Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07348042414 December 2007ASME Boiler & Pressure Vessel Code, Section XI-Reactor Pressure Vessel Head Penetration Tube Remote Inner-Diameter Temper Bead Repair - Generic Request for Relief G-RR-2 - Response to Request For..Hydrostatic
ML07351017514 December 2007American Society of Mechanical Engineers (ASME) Inservice Inspection (ISI) Program Request for Relief PDI-2 - Response to Request for Additional Information
ML07313000512 December 2007(Public Letter) - Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-solved TablesSignificance Determination Process
ML0733801526 December 2007Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Extension Request EvaluationCoatings
IR 05000390/20075016 December 2007IR 05000390-07-501; on 11/5-9/2007; Watts Bar Nuclear Plant Emergency Preparedness Inspection Report
ML0734400225 December 2007Westinghouse Eagle - 21 Process Protection System
ML0733900864 December 2007Risk Informed Inservice Inspection ProgramInternal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Large early release frequency
Maintenance Rule Program
Dissimilar Metal Weld
ML0734708074 December 2007Slides, Public Meeting Watts Bar Nuclear Plant Unit 2 Licensing and Inspection.Environmental Justice
ML0734400414 December 2007Transmittal of Update to TVA Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Rev. 18 for Browns Ferry, Sequoyah, and Watts BarFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
ML0734000983 December 2007IR 05000390-08-002 & 05000391-08-002, on 02/11-15/2008 & 02/25-29/2008, Watts Bar Baseline Occupational Radiation Safety InspectionHigh Radiation Area
Process Control Program
ML07320024430 November 2007WCAP-16760-NP, Rev. 0, Analysis of Capsule Z from the Tennessee Valley Authority, Watts Bar Unit 1 Reactor Vessel Radiation Surveillance Program.
ML07338126329 November 2007Plants - Changes to Distribution Lists for TVA Dockets
TAC:MD671527 November 2007
ML07331025327 November 2007Request for Additional Information Regarding Generic Letter Nos. 95-05, 95-05, 97-05, 97-06, 2004-01, and 2006-01 Pertaining to Stream Generator Tube Integrity
ML07325038727 November 2007Forthcoming Meeting with Tennessee Valley Authority, Re Licensing Basis Reconstitution for Watts Bar, Unit 2
ML07324012426 November 2007Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2
ML07311145026 November 2007Notice of Public Outreach Meeting Discuss Plans for Licensing and Inspection of the Watts Bar Nuclear Plant, Unit 2 (Invitation to State of Tenneesee Emergency Management Agency)
ML07311144026 November 2007Notice of Public Outreach Meeting Regarding Watts Bar Nuclear Plant, Unit 2 (Invitation to Mayor of Athens, Tn.)
ML07311140826 November 2007Notice of Public Outreach Meeting Discuss Plans for Licensing and Inspection of the Watts Bar Nuclear Plant, Unit 2 (Invitation to Mayor of Dayton, Tn)
ML07318050326 November 2007Notice of Public Outreach Meeting Regarding Watts Bar Nuclear Plant, Unit 2 (Invitation to Mayor of Decatur, Tn.)
ML07311146326 November 2007Public Outreach Meeting Regarding Watts Bar Nuclear Plant, Unit 2
ML07311137626 November 2007Notice of Public Outreach Meeting Discuss Plans for Licensing and Inspection of the Watts Bar Nuclear Plant, Unit 2
TAC:MD631126 November 2007
ML07311000220 November 2007Safety Evaluation of Relief Request No. SNBR-1 the Second 10-Year Inservice Inspection and Examination Program for SnubbersIncorporated by reference
ML07310042320 November 2007Request for Additional Information Regarding Technical Specification Change TS-07-04, Reactor Trip System/Engineered Safety Feature Logic, Reactor Trip Breaker Allowable Outage Time and Surveillance Testing Interval RelaxationsProbabilistic Risk Assessment
ML0731100269 November 2007Second Request for Additional Information Regarding Inservice Inspection Request for Relief No. PDI-2
TAC:MD73939 November 2007
ML0732002439 November 2007Analysis of Capsule Z from Reactor Vessel Radiation Surveillance Program
Press Release-07-148, - NRC Meeting Dec. 4 in Evansville, Tenn., to Discuss Oversight of Watts Bar Unit 2 Construction8 November 2007Press Release-07-148 - NRC Meeting Dec. 4 in Evansville, Tenn., to Discuss Oversight of Watts Bar Unit 2 ConstructionOpen House
ML0730604037 November 2007Notice of Public Outreach Meeting on Watts Bar Nuclear Plant Unit 2 Operating License ApplicationOpen House
ML0730901315 November 2007Revised Notice of Meeting with Tennessee Valley Authority to Discuss Selected Topics Relating to the Design and Construction of Watts Bar, Unit 2
IR 05000390/20074025 November 2007IR 05000390-07-402, on 10/05/2007, Watts Bar Nuclear Plant - NRC Physical Security Baseline Inspection. Cover Letter OnlySignificance Determination Process
Affidavit
ML0731201361 November 2007Distribution Lists for TVA Nuclear Generation Development and Construction Projects
ML07304012631 October 2007Notice of Meeting with Tennessee Valley Authority Regarding Selected Topics Relating to the Design and Construction of Watts Bar, Unit 2
IR 05000390/200700429 October 2007IR 05000390-07-004, 05000391-07-004, on 07/01/2007 - 09/30/2007; Watts Bar, Units 1 & 2; Maintenance Effectiveness and Problem Identification and ResolutionBoric Acid
Fire Barrier
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Overtravel
ML07338094826 October 2007Technical Specifications Change 07-14, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with Technical Specification Task Force (TSTF)-448, Revision 3, Using.Safe Shutdown
Incorporated by reference
ML07305002325 October 2007Letter Submitting Changes to Distribution Lists for TVA Dockets
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07298066424 October 2007Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits
IR 05000390/200700823 October 2007IR 05000390-07-008, 05000391-07-008, on 8/27/07 - 09/14/07, Watts Bar Units 1 and 2; Biennial Inspection of Problem Identification and ResolutionSafe Shutdown
High Radiation Area
Internal Flooding
Operator Manual Action
Inattentive
ML07284033723 October 2007Information Needed for Licensing Review Reconstitution
ML07257031922 October 2007Possible Completion of Construction ActivitiesBackfit
ML07291033111 October 2007Unit 2 - Exemptions, Reliefs, Deviations and ExceptionsFire Barrier
Post Accident Monitoring
Hydrostatic
Emergency Lighting
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0727604492 October 2007Watts Bar Nuclear Plant (WBN) Unit 1, Generic Letter 2004-02, Recirculation During Design-Basis Accidents at Pressurized Water Reactors - Request for Extension of Completion Date for Corrective ActionsSafe Shutdown
Foreign Material Exclusion
ML0727601462 October 2007Region II Management Change in Operator Licensing
ML0727601121 October 2007Changes to Distribution Lists for TVA Dockets
ML07267003521 September 2007Senior Manager Holding an Inactive Operator License (Case. No. 2-2007-007)
IR 05000390/200740320 September 2007IR 05000390-07-403 on 05/16 - 05/18/2007, Watts Bar Nuclear Plant - NRC InspectionRAMQC
Affidavit
ML07254045518 September 2007Corrected License PageSafe Shutdown
B.5.b Mitigating Strategies
Fire Protection Program