PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 OCT 2,6 2 LR-N07-0278 1 OCFR50.55a U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354

SUBJECT:

RELIEF REQUEST HC-RR-12-W03 RETRACTION

REFERENCE:

PSEG Letter LR-N07-0276 RELIEF REQUEST HC-RR-12-W03 PROPOSED ALTERNATIVE REPAIR METHOD Dated 10/24/07 0 PSEG Nuclear LLC The Reference PSEG letter submitted a proposed alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, Rules for Inservice Inspection of Nuclear Power Plant Components.

This proposed alternative would have permitted the use of a full structural weld overlay repair in the event an indication was identified in the N2D recirculation inlet nozzle safe-end to nozzle weld joint.During Hope Creek's Refueling Outage (RFO) 14 Inservice Inspection (ISI)ultrasonic examinations (UT), the dissimilar metal joint at the N2D recirculation safe-end to nozzle received an unscheduled inspection as a result of scope expansion subsequent to a flaw being identified at the dissimilar metal joint at the N2A recirculation safe-end to nozzle. N2A had received an unscheduled inspection in response to OE24381, "Circumferential Flaw in Reactor Recirculation Riser Nozzle to Safe End Weld." The above-discussed N2D UT examination showed no axial or circumferential indications.

Therefore the reference relief request is not required.

This letter formally retracts the relief request.If you have any questions or require additional information, please contact Mr.Philip J. Duca at (856) 339-1640.George P. Barnes Site Vice President

-Hope Creek 4c)(0 95-2168 REV. 7/99 Document Control Desk 2 LR-N07-0278 C: Mr. S. Collins, Administrator

-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission Mr. R. Ennis, Project Manager -Hope Creek Mail Stop 08B1 Washington, DC 20555-0001-USNRC Senior Resident Inspector

-Hope Creek (X24)Mr. P. Mulligan, Manager IV (Acting)Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 086