Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure | 30 April 2003 7 November 2005 3 April 2008 | Protection of Safeguards Information from Unauthorized Disclosure 2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure | Backfit |
ML073520286 | 13 December 2007 | License Amendment Request (LAR) #296, Revision 1, Supplement 2: Measurement Uncertainty Recapture, Submittal of the Non-Proprietary Version of Cameron Engineering Report ER-608, Revision 2, LEFM Checkplus Meter Factor. | Measurement Uncertainty Recapture |
3F1207-03, Engineering Report ER-608NP, Revision 2, LEFM + Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station. | 13 December 2007 | Engineering Report ER-608NP, Revision 2, LEFM + Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station. | Power Uprate Measurement Uncertainty Recapture |
3F1207-02, Request for Extension of Completion Date for Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized... | 10 December 2007 | Request for Extension of Completion Date for Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized... | High Radiation Area Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Foreign Material Exclusion Large early release frequency Stress corrosion cracking Dissimilar Metal Weld Scaffolding |
ML073410673 | 7 December 2007 | Florida Department of Environmental Protection Nuclear Presentation Slides, Nuclear Power in Florida. | |
ML073370759 | 3 December 2007 | Er 05000302-07-301; Progress Energy Florida; 10/22-25/2007 & 10/30/2007; Crystal River Unit 3, NRC Examination Report | Job Performance Measure |
ML073371166 | 3 December 2007 | Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805 | Probabilistic Risk Assessment |
ML073321274 | 29 November 2007 | October Exam 05000302-07-301 Final RO-SRO Written Exam List of References | |
ML073321278 | 29 November 2007 | October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs | Safe Shutdown Shutdown Margin Loop seal High Radiation Area Grab sample B.5.b Mitigating Strategies Earthquake |
ML073321268 | 29 November 2007 | October Exam 05000302-07-301 Licensee Post-Exam Comments | |
3F1107-02, Relief Request 07-003-RR, Revision 1, Completion of Regulatory Commitment | 29 November 2007 | Relief Request #07-003-RR, Revision 1, Completion of Regulatory Commitment | |
IR 05000302/2007301 | 29 November 2007 | Oct 2007 Exam Summary Sheet Letter, IR 05000302-07-301 | |
3F1107-07, Core Operating Limits Report, Cycle 16, Revision 0 and Revision 1 | 28 November 2007 | Core Operating Limits Report, Cycle 16, Revision 0 and Revision 1 | Shutdown Margin |
3F1107-06, CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report | 21 November 2007 | CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report | |
TAC:MD5498 | 15 November 2007 | ||
ML073100990 | 15 November 2007 | Progress Energy Florida, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Crystal River Nuclear Plant, Unit 3 (CR-3) | Affidavit |
ML073030132 | 15 November 2007 | Relief Request #07-003-RR Regarding Structural Weld Overlays | Weld Overlay Nondestructive Examination Incorporated by reference Finite Element Analysis Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
TAC:MD5552 | 15 November 2007 | ||
ML073100991 | 15 November 2007 | Relief Requests #07-001-RR and #07-002-RR Regarding Weld Repairs | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking |
ML072570079 | 9 November 2007 | Progress Energy Florida, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Crystal River Nuclear Plant, Unit No. 3 | Affidavit |
ML072570122 | 9 November 2007 | Progress Energy Florida, Inc. - Request for Withholding of Proprietary Information from Public Disclosure for Crystal River Nuclear Plant, Unit No. 3 | Affidavit |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | |
3F1107-03, Unit 3 - Sea Turtle Mortality Report | 1 November 2007 | Unit 3 - Sea Turtle Mortality Report | |
ML073110379 | 1 November 2007 | License Amendment Request #296, Revision 1, Measurement Uncertainty Recapture Response to Request for Additional Information, Transmittal Letter, Attachments a, B, C, & K Included | Arc flash Power Uprate Measurement Uncertainty Recapture Affidavit Overspeed trip |
