Issue date | Title | Topic | |
---|---|---|---|
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
ML073550599 | 19 December 2007 | Units, 1 and 2, Tech Spec Pages for Amendments 257 and 256 Regarding Increase in Lead Rod Average Burnup Limit | |
ML073230074 | 19 December 2007 | Units, 1 and 2, Issuance of Amendments 257 and 256 Regarding Increase in Lead Rod Average Burnup Limit | |
ML073511682 | 17 December 2007 | Proposed License Amendment Request, One-Time Five-Year Extension to Type a Test Interval | Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Tornado Generated Missile Design basis earthquake Large early release frequency Maintenance Rule Program |
TAC:MD7535 | 17 December 2007 | ||
ML073450594 | 13 December 2007 | Approval of Extension of Completion Dates for Corrective Actions of Generic Letter 2004-02 | Probabilistic Risk Assessment Large early release frequency |
ML073460758 | 12 December 2007 | Virginia'S Request for ERDS MOU | |
TAC:MD7236 | 11 December 2007 | ||
ML073380143 | 11 December 2007 | Steam Generator Tube Inspections | |
ML073270047 | 10 December 2007 | Environmental Assessment Related to Your Application for License Amendment Regarding Increase in the Lead Rod Average Burnup Limit (TAC MD716 and MD4717) | |
ML073440211 | 7 December 2007 | Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters | |
ML073380704 | 6 December 2007 | Request for Additional Information (RAI) Regarding the Proposal to Increase Maximum Service Water Temperature Limit | |
ML073400528 | 5 December 2007 | Cycle 21 Core Operating Limits Report | |
ML073410347 | 5 December 2007 | Cycle 22 Core Operating Limits Reports | |
ML073240098 | 29 November 2007 | Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 | |
TAC:MD6144 | 29 November 2007 | ||
ML073321271 | 28 November 2007 | Proposed Additional Technical Specifications Change, Operable Definition Modification for Air Handling Units While in Temporary 45-day Allowed Outage Times to Perform Required Surveillances | Probabilistic Risk Assessment Job Performance Measure |
ML073110104 | 26 November 2007 | Virginia Electric and Power Company, Units 1 and 2 Request for Withholding Information from Public Disclosure for Surry Power Station, | |
IR 05000280/2007008 | 26 November 2007 | IR 05000280-07-008, 05000281-07-008; 09/10/2007 - 10/12/2007; Surry Power Station, Units 1 & 2; Biennial Inspection of the Identification and Resolution of Problems | Significance Determination Process Operability Determination Maintenance Rule Program Flow Induced Vibration |
ML073190553 | 15 November 2007 | North Anna, Units 1 and 2, and Surry, Units 1& 2, Request for Extension of Completion Dates for Corrective Actions Regarding NRC Generic Letter 2004-02 | Safe Shutdown Probabilistic Risk Assessment Coatings Large early release frequency Dissimilar Metal Weld |
ML073120506 | 15 November 2007 | Issuance of Amendments Use of Gothic Code for Recirculation Spray System Exigent Circumstances | Safe Shutdown |
ML073230610 | 15 November 2007 | Technical Specifications for Surry, Units 1 and 2, Issuance of Amendments Use of Gothic Code for Recirculation Spray System Exigent Circumstances | |
ML073190271 | 14 November 2007 | Proposed License Amendment Request Re Increased Maximum Service Water Temperature Limit, Request for Additional Information | |
ML073170675 | 9 November 2007 | Alternative Requests for Use of ASME Code Cases N-756 and N-757 Request for Additional Information | |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | |
ML073110519 | 5 November 2007 | Interim Report for a Failure to Comply Under the Provisions of 1OCFR21 | Liquid penetrant |
ML073100827 | 2 November 2007 | Exigent License Amendment Request, Alternative Containment Analysis Methodology Request Information - Gothic Model Input Files | |
ML072890664 | 1 November 2007 | Summary of Meeting with Dominion Nuclear Regarding Chemical Testing Methods Related to GSI-191 | |
ML073040033 | 1 November 2007 | Public Meeting Slides for Meeting with Dominion Nuclear | Boric Acid Coatings |
TAC:MD5910 | 31 October 2007 | ||
ML073030405 | 31 October 2007 | E. Marinos Memo Technical Assistance Request-Dominion Resources, Inc.'S December 6, 2006, Request for Exemption from 10 CFR 74.13(a) Requirements Regarding Material Status Report Submittal Time Frame | Exemption Request |
IR 05000280/2007004 | 26 October 2007 | IR 05000280-07-004, 05000281-07-004 & 07200055-07-001; on 07/01/2007 - 09/30/2007, Virginia Electric and Power Company (Vepco); Surry Power Station Units 1 and 2; and Independent Spent Fuel Storage Installation; Routine Integrated Inspectio | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Temporary Modification Significance Determination Process Maintenance Rule Program Overexposure |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML073270501 | 25 October 2007 | Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 | Significance Determination Process |
ML073030464 | 25 October 2007 | Enertech Notification of Potential Part 21 Reportable Condition for Enertech Cartridge Solenoid Valve | |
ML072960298 | 24 October 2007 | Notice of Consideration of Issuance of Amendment Under Exigent Circumstances, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing | Safe Shutdown |
ML072980048 | 24 October 2007 | Issuance of Amendment Under Exigent Circumstances | |
ML072970605 | 24 October 2007 | Exigent License Amendment Request Re Alternative Containment Analysis Methodology Supporting Information - Gothic Model Input Files | |
TAC:MD7033 | 24 October 2007 | ||
ML072950106 | 19 October 2007 | Notification of Surry Power Station - Component Design Bases Inspection NRC Inspection Report 05000280-08-006 & 05000281-08-006 | Probabilistic Risk Assessment |
ML072900477 | 15 October 2007 | Technical Specifications, Revised Technical Specification Surveillance Requirement for the Inspection of the Containment Recirculation Sump (Tac Nos. MD3168 and MD3169) | |
ML072690396 | 15 October 2007 | License Amendments, Revised Technical Specification Surveillance Requirement for the Inspection of the Containment Recirculation Sump (Tac Nos. MD3168 and MD3169) | Foreign Material Exclusion Earthquake |
ML072850909 | 11 October 2007 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Non-Destructive Examination Missed surveillance Pressure Boundary Leakage |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072710013 | 3 October 2007 | Request for Additional Information Regarding the Proposal to Increase Maximum Service Water Temperature Limit | |
ML072770043 | 3 October 2007 | Mur Power Uprate Acceptance Review - Guidance for Meteorological Data Submitted for a License Amendment | |
ML072760146 | 2 October 2007 | Region II Management Change in Operator Licensing | |
Press Release-II-07-048, - NRC Assigns New Senior Resident Inspector to Surry Nuclear Power Plant | 2 October 2007 | Press Release-II-07-048 - NRC Assigns New Senior Resident Inspector to Surry Nuclear Power Plant | New Resident Inspector |
ML073040030 | 1 October 2007 | Sign-In Roster for Public Meeting with Dominion Nuclear |