ML073520286

From kanterella
Jump to navigation Jump to search

License Amendment Request (LAR) #296, Revision 1, Supplement 2: Measurement Uncertainty Recapture, Submittal of the Non-Proprietary Version of Cameron Engineering Report ER-608, Revision 2, LEFM Checkplus Meter Factor.
ML073520286
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/13/2007
From: Young D
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1207-03, ER-608, Rev 2, TAC MD5500
Download: ML073520286 (2)


Text

0Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.90 December 13, 2007 3F1207-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - License Amendment Request (LAR) #296, Revision 1, Supplement 2: Measurement Uncertainty Recapture, Submittal of the Non-Proprietary Version of Cameron Engineering Report ER-608, Revision 2, LEFM CheckPlus Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station (TAC No. MD5500)

Dear Sir:

In accordance with the provisions of 10 CFR 50.90, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., hereby provides a non-proprietary copy of the Cameron Engineering Report, ER-608 Revision 2, "LEFM CheckPlus Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station," on the testing performed for the Crystal River Unit 3 (CR-3) Measurement Uncertainty Recapture instrumentation.

The attachment to this submittal provides the non-proprietary copy of the Cameron report. The proprietary version of this document was submitted as an attachment to FPC to NRC letter, 3F1 107-04, dated November 1, 2007.

This letter establishes no new regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Dennis Herrin, Acting Supervisor, Licensing and Regulatory Programs at (352) 563-4633.

Sincerely, Dale E. Young Vice President Crystal River Nuclear Plant DEY/par

Attachment:

Cameron Engineering Report ER-608,. Revision 2, "LEFM CheckPlus Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

U.S. Nuclear Regulatory Commission 3F1207-03 Page 2 of 2 STATE OF FLORIDA COUNTY OF CITRUS Dale E. Young states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his. knowledge, information, and belief.

Dale E. Young Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this day of 2007, by Dale E. Young.

Signature of Notary Public State of Fl6iAa-- - _

(Print, type, or sti- p*Cc Name of Notary Public)

Personally t.1 Produced Known -OR- Identification