3F1007-12, Inservice Testing Program, Ten-Year Update | 31 October 2007 | Inservice Testing Program, Ten-Year Update | Safe Shutdown Boric Acid Shutdown Margin Stroke time Anticipated operational occurrence Incorporated by reference Operability Determination Cold shutdown justification Power-Operated Valves Power Operated Valves |
ML073030075 | 25 October 2007 | Tech Spec Pages for Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool | |
3F1007-01, License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process | 25 October 2007 | License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process | Incorporated by reference |
ML072910317 | 25 October 2007 | License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072550137 | 24 October 2007 | Issuance of Amendment Regarding Spent Fuel Pool Missile Shields | Tornado Missile B.5.b Tornado-Generated Missile Tornado Missile Protection Control of Heavy Loads |
3F1007-14, Core Operating Limits Report, Cycle 15, Revision 2 | 23 October 2007 | Core Operating Limits Report, Cycle 15, Revision 2 | Shutdown Margin |
ML073030386 | 23 October 2007 | Tech Spec Pages for Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System | |
TAC:MD3227 | 23 October 2007 | ||
3F1007-13, Response to Request for Additional Information Regarding Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 0 | 23 October 2007 | Response to Request for Additional Information Regarding Relief Requests #07-001-RR, Revision 0, and #07-002-RR, Revision 0 | |
ML072850894 | 23 October 2007 | License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System | Ultimate heat sink Probabilistic Risk Assessment |
3F1007-07, Response to Request for Additional Information Regarding Relief Request 07-003-RR, Revision 1 | 23 October 2007 | Response to Request for Additional Information Regarding Relief Request #07-003-RR, Revision 1 | Weld Overlay Stress corrosion cracking |
ML072960044 | 19 October 2007 | Operator Licensing Examination Approval - Crystal River 2007-301 | |
3F1007-10, Notification of Violation of Industrial Wastewater Permit No. FL0000159 | 18 October 2007 | Notification of Violation of Industrial Wastewater Permit No. FL0000159 | Overexposure |
IR 05000302/2007004 | 18 October 2007 | IR 05000302-07-004; Progress Energy Florida; 07/01/2007 - 09/30/2007; Crystal River Unit 3, Integrated Inspection | Boric Acid Fire Barrier Probabilistic Risk Assessment Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
3F1007-03, License Amendment Request 296, Revision 2: Measurement Uncertainty Recapture Response to Request for Additional Information | 18 October 2007 | License Amendment Request #296, Revision 2: Measurement Uncertainty Recapture Response to Request for Additional Information | Offsite Dose Calculation Manual Power Uprate Measurement Uncertainty Recapture |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072760146 | 2 October 2007 | Region II Management Change in Operator Licensing | |
ML072700490 | 27 September 2007 | Notification of Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress (NRC Inspection Report No. 05000302/2008006), Crystal River Unit 3 | Safe Shutdown Fitness for Duty Fire Barrier Fire impairment Temporary Modification Fire Protection Program |
ML072750470 | 21 September 2007 | MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 | Commercial Grade Dedication |
ML072570331 | 14 September 2007 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination VT-2 |
3F0907-07, License Amendment Request 295, Revision 0: Extension of Allowed Outage Time to Seven Days and Elimination of Second Completion Times Response to Request for Additional Information | 13 September 2007 | License Amendment Request #295, Revision 0: Extension of Allowed Outage Time to Seven Days and Elimination of Second Completion Times Response to Request for Additional Information | Fire Watch |
3F0907-05, Relief Request 07-003-RR, Revision 1, and Response to Request for Additional Information | 13 September 2007 | Relief Request #07-003-RR, Revision 1, and Response to Request for Additional Information | Weld Overlay Hydrostatic Nondestructive Examination Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld Thermal fatigue |
ML072490386 | 6 September 2007 | Radiation Protection Inspection - Crystal River Nuclear Plant | |
ML072470496 | 6 September 2007 | Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (Tac No. MD5241) |