Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-PI-11-023, Reinstatement of Licensee Event Reports Associated with Flooding Scenarios31 March 2011Reinstatement of Licensee Event Reports Associated with Flooding ScenariosUnanalyzed Condition
CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))31 March 2011Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))
ML11207017831 March 2011NRC-DCM Annual Calculation, Enclosure 2
TAC:ME550328 March 2011
ML11087112128 March 2011Independent Spent Fuel and Monticello, Decommissioning Funding Status Reports
ML11087028027 March 2011Submittal of Guarantee of Payment of Deferred Premiums
ML11087025827 March 2011Submittal of Summary of Nuclear Property Insurance
ML14050A25823 March 2011E-mail Re Prairie Island Meeting and Open House from Al JuhnkeOpen House
ML11082055023 March 2011Letter to Northern States Power Company - Minnesota Regarding Open House and Public Meeting to Discuss the 2010 End-Of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating PlantOpen House
ML11082052923 March 2011Notice of Open House Meeting to Discuss the Results of NRC End-Of-Cycle Assessment of Prairie Island Nuclear Generating PlantOpen House
IR 05000282/201100822 March 2011IR 05000282-11-008, 05000306-11-008, on 08/23/2010 - 02/24/2011, Prairie Island Nuclear Generating Plant, Units 1 and 2, Review of Turbine Building Internal Flooding Vulnerability License RequirementsSafe Shutdown
Internal Flooding
Enforcement Discretion
Significance Determination Process
ML11074019322 March 2011Summary of March 3, 2011, Meeting to Discuss the Licensee'S February 3, 2011, License Amendment Request to Revise Surveillance Requirement Footnote in Technical Specification 3.8.1, AC Sources - Operating.
TAC:ME589818 March 2011
ML11084067018 March 2011Independent Spent Fuel Storage Installation, Transmittal of Controlled Copy of Safety Analysis Report - Revision 13Fuel cladding
TAC:ME589718 March 2011
L-PI-11-020, License Amendment Request to Revise the Physical Security Plan18 March 2011License Amendment Request to Revise the Physical Security Plan
L-PI-11-024, Supplement to License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.15 March 2011Supplement to License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.Offsite Circuit
ML1106203134 March 2011EOC Annual Assessment Letter and Inspection/Activity Plan
ML1106104754 March 2011Request for Additional Information Related to Request to Revise the Technical Specification 3.8.1, AC Sources - Operating, Footnote Requiring Battery Charger Modifications
ML1106009804 March 2011and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Request for Additional Information Related to License Amendment Request for Approval of Cyber Security PlanCyber Security
ML1106600793 March 2011March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant
ML1106104621 March 2011Ngp Units 1 and 2 - Acceptance Review of LAR to Revise Technical Specification (TS) 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications.
ML11060074928 February 2011Units 1 and 2, Fitness for Duty Performance Data for Period Ending December 31, 2010Fitness for Duty
L-PI-11-009, Independent Spent Fuel Storage Installation Annual Effluent Report, January Through December 201024 February 2011Independent Spent Fuel Storage Installation Annual Effluent Report, January Through December 2010
L-PI-11-019, Supplement to License Amendment Request to Exclude Dynamic Effects Associated with Certain Postulated Pipe Ruptures from Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to Requests for Clarification23 February 2011Supplement to License Amendment Request to Exclude Dynamic Effects Associated with Certain Postulated Pipe Ruptures from Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to Requests for ClarificationPressure boundary leak
ML11053039923 February 2011FRN: General Notice: Prairie Island Nuclear Generating Plant, Unit 1 - Correction to Notice of Consideration of Issuance of Amendments to Facility Operating Licenses Involving No Significant Hazards Consideration; Correction
ML11035019116 February 2011Prairie Island Target Set Inspection Report - 05000282-11-201 and 05000306-11-201 - Cover Letter
ML11049042916 February 2011Acceptance Review of LAR to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating
ML11047027916 February 2011Notice of Forthcoming Meeting with Licensee for Prairie Island Nuclear Generating Plant, Unit 1 to Discuss License Amendment Request to Revise Surveillance Requirement Footnote in Technical Specification 3.8.1, AC Sources - Operating.
ML11032035415 February 2011and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Request for Additional Information Related to License Amendment Request for Approval of Cyber Security PlanCyber Security
ML11046012215 February 2011Fm Notification of Potential Part 21 Report Serial Number 10-06 Re Identification of Facilities within the Us Which Fails to Comply or Contains a DefectLiquid penetrant
NRC-2011-0040, Sholly Report for Fr Publication on February 22, 201110 February 2011Sholly Report for Fr Publication on February 22, 2011Past operability
Pressure and Temperature Limits Report
Exemption Request
Fuel cladding
ML11041037310 February 2011Sholly Report for Fr Publication on February 22, 2011Past operability
Pressure and Temperature Limits Report
Exemption Request
Fuel cladding
ML1103105597 February 2011Summary of Closed Meeting to Discuss Proposed Physical Security Plan Changes
TAC:ME54474 February 2011
L-PI-11-008, License Amendment Request (LAR) to Revise Technical Specification (TS) 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications.4 February 2011License Amendment Request (LAR) to Revise Technical Specification (TS) 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications.
ML1103305184 February 2011Revised Review Schedule Regarding the License Renewal Application from Prairie Island Nuclear Generating Plant, Units 1 and 2 (Tac Nos. MD8528 and MD8529)
L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.3 February 2011License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.Offsite Circuit
IR 05000282/201000531 January 2011IR 05000282-10-005, 05000306-10-005, on 10/01/2010 - 12/31/2010, Prairie Island Nuclear Generating Plant, Units 1 and 2, Operability Evaluations, Event Follow-up and Other ActivitiesTime of Discovery
Mission time
Probabilistic Risk Assessment
Temporary Modification
Missed surveillance
Significance Determination Process
Job Performance Measure
Operability Determination
Fire Protection Program
Power Uprate
Measurement Uncertainty Recapture
ML11027016327 January 201111 Prairie Island Notification of NRC Inspection and Request for InformationBoric Acid
Non-Destructive Examination
Nondestructive Examination
Dissimilar Metal Weld
Scaffolding
IR 05000282/201050114 January 2011
L-PI-11-006, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI14 January 2011Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAIProbabilistic Risk Assessment
Power change
ML11019061914 January 2011Ltr. 01/14/2011 Prairie Island Re NRC Emergency Preparedness Annual Inspection Report No. 2010501
L-PI-11-004, Core Operating Limits Report (Colr), Cycle 26, Revision 313 January 2011Core Operating Limits Report (Colr), Cycle 26, Revision 3Shutdown Margin
IR 05000282/201040311 January 2011IR 05000282-10-403; 05000306-10-403(DRS); on 10/18/2010 - 12/16/2010; Prairie Island Nuclear Generating Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover LetterAffidavit
ML11014035111 January 2011Acknowledgement of Withdrawal of Request to Reactor Vessel Surveillance Capsule Withdrawal Schedule for Prairie Island Ngp
ML1101105087 January 2011Xcel (Monticello and Prairie Island) Cyber Security Plan LAR - Draft RAI #1Cyber Security
L-PI-11-001, Withdrawal of Request for Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule7 January 2011Withdrawal of Request for Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule
ML1100502705 January 2011Notice of Closed Pre-Application Meeting NSPM Staff to Discuss Proposed Physical Security Plan Changes That Will Be Submitted for NRC Review and Approval Via License Amendment Request
ML1035600105 January 2011Pre-Application Meeting to Discuss the Spent Fuel Pool Criticality and Extended Power Uprate License Amendment Requests