MONTHYEARML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) ML20182A4472020-07-0808 July 2020 Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML20106E8882020-04-20020 April 2020 Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes ML20059K1562020-03-19019 March 2020 Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc ML20013G2592020-02-0707 February 2020 Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 ML19298B9182019-11-0505 November 2019 Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 ML19247C3882019-09-10010 September 2019 Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18120A3112018-05-10010 May 2018 Summary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3 ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18059A0152018-03-0505 March 2018 Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 ML18005A0992018-01-25025 January 2018 Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17331A0882017-12-0606 December 2017 Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 ML17174B1922017-06-29029 June 2017 Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 ML17174B2262017-06-28028 June 2017 Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) ML16364A2902017-01-24024 January 2017 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit ML16323A2292017-01-24024 January 2017 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application ML16125A0832016-05-0404 May 2016 Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance ML15239A7392015-08-31031 August 2015 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15117A5032015-05-0606 May 2015 April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report 2024-02-26
[Table view] |
Text
October 10, 2007 LICENSEE: ENTERGY OPERATIONS INC. (EOI)
FACILITY: WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3)
SUBJECT:
SUMMARY
OF SEPTEMBER 6, 2007, MEETING WITH REPRESENTATIVES OF EOI FOR WATERFORD 3 BATWING ISSUES AND PLANNED ACTIONS DURING THE MID-CYCLE OUTAGE On Thursday, September 6, 2007, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) staff and representatives of EOI, the licensee for Waterford, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting, held at the request of the licensee, was to provide to the NRC staff with an outline of its plans with regard to the batwing issues for the mid-cycle outage.
The presentation slides used during the meeting by the licensee, Enclosure 1, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML072670108). The licensee outlined the Steam Generator monitoring activities, the overview of batwing mitigation strategy, activities planned during the mid-cycle outage, including special inspection tooling, inspection plans, contingency planning and evaluation, and foreign object search and retrieval processes.
Various aspects of EOI-generated Decision Tree were discussed which included visual and remote inspection plans, contingencies, testing and repair, stabilization of batwings, condition of tubes (dents and deformations), and acceptance criteria.
The licensee also stated the intent to review the acceptance criteria to ensure the criteria bound the analyses and perform sensitivity analyses, if out of bounds. The licensee also provided the mid-cycle communication plan between the licensee and the NRC staff that will help ensure prompt information exchange.
There were no members of the public represented at the meeting. A list of attendees is provided as Enclosure 2 is to this memorandum and the agenda for the meeting is available in ADAMS Accession No. ML072210439. There were no handouts from the NRC staff.
Please direct any inquiries to me at 301-415-1480.
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. Licensees Handout
- 2. List of Attendees cc w/encls: See next page
Pkg ML072670094 Mtg Notice ML072210439, Mtg Summary ML072670102, Licensee Handout ML072670108 OFFICE DORL/LPL4/PM DORL/LPL4/LA DORL/LPL4/BC NAME NKalyanam JBurkhardt THiltz DATE 10/7/07 9/27/07 10/10/07 LICENSEE'S HANDOUT FOR SEPTEMBER 6, 2007, MEETING AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM ACCESSION NO. ML072670108 The licensee's handout (58 pages) contained presentation slides entitled, "Entergy -
Waterford 3 Meeting with NRC on Steam Generator Batwing Issue, September 6, 2007.
ENCLOSURE 1
ATTENDANCE LIST SEPTEMBER 6, 2007 WATERFORD 3 STEAM GENERATOR BATWING MID-CYCLE PLANNED ACTIVITIES NAME ORGANIZATION* TEL. NO.
Rex Putnam EOI/Waterford 3 504-464-3877 Robert Murillo EOI/Waterford 3 504-739-6715 Joe Kowalewski EOI/Waterford 3 504-464-3178 Robert Quinn EOI/Waterford 3 504-739-6387 John MaCann EOI/Waterford 3 914-272-3370 Keith Nichols Westinghouse 504-739-6310 Bill Cullen Westinghouse 724-722-5314 Peter Nelson Westinghouse 724-722-5971 Bill Heilker Westinghouse 423-752-2868 Jeff Hall Westinghouse 724-722-5134 Jeff Clark NRC/Region IV 817-860-8147 William B. Jones NRC/Region IV 817-860-8185 Allen Hiser NRC/NRR/CSGB 301-415-5650 Emmett Murphy NRC/NRR/CSGB 301-415-2710 Ken Karwoski NRC/NRR/CSGB 301-415-2752 Matt Yoder NRC/NRR/CSGB 301-415-4017 Andrew Johnson NRC/NRR/CSGB 301-415-1475 Margaret Stambough NRC/RES 301-415-7069 N. Kalyanam NRC/NRR/DORL 301-415-1480
- EOI Entergy Operations Inc.
NRC Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation CSGB Steam Generator Tube Integrity & Chemical Engineering Branch RES Office of Nuclear Regulatory Research DORL Division of Operating Reactor Licensing ENCLOSURE 2
Waterford Steam Electric Station, Unit 3 cc:
Senior Vice President Louisiana Department of Environmental Entergy Nuclear Operations Quality P.O. Box 31995 Radiological Emergency Planning Jackson, MS 39286-1995 and Response Division P.O. Box 4312 Senior Vice President and COO Baton Rouge, LA 70821-4312 Entergy Operations, Inc.
P.O. Box 31995 Louisiana Department of Environmental Jackson, MS 39286-1995 Quality Office of Environmental Compliance Vice President, Operations Support P.O. Box 4312 Entergy Services, Inc. Baton Rouge, LA 70821-4312 P.O. Box 31995 Jackson, MS 39286-1995 Parish President Council St. Charles Parish Site Vice President P.O. Box 302 Waterford Steam Electric Station, Unit 3 Hahnville, LA 70057 Entergy Operations, Inc.
17265 River Road Chairman Killona, LA 70057-3093 Louisiana Public Services Commission P.O. Box 91154 General Manager, Plant Operations Baton Rouge, LA 70825-1697 Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. Richard Penrod, Senior Environmental 17265 River Road Scientist/State Liaison Officer Killona, LA 70057-3093 Office of Environmental Services Northwestern State University Director, Nuclear Safety & Licensing Russell Hall, Room 201 Entergy Services, Inc. Natchitoches, LA 71497 440 Hamilton Avenue White Plains, NY 10601 Resident Inspector Waterford NPS Director, Nuclear Safety Assurance P.O. Box 822 Entergy Operations, Inc. Killona, LA 70057-0751 17265 River Road Killona, LA 70057-3093 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Senior Manager, Nuclear Safety 611 Ryan Plaza Drive, Suite 400
& Licensing Arlington, TX 76011 Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 September 2007