Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000272/200740319 December 2007IR 05000272-07-403, 05000311-07-403 and 05000354-07-403, on 11/5/2007-11/9/2007, Salem and Hope Creek Generating Stations, Security Training; Physical ProtectionSignificance Determination Process
Affidavit
ML07347067913 December 2007ROP 8 - Hope Creek - Change to Inspection Plan, 12/13/07
LR-N07-0316, Response to RAI on NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.12 December 2007Response to RAI on NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
TAC:MD933712 December 2007
LR-N07-0284, Submittal of Relief Requests Associated with the Third Inservice Inspection (ISI) Interval12 December 2007Submittal of Relief Requests Associated with the Third Inservice Inspection (ISI) IntervalVT-2
Dissimilar Metal Weld
LR-N07-0299, Notification of Data Point Library Changes for the Emergency Response Data System (ERDS)5 December 2007Notification of Data Point Library Changes for the Emergency Response Data System (ERDS)
ML07346079330 November 2007Hope Creek, Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate
IR 05000354/200730126 November 2007Er 05000354-07-301; Exam Dates 9/24-28, 2007; Hope Creek Generating Station; Initial Senior Reactor Operator (SRO) Licensing Examination
HCH-2007-113, New Jersey Pollutant Discharge Elimination System, Discharge Monitoring Report for Month of October 200715 November 2007New Jersey Pollutant Discharge Elimination System, Discharge Monitoring Report for Month of October 2007NJPDES
LR-N07-0289, Plans Related to Steam Dryer Evaluation15 November 2007Plans Related to Steam Dryer Evaluation
ML07299003914 November 2007Request for Additional Information on the Response to Generic Letter 2007-01
ML07282027713 November 2007Request for Additional Information Regarding Request for Extended Power Uprate (TAC MD3002) - Letter & Encl. 1
IR 05000354/20070049 November 2007IR 05000354-07-004; on 07/01/2007 - 09/30/2007; Hope Creek Generating Station, Equipment Alignment, Operability Evaluations, Integrated Inspection ReportSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Slow transfer
Internal Flooding
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
ML0732300969 November 2007Discharge Confirmation Report - Retraction of Reported Discharge to the Delaware RiverHigh winds
NJPDES
IR 05000354/20070068 November 2007IR 05000354-07-006, on 09/17/2007 - 09/28/2007; Hope Creek Generating Station; Biennial Baseline Inspection of the Identification and Resolution of Problems (Pi&R)Condition Adverse to Quality
Significance Determination Process
Operability Determination
LR-N07-0285, Reactor Vessel (N2G) Recirculation Inlet Nozzle Safe-End to Nozzle Weld Joint Weld Non-Destructive Examination Information1 November 2007Reactor Vessel (N2G) Recirculation Inlet Nozzle Safe-End to Nozzle Weld Joint Weld Non-Destructive Examination InformationNondestructive Examination
Dissimilar Metal Weld
LR-N07-0281, Response to Request for Additional Information, Relief Request HC-RR-I2-W02 Proposed Alternative Repair Method30 October 2007Response to Request for Additional Information, Relief Request HC-RR-I2-W02 Proposed Alternative Repair MethodWeld Overlay
LR-N07-0282, Response to Request for Additional Information, Relief Request HC-RR-I2-W0230 October 2007Response to Request for Additional Information, Relief Request HC-RR-I2-W02Weld Overlay
Liquid penetrant
ML07360092229 October 2007NRC Final Exam Results Ltr. W/O Encl. Dtd 10/29/07 (Folder 1)
LR-N07-0279, Response to Request for Additional Information, Relief Request HC-RR-I2-W02, Proposed Alternative Repair Method29 October 2007Response to Request for Additional Information, Relief Request HC-RR-I2-W02, Proposed Alternative Repair MethodWeld Overlay
ML07304006829 October 2007Public-Salem Nuclear Generating Station, Unit Nos. 1 and 2, and Hope Creek Generating Station-Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-SolvedSignificance Determination Process
ML07352053928 October 2007LTR-07-0819 - Ltr. Tom Gurdziel, Concerns New Generation of Nuclear Plants
LR-N07-0278, Relief Request HC-RR-I2-W03 Retraction26 October 2007Relief Request HC-RR-I2-W03 RetractionWeld Overlay
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
