Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NG-11-0092, Regarding Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines31 March 2011Regarding Notification of Deviation from Boiling Water Reactor Vessel and Internals Project GuidelinesSafe Shutdown
EVT-1
ML11089082429 March 2011FW: ME5744 - Duane Arnold Adoption of TSTF-425 Phone Conference Call Agenda
L-2011-058, Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed Units23 March 2011Duane Arnold and Point Beach, Units 1 & 2 - Status Reports Decommissioning Funding Status Report for the Listed UnitsDecommissioning Funding Plan
ML11082056722 March 2011E-mail Regarding ME5744 - Duane Arnold - Application for Amendment Adopting TSTF-425 - Acceptance Review Decision
TAC:ME574422 March 2011
ML11082069922 March 20113/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment RequestInternal Flooding
Multiple Spurious Operation
ML11077034922 March 20113/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment RequestInternal Flooding
Multiple Spurious Operation
ML11081005521 March 2011Notice of Meeting/Open House with NextEra Energy Duane Arnold, LLC to Present the Results of NRC End-of-Cycle Assessment Regarding Duane Arnold Energy Center
L-2011-094, Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.18 March 2011Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
Anticipated operational occurrence
ML11080053618 March 2011Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
Anticipated operational occurrence
L-2011-094, Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.18 March 2011Comment (11) of Larry Nicholson, on Behalf of NextEra Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
ML11081055016 March 2011Bennett Brown, Et Al, Petitioners V. USNRC, Respondents, and Nexera Energy Duane Arnold, LLC, Et Al, Applicants for Intervention; Case No. 11-1441 - Motion for Intervention
L-2011-096, Nuclear Property Insurance - 10 CFR 50.54(w)(3)14 March 2011Nuclear Property Insurance - 10 CFR 50.54(w)(3)
ML11062047111 March 2011G20100688/EDATS: OEDO-2010-0925 - Response Letter to Thomas Saporito 10 CFR 2.206 Petition Requesting Enforcement Action Against Duane Arnold Energy Center (DAEC) Regarding Cracked WeldWeld Overlay
Through-Wall Leak
Dissimilar Metal Weld
ML1106206307 March 2011Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan (TAC No. Me4287)Cyber Security
ML1106104277 March 2011Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold
IR 05000331/20110014 March 2011Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331-11-001)
NG-11-0058, Inservice Inspection Report for Cycle 22 and Refueling Outage No. 22 of the Fourth 10-Year ISI Interval3 March 2011Inservice Inspection Report for Cycle 22 and Refueling Outage No. 22 of the Fourth 10-Year ISI IntervalWeld Overlay
ML11041045528 February 2011Issuance of Amendment Pertaining to Technical Specification Changes to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427)Safe Shutdown
High winds
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
Fire Protection Program
ML11059005924 February 2011Upcoming Duane Arnold Energy Center Problem Identification and Resolution (Pi&R) InspectionOperator Manual Action
Temporary Modification
Maintenance Rule Program
NG-11-0052, Fitness for Duty Performance Data for 201024 February 2011Fitness for Duty Performance Data for 2010Fitness for Duty
TAC:ME733623 February 2011
TAC:ME733723 February 2011
NG-11-0037, License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)23 February 2011License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Ultimate heat sink
Stroke time
Slow transfer
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Squib
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Overtravel
Offsite Circuit
Grace period
ML11048005415 February 2011Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades
ML11046048715 February 2011Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades
ML11041037310 February 2011Sholly Report for Fr Publication on February 22, 2011Past operability
Pressure and Temperature Limits Report
Exemption Request
Fuel cladding
NRC-2011-0040, Sholly Report for Fr Publication on February 22, 201110 February 2011Sholly Report for Fr Publication on February 22, 2011Past operability
Pressure and Temperature Limits Report
Exemption Request
Fuel cladding
ML1103903918 February 2011ME4546 - State Consultation Email Arnold Energy Center License AmendmentFire Barrier
IR 05000331/20100051 February 2011IR 05000331-10-005, on 10/01/2010 - 12/31/2010, Duane Arnold Energy Center, Radiological Hazard Assessment and Exposure Controls, Identification and Resolution of Problems, and Follow-Up of Events and Notices of Enforcement DiscretionHigh winds
High Radiation Area
Non-Destructive Examination
Water Inventory Control
Time to boil
Weld Overlay
Enforcement Discretion
Temporary Modification
VT-2
Locked High Radiation Area
Condition Adverse to Quality
Tornado-Generated Missile
Significance Determination Process
Job Performance Measure
Liquid penetrant
Fire Protection Program
Substantial potential for overexposure
Operability Assessment
Overexposure
ML11024012224 January 2011ME4984 - Verbal Scripts for Relief RequestWeld Overlay
Nondestructive Examination
ML11024048821 January 2011Ltr. 01/21/2011 Duane Arnold Re Confirmation of Initial License Examination
NG-11-0010, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines21 January 2011Notification of Deviation from Boiling Water Reactor Vessel and Internals Project GuidelinesEVT-1
IR 05000331/201040321 January 2011IR 05000331-10-403 (Drs), on 12/13/2010 - 12/17/2010, Duane Arnold Energy Center; Routine Security Baseline Inspection - Cover LetterSignificance Determination Process
Affidavit
IR 05000331/201050114 January 2011Letter 01/14/2011 Duane Arnold Re NRC Emergency Preparedness Annual Inspection Report No 05000331-10-501