December 2013 | FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Mission time Grab sample Fire Barrier Slow transfer Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Weld Overlay Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Locked High Radiation Area B.5.b Aging Management Abnormal operational transient Design basis earthquake Scram Discharge Volume Feedwater Controller Failure Overtravel License Renewal Earthquake Fuel cladding Liquid penetrant Pressure boundary leak Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Dissimilar Metal Weld Flow Induced Vibration Coast down Unidentified leakage |
TAC:MF1176 | 11 December 2013 | ||
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
ML13350A486 | 10 December 2013 | Emergency Response Data System 24/7 Implementation | |
ML13338A667 | 9 December 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML13345A267 | 5 December 2013 | Comment (00351) of Brian O'Malley on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | Probabilistic Risk Assessment Chernobyl |
Press Release-I-13-042, NRC Assigns New Resident Inspector to Pilgrim Station | 5 December 2013 | Press Release-I-13-042: NRC Assigns New Resident Inspector to Pilgrim Station | New Resident Inspector |
ML13333A910 | 5 December 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool ins | High Radiation Area Safe Shutdown Earthquake Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
ML13339A298 | 4 December 2013 | Comment (00330) of Lee Roscoe on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | Probabilistic Risk Assessment Chernobyl |
Press Release-I-13-041, NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant | 2 December 2013 | Press Release-I-13-041: NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant | |
ML13336A809 | 2 December 2013 | Webinar to Discuss Independent Spent Fuel Storage Installation (ISFSI) Basics and Planned Use at the Pilgrim Nuclear Power Station | |
ML15027A458 | 2 December 2013 | G20132011 - Office of New York State Attorney General Letter NRC Enforcement Proceeding No. 2013-0192 | |
ML14016A361 | 27 November 2013 | Submittal of Information Relevant to NRC Enforcement Proceeding No. 2013-0192 | |
ML13346A026 | 26 November 2013 | Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling Operations | Safe Shutdown Earthquake Control of Heavy Loads |
ML13346A013 | 26 November 2013 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Internal Flooding Fukushima Dai-Ichi |
TAC:MF0264 | 26 November 2013 | ||
ML13346A014 | 26 November 2013 | Response to Request for Additional Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements | Past operability Fukushima Dai-Ichi |
TAC:MF0160 | 26 November 2013 | ||
ML13323B470 | 25 November 2013 | Request for Additional Information Regarding Relief Request PRR-22 | Nondestructive Examination Large early release frequency |
ML13326B086 | 21 November 2013 | G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station | |
ML13346A931 | 21 November 2013 | G20130876/LTR-13-0941 - May Ruth Seidel Ltr. Safety of the Pilgrim Nuclear Power Plant | |
IR 05000293/2013008 | 20 November 2013 | IR 05000293-13-008; 09/16/2013 - 10/03/2013; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution (Public) | Significance Determination Process Operability Determination Fatigue Rule Affidavit |
ML14008A204 | 19 November 2013 | Intention to Store Spent Fuel in an Independent Spent Fuel Storage Installation (ISFSI) Per 10 CFR 72.212 | |
ML13323B091 | 18 November 2013 | LTR-13-0897 - Robert Rio, Esq., Associated Industries of Massachusetts Ltr. Support for Pilgrim Nuclear Power Station | |
IR 05000293/2013004 | 14 November 2013 | IR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and Resolution | Safe Shutdown Half scram Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Downpower |
ML13323A518 | 14 November 2013 | Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel | Safe Shutdown Reactor Vessel Water Level Non-Destructive Examination Stroke time Control of Heavy Loads Fuel cladding Recently irradiated fuel |
ML13318A869 | 14 November 2013 | LTR-13-0884 Sen Edward Markey and Sen Bernard Sanders Letter Sufficient Funds to Operate Entergy'S Plants After Entergy Officials Contacted Senior NRC Officials to Complain About Pending NRC Oversight | |
ML13335A002 | 13 November 2013 | G20130211 - 11/13/13 E-mail from T.Judson to R.Guzman - Supplement #5 to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim | |
ML13318A822 | 11 November 2013 | G20130808/LTR-13-0883-Ticket - Meg Sheehan, Earthrise Law Center, Et Al., Ltr. Pilgrim Nuclear Power Station: Endangered Species Act Compliance | |
ML13312A670 | 7 November 2013 | G20130804/LTR-13-0879 - Pine Dubois, Jones River Watershed Association, Massachusetts Email Flooding at the Pilgrim Nuclear Power Station | |
ML13311B381 | 7 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (QAPM) | |
ML13310A318 | 6 November 2013 | Assessment Follow Up Letter - 11/6/13 | |
ML13309B612 | 5 November 2013 | Letter from Richard Laufer Acting Secretary to Mary Lampert Re DD-13-02 | |
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | 4 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13294A208 | 18 October 2013 | E-mail from T.Judson to R.Guzman G20130211 - Supplement #4 to 2.206 Petition Immediate Action - Vermont Yankee/Fitzpatrick/Pilgrim | |
ML13295A224 | 17 October 2013 | 10 CFR 50.46(a)(3)(ii) Error Report in the Analyses of Emergency Core Cooling System |