LR-N07-0275, Core Operating Limits Report - Cycle 1525 October 2007Core Operating Limits Report - Cycle 15Shutdown Margin
Minimum Critical Power Ratio
LR-N07-0276, Relief Request HC-RR-I2-W03 Proposed Alternative Repair Method24 October 2007Relief Request HC-RR-I2-W03 Proposed Alternative Repair MethodNon-Destructive Examination
Weld Overlay
Hydrostatic
Liquid penetrant
LR-N07-0274, Plans Related to Steam Dryer Evaluation23 October 2007Plans Related to Steam Dryer Evaluation
HCH-2007-104, Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report23 October 2007Transmittal of New Jersey Pollutant Discharge Elimination System Discharge Monitoring ReportNJPDES
LR-N07-0273, Relief Request HC-RR-I2-W02, Proposed Alternative Repair Method19 October 2007Relief Request HC-RR-I2-W02, Proposed Alternative Repair MethodWeld Overlay
Hydrostatic
Nondestructive Examination
Liquid penetrant
ML07296025719 October 2007Final Qa/Related Forms (Folder 1)Job Performance Measure
TAC:MD702819 October 2007
ML07248002216 October 2007License Amendment, Issuance of Amendment Removal of Turbine First Stage Pressure Values from Technical SpecificationsProbabilistic Risk Assessment
Abnormal operational transient
ML07285003716 October 2007Technical Specifications, Issuance of Amendment Removal of Turbine First Stage Pressure Values from Technical SpecificationsShutdown Margin
ML07263006212 October 2007PSEG Nuclear LLC, Withholding from Public Disclosure, Gnf S-0000-0068-2643 Agnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR (Safety Limit Minimum Critical Power Ratio), Hope Creek (KT1) CycleSafety Limit Minimum Critical Power Ratio
ML07220009312 October 2007Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate
ML07220014112 October 2007Draft Environmental Assessment & Finding of No Significant Impact Related to Proposed License Amendment to Increase the Maximum Reactor Power LevelOffsite Dose Calculation Manual
NJPDES
Environmental Justice
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0726301541 October 2007PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Letter, Dated August 3, 2007, Subject: Response to Request for Additional Information Request for License Amendment - E
ML0726402341 October 2007Notice of Closed Meeting with PSEG Nuclear LLC (Licensee) Regarding an Application for Extended Power Uprate for Hope Creek Generating Station
LR-N07-0261, 10CFR50.46 Report, Informing of Changes in the Application of the Emergency Core Cooling System Evaluation Modes28 September 200710CFR50.46 Report, Informing of Changes in the Application of the Emergency Core Cooling System Evaluation Modes
ML07305041028 September 2007PI & R 05-354, 2007-006, Hope Creek Generating Station
LR-N07-0228, Core Operating Limits Reports - Cycle 14, Revision 126 September 2007Core Operating Limits Reports - Cycle 14, Revision 1Shutdown Margin
ML07243080024 September 2007PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Regarding Slides Presented at a Public Meeting, Dated August 17, 2007 (TAC No. MD3002.`
HCH-2007-088, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for August 200724 September 2007New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for August 2007NJPDES
ML07242037024 September 2007Summary of Meeting with PSEG Nuclear LLC Regarding an Application for an Extended Power Uprate for the Hope Creek Generating Station Regarding Steam Dryer AnalysisFinite Element Analysis
ML07261011224 September 2007PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Regarding Letter, Dated September 11, 2007, Subject: Revised CDI Report 07-17P, Stress Assessment of Hope Creek, Unit 1, Steam Dryer Based on Revisi
ML07264024620 September 2007Operator Licensing Examination Approval (Hope Creek Generating Station)
NL-07-1760, J. M. Farley, Units 1 and 2 - Relief Request Q1/2B13-RR-V-2, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i)17 September 2007J. M. Farley, Units 1 and 2 - Relief Request Q1/2B13-RR-V-2, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i)
ML07292021617 September 2007Exam Handouts to Applicants (Folder 3)
ML07292021417 September 2007Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Hydrostatic
Fire impairment
Squib
Locked High Radiation Area
Overtravel
Power change