Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14007A14131 December 2013Terms of Renewed License Is Not Likely to Adversely Affect Any Listed Species Under National Marine Fisheries Service
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML13361A15820 December 2013Response to NRC Request for Additional Information Regarding Relief Request PRR-22Large early release frequency
DM weld
ML13351A16320 December 2013Branch Chief Reassignment for Plant Licensing Branch I-1
ML13352A24318 December 2013NRC Investigation Report No. 1-2013-017 (EA-13-174)- Ltr to Licensee (Public)
ML13225A58716 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Containment Hardened Vent
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML13350A03813 December 2013Acknowledgment Ltr to M. Seidel Re Safety at the Pilgrim Nuclear Power Station
ML13346A48112 December 2013Acknowledgment Ltr to Susan Weegar Re Safety at Pilgrim Nuclear Power Station
ML14015A17012 December 2013Pilgrim Dry Cask Presentation - Dec. 12, 2013Earthquake
IR 05000293/201300912 December 2013IR 05000293-13-009; 11/4/13 to 11/21/13; Pilgrim Nuclear Power Station; Engineering Specialist Plant Modifications InspectionSafe Shutdown
Operator Manual Action
Battery sizing
ML13346A47812 December 2013Acknowledgment Ltr to Meg Sheehan and Kevin Cassidy Re Compliance with the Endangered Species Act at the Pilgrim Nuclear Power Station
ML13346A48312 December 2013Acknowledgment Ltr to Stephen Dunker Re Safety at the Pilgrim Nuclear Power Station
ML14006A27312 December 2013NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power PlantEarthquake
ML14003A04612 December 2013FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Mission time
Grab sample
Fire Barrier
Slow transfer
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Locked High Radiation Area
B.5.b
Aging Management
Abnormal operational transient
Design basis earthquake
Scram Discharge Volume
Feedwater Controller Failure
Overtravel
License Renewal
Earthquake
Fuel cladding
Liquid penetrant
Pressure boundary leak
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Dissimilar Metal Weld
Flow Induced Vibration
Coast down
Unidentified leakage
TAC:MF117611 December 2013
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13350A48610 December 2013Emergency Response Data System 24/7 Implementation
ML13338A6679 December 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML13345A2675 December 2013Comment (00351) of Brian O'Malley on PR-51, Waste Confidence - Continued Storage of Spent Nuclear FuelProbabilistic Risk Assessment
Chernobyl
Press Release-I-13-042, NRC Assigns New Resident Inspector to Pilgrim Station5 December 2013Press Release-I-13-042: NRC Assigns New Resident Inspector to Pilgrim StationNew Resident Inspector
ML13333A9105 December 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool insHigh Radiation Area
Safe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
ML13339A2984 December 2013Comment (00330) of Lee Roscoe on PR-51, Waste Confidence - Continued Storage of Spent Nuclear FuelProbabilistic Risk Assessment
Chernobyl
Press Release-I-13-041, NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant2 December 2013Press Release-I-13-041: NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant
ML13336A8092 December 2013Webinar to Discuss Independent Spent Fuel Storage Installation (ISFSI) Basics and Planned Use at the Pilgrim Nuclear Power Station
ML15027A4582 December 2013G20132011 - Office of New York State Attorney General Letter NRC Enforcement Proceeding No. 2013-0192
ML14016A36127 November 2013Submittal of Information Relevant to NRC Enforcement Proceeding No. 2013-0192
ML13346A02626 November 2013Proposed License Amendment Request to Modify Technical Specification 4.3.4, Heavy Loads to Facilitate Dry Storage Handling OperationsSafe Shutdown
Earthquake
Control of Heavy Loads
ML13346A01326 November 2013Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentInternal Flooding
Fukushima Dai-Ichi
TAC:MF026426 November 2013
ML13346A01426 November 2013Response to Request for Additional Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic RequirementsPast operability
Fukushima Dai-Ichi
TAC:MF016026 November 2013
ML13323B47025 November 2013Request for Additional Information Regarding Relief Request PRR-22Nondestructive Examination
Large early release frequency
ML13326B08621 November 2013G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station
ML13346A93121 November 2013G20130876/LTR-13-0941 - May Ruth Seidel Ltr. Safety of the Pilgrim Nuclear Power Plant
IR 05000293/201300820 November 2013IR 05000293-13-008; 09/16/2013 - 10/03/2013; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution (Public)Significance Determination Process
Operability Determination
Fatigue Rule
Affidavit
ML14008A20419 November 2013Intention to Store Spent Fuel in an Independent Spent Fuel Storage Installation (ISFSI) Per 10 CFR 72.212
ML13323B09118 November 2013LTR-13-0897 - Robert Rio, Esq., Associated Industries of Massachusetts Ltr. Support for Pilgrim Nuclear Power Station
IR 05000293/201300414 November 2013IR 05000293-13-004; 07/01/2013 - 09/30/2013; Pilgrim Nuclear Power Station; Problem Identification and ResolutionSafe Shutdown
Half scram
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Downpower
ML13323A51814 November 2013Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated FuelSafe Shutdown
Reactor Vessel Water Level
Non-Destructive Examination
Stroke time
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
ML13318A86914 November 2013LTR-13-0884 Sen Edward Markey and Sen Bernard Sanders Letter Sufficient Funds to Operate Entergy'S Plants After Entergy Officials Contacted Senior NRC Officials to Complain About Pending NRC Oversight
ML13335A00213 November 2013G20130211 - 11/13/13 E-mail from T.Judson to R.Guzman - Supplement #5 to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim
ML13318A82211 November 2013G20130808/LTR-13-0883-Ticket - Meg Sheehan, Earthrise Law Center, Et Al., Ltr. Pilgrim Nuclear Power Station: Endangered Species Act Compliance
ML13312A6707 November 2013G20130804/LTR-13-0879 - Pine Dubois, Jones River Watershed Association, Massachusetts Email Flooding at the Pilgrim Nuclear Power Station
ML13311B3817 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (QAPM)
ML13310A3186 November 2013Assessment Follow Up Letter - 11/6/13
ML13309B6125 November 2013Letter from Richard Laufer Acting Secretary to Mary Lampert Re DD-13-02
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)4 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13294A20818 October 2013E-mail from T.Judson to R.Guzman G20130211 - Supplement #4 to 2.206 Petition Immediate Action - Vermont Yankee/Fitzpatrick/Pilgrim
ML13295A22417 October 201310 CFR 50.46(a)(3)(ii) Error Report in the Analyses of Emergency Core Cooling System