ML072850037

From kanterella
Jump to navigation Jump to search

Technical Specifications, Issuance of Amendment Removal of Turbine First Stage Pressure Values from Technical Specifications
ML072850037
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/16/2007
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Ennis R, NRR/DORL, 415-1420
Shared Package
ML072480010 List:
References
TAC MD6165
Download: ML072850037 (3)


Text

(4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to'possess, butnot separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3339 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 172, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Inservice Testing of Pumps and Valves (Section 3.9.6, SSER No. 4)*

This License Condition was satisfied as documented in the letter from W. R. Butler (NRC) to C. A. McNeill, Jr.

(PSE&G) dated December 7, 1987. Accordingly, this condition has been deleted.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 172

TABLE 3.3.1-1 (Continued)

REACTOR PROTECTION SYSTEM INSTRUMENTATION TABLE NOTATIONS (a) A channel may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance without placing the trip system.in the tripped condition provided at least one OPERABLE channel in the same trip system is monitoring that parameter.

(b) This function shall be automatically bypassed when the reactor mode switch is in the Run position.

(c) Unless adequate shutdown margin has been demonstrated per Specification 3.1.1, the "shorting links" shall be removed from the RPS circuitry prior to and during the time any control rod is withdrawn*.

(d) The non-coincident NMS reactor trip function logic is such that all channels go to both trip systems. Therefore, when the "shorting links" are removed, the Minimum OPERABLE Channels Per the Trip System are 4 APRMS, 6 IRMS and 2 SRMS.

(e) An APRM channel is inoperable if there are less than 2 LPRM inputs per level or less than 14 LPRM inputs to an APRM channel.

(f) This function is not required to be OPERABLE when the reactor pressure vessel head is removed per Specification 3ý10.1.

(g) This function shall be automatically bypassed when the reactor mode switch is not in the Run position.

(h) This function is not required to be OPERABLE when PRIMARY CONTAINMENT INTEGRITY is not required.

Wi) With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

(j) This function shall be automatically bypassed when turbine first. stage pressure is equivalent to THERMAL POWER less than 30% of RATED THERMAL POWER.

(k) Also actuates the EOC-RPT system.

  • Not required for control rods removed per Specification 3.9.10.1 or 3.9.10.2.

HOPE CREEK 3/4 3-5 Amendment No.17 2

TABLE 3.3.4.2-1 END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION MINIMUM OPERABLE CHANNELS TRIP FUNCTION PER TRIP SYSTEM a)

1. Turbine Stop Valve - Closure 2 (b)
2. Turbine Control Valve-Fast Closure 2 (b)

A trip system may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance provided that the other trip system is OPERABLE.

bThis function shall be automatically bypassed when turbine first stage pressure is equivalent to THERMAL I POWER less than 30% of RATED THERMAL POWER.

HOPE CREEK 3/4 3-47/ Amendment No. 1 7 2