 Issue dateTitleTopic
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
ML07352028613 December 2007License Amendment Request (LAR) #296, Revision 1, Supplement 2: Measurement Uncertainty Recapture, Submittal of the Non-Proprietary Version of Cameron Engineering Report ER-608, Revision 2, LEFM Checkplus Meter Factor.Measurement Uncertainty Recapture
3F1207-03, Engineering Report ER-608NP, Revision 2, LEFM + Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station.13 December 2007Engineering Report ER-608NP, Revision 2, LEFM + Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station.Power Uprate
Measurement Uncertainty Recapture
3F1207-02, Request for Extension of Completion Date for Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized...10 December 2007Request for Extension of Completion Date for Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized...High Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Foreign Material Exclusion
Large early release frequency
Stress corrosion cracking
Dissimilar Metal Weld
Scaffolding
ML0734106737 December 2007Florida Department of Environmental Protection Nuclear Presentation Slides, Nuclear Power in Florida.
ML0733707593 December 2007Er 05000302-07-301; Progress Energy Florida; 10/22-25/2007 & 10/30/2007; Crystal River Unit 3, NRC Examination ReportJob Performance Measure
ML0733711663 December 2007Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805Probabilistic Risk Assessment
ML07332127429 November 2007October Exam 05000302-07-301 Final RO-SRO Written Exam List of References
ML07332127829 November 2007October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAsSafe Shutdown
Shutdown Margin
Loop seal
High Radiation Area
Grab sample
B.5.b Mitigating Strategies
Earthquake
ML07332126829 November 2007October Exam 05000302-07-301 Licensee Post-Exam Comments
3F1107-02, Relief Request 07-003-RR, Revision 1, Completion of Regulatory Commitment29 November 2007Relief Request #07-003-RR, Revision 1, Completion of Regulatory Commitment
IR 05000302/200730129 November 2007Oct 2007 Exam Summary Sheet Letter, IR 05000302-07-301
3F1107-07, Core Operating Limits Report, Cycle 16, Revision 0 and Revision 128 November 2007Core Operating Limits Report, Cycle 16, Revision 0 and Revision 1Shutdown Margin
3F1107-06, CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report21 November 2007CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report
TAC:MD549815 November 2007
ML07310099015 November 2007Progress Energy Florida, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Crystal River Nuclear Plant, Unit 3 (CR-3)Affidavit
ML07303013215 November 2007Relief Request #07-003-RR Regarding Structural Weld OverlaysWeld Overlay
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
TAC:MD555215 November 2007
ML07310099115 November 2007Relief Requests #07-001-RR and #07-002-RR Regarding Weld RepairsHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Stress corrosion cracking
ML0725700799 November 2007Progress Energy Florida, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Crystal River Nuclear Plant, Unit No. 3Affidavit
ML0725701229 November 2007Progress Energy Florida, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Crystal River Nuclear Plant, Unit No. 3Affidavit
ML0732000869 November 2007Notification of Potential Part 21 Report Conval Valves Weld Qualifications
3F1107-03, Unit 3 - Sea Turtle Mortality Report1 November 2007Unit 3 - Sea Turtle Mortality Report
ML0731103791 November 2007License Amendment Request #296, Revision 1, Measurement Uncertainty Recapture Response to Request for Additional Information, Transmittal Letter, Attachments a, B, C, & K IncludedArc flash
Power Uprate
Measurement Uncertainty Recapture
Affidavit
Overspeed trip
3F1007-12, Inservice Testing Program, Ten-Year Update31 October 2007Inservice Testing Program, Ten-Year UpdateSafe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Anticipated operational occurrence
Incorporated by reference
Operability Determination
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
ML07303007525 October 2007Tech Spec Pages for Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool
3F1007-01, License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process25 October 2007License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement ProcessIncorporated by reference
ML07291031725 October 2007License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07255013724 October 2007Issuance of Amendment Regarding Spent Fuel Pool Missile ShieldsTornado Missile
B.5.b
Tornado-Generated Missile
Tornado Missile Protection
Control of Heavy Loads
3F1007-14, Core Operating Limits Report, Cycle 15, Revision 223 October 2007Core Operating Limits Report, Cycle 15, Revision 2Shutdown Margin
ML07303038623 October 2007Tech Spec Pages for Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System
TAC:MD322723 October 2007
3F1007-13, Response to Request for Additional Information Regarding Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 023 October 2007Response to Request for Additional Information Regarding Relief Requests #07-001-RR, Revision 0, and #07-002-RR, Revision 0
ML07285089423 October 2007License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water SystemUltimate heat sink
Probabilistic Risk Assessment
3F1007-07, Response to Request for Additional Information Regarding Relief Request 07-003-RR, Revision 123 October 2007Response to Request for Additional Information Regarding Relief Request #07-003-RR, Revision 1Weld Overlay
Stress corrosion cracking
ML07296004419 October 2007Operator Licensing Examination Approval - Crystal River 2007-301
3F1007-10, Notification of Violation of Industrial Wastewater Permit No. FL000015918 October 2007Notification of Violation of Industrial Wastewater Permit No. FL0000159Overexposure
IR 05000302/200700418 October 2007IR 05000302-07-004; Progress Energy Florida; 07/01/2007 - 09/30/2007; Crystal River Unit 3, Integrated InspectionBoric Acid
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
3F1007-03, License Amendment Request 296, Revision 2: Measurement Uncertainty Recapture Response to Request for Additional Information18 October 2007License Amendment Request #296, Revision 2: Measurement Uncertainty Recapture Response to Request for Additional InformationOffsite Dose Calculation Manual
Power Uprate
Measurement Uncertainty Recapture
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0727601462 October 2007Region II Management Change in Operator Licensing
ML07270049027 September 2007Notification of Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress (NRC Inspection Report No. 05000302/2008006), Crystal River Unit 3Safe Shutdown
Fitness for Duty
Fire Barrier
Fire impairment
Temporary Modification
Fire Protection Program
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication
ML07257033114 September 2007Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
3F0907-07, License Amendment Request 295, Revision 0: Extension of Allowed Outage Time to Seven Days and Elimination of Second Completion Times Response to Request for Additional Information13 September 2007License Amendment Request #295, Revision 0: Extension of Allowed Outage Time to Seven Days and Elimination of Second Completion Times Response to Request for Additional InformationFire Watch
3F0907-05, Relief Request 07-003-RR, Revision 1, and Response to Request for Additional Information13 September 2007Relief Request #07-003-RR, Revision 1, and Response to Request for Additional InformationWeld Overlay
Hydrostatic
Nondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
Thermal fatigue
ML0724903866 September 2007Radiation Protection Inspection - Crystal River Nuclear Plant
ML0724704966 September 2007Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (Tac No. MD5241)