IR 05000382/2007402 | 21 December 2007 | IR 05000382-07-402; on 11/26/07 - 11/29/07; Waterford Steam Electric Station, Unit 3; Security Team Inspection - Letter Only | Affidavit |
W3F1-2007-0065, Response to NRC RAI on GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | 18 December 2007 | Response to NRC RAI on GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
W3F1-2007-0062, Supplement 2 to Request for Alternative W3-ISI-005 Request to Use ASME Code Case N-716 | 12 December 2007 | Supplement 2 to Request for Alternative W3-ISI-005 Request to Use ASME Code Case N-716 | Internal Flooding |
W3F1-2007-0059, Response to Request for Additional Information on Request for Alternative W3-ISI-004 - Proposed Alternative to Second Interval ISI Examinations, Waterford Steam Electric Station, Unit 3 | 11 December 2007 | Response to Request for Additional Information on Request for Alternative W3-ISI-004 - Proposed Alternative to Second Interval ISI Examinations, Waterford Steam Electric Station, Unit 3 | Weld Overlay Finite Element Analysis Dissimilar Metal Weld DM weld Scaffolding |
ML073390065 | 10 December 2007 | Approval of Extension Request, Corrective Actions Due Date, GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors | Foreign Material Exclusion |
W3F1-2007-0044, Startup Test Activity Reduction (STAR) Summary Report from 14th Refueling Outage | 10 December 2007 | Startup Test Activity Reduction (STAR) Summary Report from 14th Refueling Outage | |
CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan | 30 November 2007 | Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Stroke time Abnormal operational transient Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Unidentified leakage |
W3F1-2007-0061, Supplement to Request for Alternative W3-ISI-005 Request to Use ASME Code Case N-716 | 30 November 2007 | Supplement to Request for Alternative W3-ISI-005 Request to Use ASME Code Case N-716 | Weld Overlay Internal Flooding Probabilistic Risk Assessment Large early release frequency Scaffolding |
ML073240010 | 30 November 2007 | Request for Additional Information on the Request for Alternative W3-ISI-004, Proposed Alternative to Second Interval Inservice Inspection Examinations (Tac No. MD6351) | Weld Overlay Nondestructive Examination Finite Element Analysis Dissimilar Metal Weld |
CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals | 29 November 2007 | Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals | Safe Shutdown Ultimate heat sink |
ML073190171 | 23 November 2007 | Summary of Conference Calls October 12-15, 2007, Between NRC, Region IV, and Representatives of Waterford 3 Regarding 2007 Mid-Cycle Steam Generator Inspections | |
L-07-004, RAI, Request for Additional Information GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | 20 November 2007 | RAI, Request for Additional Information GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
TAC:MD4395 | 20 November 2007 | ||
ML073110441 | 20 November 2007 | RAI, Request for Additional Information GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
W3F1-2007-0051, Request for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02 | 14 November 2007 | Request for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02 | Coatings Foreign Material Exclusion |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | |
IR 05000382/2007004 | 9 November 2007 | IR 05000382-07-004; 07/08/2007 - 10/07/2007; Waterford Steam Electric Station, Unit 3 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Enforcement Discretion Emergency Lighting Locked High Radiation Area Significance Determination Process Hemyc Fuel cladding Fire Protection Program Grace period |
CNRO-2007-00039, Entergy Operations, Inc. - Pending License Amendment Requests Affected by TSTF-500 | 8 November 2007 | Entergy Operations, Inc. - Pending License Amendment Requests Affected by TSTF-500 | |
IR 05000382/2007302 | 7 November 2007 | NRC Initial Operator Licensing Examination Approval (05000382-07-302) | |
W3F1-2007-0055, Response to NRC RIS 2007-17, Preparation and Scheduling of Operator Licensing Examinations | 7 November 2007 | Response to NRC RIS 2007-17, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML073030464 | 25 October 2007 | Enertech Notification of Potential Part 21 Reportable Condition for Enertech Cartridge Solenoid Valve | |
ML072980670 | 24 October 2007 | Meeting Presentation on GEH Chemical Effects Testing Update | |
ML072980664 | 24 October 2007 | Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits | |
TAC:MD7061 | 18 October 2007 | ||
W3F1-2007-0046, Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716 | 18 October 2007 | Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716 | Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Scaffolding |
ML072920433 | 18 October 2007 | Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716 | Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Scaffolding |
ML072900038 | 18 October 2007 | (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415) | Significance Determination Process |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072670108 | 10 October 2007 | 9/06/2007 Waterford Steam Electric Station, Unit No. 3 - Meeting Handouts | |
ML072670102 | 10 October 2007 | 9/06/2007 Summary of Meeting with Representatives of EOI for Waterford 3 Batwing Issues and Planned Actions During the Mid-Cycle Outage | |
CNRO-2007-00036, Updated Schedule for Submittal of Future License Renewal Applications for Entergy Plants | 4 October 2007 | Updated Schedule for Submittal of Future License Renewal Applications for Entergy Plants | |
W3F1-2007-0045, Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification | 4 October 2007 | Supplement to the ECCS Performance Analysis Submittal in Support of Next Generation Fuel - 1999 EM Optional Steam Cooling Model Justification | Coatings |
TAC:MD5426 | 25 September 2007 | ||
ML072280001 | 25 September 2007 | Environmental Assessment and Finding of No Significant Impact for Proposed License Amendment and Exemption from 10 CFR 50.46 and Appendix K - Use of Optimized Zirlo Fuel Rod Cladding | |
CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) | 24 September 2007 | Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) | |
ML072560026 | 24 September 2007 | Withdrawal of W3-ISI-002, Request for Alternative | Dissimilar Metal Weld |
TAC:L24117 | 14 September 2007 | ||
TAC:L24116 | 14 September 2007 | ||
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
ML072490169 | 7 September 2007 | Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by Confirmatory Action Letter NRR-07-006 | Finite Element Analysis Dissimilar Metal Weld |
ML072430855 | 31 August 2007 | Mid-Cycle Performance Review and Inspection Plan - Waterford | |
CNRO-2007-00035, Entergy Operations, Inc. - Updated Correspondence Service List | 30 August 2007 | Entergy Operations, Inc. - Updated Correspondence Service List | |
ML072390156 | 23 August 2007 | Errata of Waterford Steam Electric Station, Unit 3 - Notification of NRC Initial Operator Licensing Examination 05000382-07-302 | |
W3F1-2007-0042, Fitness for Duty Performance Data Six Month Report for Period January 1 Through June 30, 2007 | 23 August 2007 | Fitness for Duty Performance Data Six Month Report for Period January 1 Through June 30, 2007 | Fitness for Duty |
W3F1-2007-0033, License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability | 16 August 2007 | License Amendment Request NPF-38-273 to Modify Requirements Regarding Control Room Envelope Habitability | Safe Shutdown Incorporated by reference Grace period |
ML072330475 | 14 August 2007 | Rosemount 1154 Pressure Transmitter Calibration Problem | |
ML072210439 | 13 August 2007 | Notice of Forthcoming Meeting with Entergy Operations, Inc. - Outline Plans for Mid-Cycle Outage Steam Generator Batwing Issues at Waterford Steam Electric Station, Unit 3 | |
W3F1-2007-0038, Emergency Core Cooling System Performance Analysis | 9 August 2007 | Emergency Core Cooling System Performance Analysis | Boric Acid Coatings Exemption Request Fuel cladding |