Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07361055817 December 2007Comment (5) of T. Moser on Behalf of Strategic Teaming and Resource Sharing (Stars), Supporting Proposed Rules Pr 50, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.
ML07309015811 December 2007Request to Relax Requirements on Nondestructive Examination of Reactor Pressure Vessel Head Penetration Nozzles in First Revised Order EA-03-009 (Tac No. MD5620)Nondestructive Examination
ML07311144210 December 2007Correction to Authorization of Relief Request ISI-39 for the Second 10-Year Inservice Inspection IntervalVT-2
ML0734007366 December 2007OI 4-2007-028 Amerenue (Callaway Plant), Closure of Investigation, 12/06/2007
ML0733307593 December 2007Project Manager Assignment to Mohan Thadani, Effective January 1, 2008
ML07330047530 November 2007Responses to Generic Letter 2003-01, Control Room Habitability (Tac MB9783)
ML07330041829 November 2007Topical Report Withholding Information from Public Disclosure (Tac No. MD0197)
ULNRC-05459, Application for Amendment to Facility Operating License No. NPF-30, Adoption of Industry Travelers TSTF-247-A and TSTF-352-A29 November 2007Application for Amendment to Facility Operating License No. NPF-30, Adoption of Industry Travelers TSTF-247-A and TSTF-352-AAnticipated operational occurrence
ML07327011720 November 2007Nrc'S Assessment of the Callaway Plant'S Corrective Action Program
ML07324103719 November 200711/2007- Examination Approval Letter
TAC:MD661831 October 2007
ML07278000231 October 2007Audit Report of Licensee Regulatory Commitment Management Program for Audit Performed August 22-22, 2007Boric Acid
Coatings
ULNRC-05445, One-Time Completion Time Extension for Essential Service Water (ESW) System31 October 2007One-Time Completion Time Extension for Essential Service Water (ESW) SystemSafe Shutdown
Time of Discovery
Ultimate heat sink
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
Maintenance Rule Program
Fuel cladding
Offsite Circuit
ML07298039730 October 2007Relief Request ISI-38, Reactor Pressure Vessel Inlet Safe-End to-Elbow Welds Proposed Alternative Examination for Second 10-Year Inservice Inspection IntervalVT-2
Incorporated by reference
Dissimilar Metal Weld
ULNRC-05448, Responses to Requests for Additional Information Regarding Generic Letter 2003-01, Control Room Habitability30 October 2007Responses to Requests for Additional Information Regarding Generic Letter 2003-01, Control Room Habitability
IR 05000483/200700426 October 2007IR 05000483-07-004; on 06/24/2007 - 09/22/2007; Callaway Plant: Identification and Resolution of Problems, Event Follow-upSafe Shutdown
Mission time
Internal Flooding
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Operability Determination
Biofouling
Siren
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ULNRC-05450, Results of First Replacement Steam Generator Tube In-Service Inspection25 October 2007Results of First Replacement Steam Generator Tube In-Service InspectionNondestructive Examination
ML07295052722 October 2007Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance ImprovementsWeld Overlay
Through-Wall Leak
ML07289031718 October 2007(Public Version) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (Tac No. MD6415)Significance Determination Process
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML07303049310 October 2007ERDS Data Point Library RevisionsMet Tower
ULNRC-05394, Responses to Requests for Additional Information Regarding Request for Partial Site Release5 October 2007Responses to Requests for Additional Information Regarding Request for Partial Site Release
ML0727000464 October 2007Request for Withholding Information from Public Disclosure in Areva Np Calculation Summary Sheet Submitted May 18, 2007, for the Callaway Plant (Tac MD5620)
ML07327009727 September 2007ARB Disposition Record, Callaway, Discuss Concerned Individual'S Rebuttal Letter for Allegation Files RIV-2007-A-0028 and RIV-2007-A-0048
ML07327008126 September 2007Email from Richard W. Deese to Anton Vegal .... Michael Vasquez, Subject: Action from Monday'S ARB
ML07327011124 September 2007ARB Disposition Record, RIV-2007-A-0048 for Callaway to Discuss Concerned Individual'S Rebuttal Letter for Allegation Files RIV-2007-A-0028 and RIV-2007-A-0048
ML07264040221 September 2007Notice of Meeting with Union Electric Company to Discuss Various Topics Related to Callaway
IR 05000483/200740221 September 2007IR 05000483-07-402, on 09/13/07; Callaway Plant, Security Inspection - Letter OnlyAffidavit
Press Release-IV-07-035, - NRC Names New Senior Resident Inspector at Callaway Nuclear Plant18 September 2007Press Release-IV-07-035 - NRC Names New Senior Resident Inspector at Callaway Nuclear PlantNew Resident Inspector
ML07240009217 September 2007Issuance of Relief Requests (Rrs) ISI-36, ISI-37, and ISI-38 for Second Year Inservice Inspection (ISI) IntervalVT-2
Incorporated by reference
TAC:L2411714 September 2007
ML07263011414 September 2007/ P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170
ML07253100210 September 2007MR 4-2007-0004, Union Electric Company, Callaway, Excessive Reactor Coolant System Leakage
ML07243075731 August 2007Mid-Cycle Performance Review and Inspection Plan - Callaway Plant
ML07227000230 August 2007Topical Report, Request for Withholding Information from Public Disclosure
ML07255048830 August 200710 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements for Replacement of Class 3 Buried PipingCoatings
TAC:MD725230 August 2007
ML07226000228 August 2007Closure of Confirmatory Action Letter NRR-07-013Weld Overlay
Dissimilar Metal Weld
ULNRC-05379, Proposed Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air (License Amendment Request OL-1271)20 August 2007Proposed Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air (License Amendment Request OL-1271)Fuel cladding
ULNRC-05432, Owners'S Activity Report (Form OAR -1) for Refuel 158 August 2007Owners'S Activity Report (Form OAR -1) for Refuel 15Weld Overlay
IR 05000483/20070032 August 2007IR 05000483-07-003, on 03/25/2007 - 06/23/2007; Callaway Plant: Equipment Alignment, Refueling and Outage Activities, and Identification and Resolution of ProblemsBoric Acid
High Radiation Area
Ultimate heat sink
Weld Overlay
Nondestructive Examination
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Fuel cladding
Biofouling
Liquid penetrant
Through-Wall Leak
Substantial potential for an overexposure
Overexposure
ML07278045731 July 2007Operator Licensing Examination DataGeneric Fundamentals Examination
ML07219058325 July 2007Semi-Annual Fitness for Duty Program Performance Data Report for AmerenueFitness for Duty
ML07211023824 July 2007Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration
ULNRC-05425, Facility Operating License NPF-030 Cycle 15 Commitment Change Summary16 July 2007Facility Operating License NPF-030 Cycle 15 Commitment Change SummaryBoric Acid
Veliger
Liquid penetrant
ULNRC-05427, Response to Request for Additional Information Concerning Generic Letter 2003-01, Control Room Habitability16 July 2007Response to Request for Additional Information Concerning Generic Letter 2003-01, Control Room Habitability
ML07152032910 July 2007Request for Alternatives for Application of Structural Weld Overlays to Pressurizer Dissimilar Metal Nozzle Welds for Third 10-Year Inservice Inspection Program IntervalWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ULNRC-05424, Results of Inspections Performed for Pressurizer Full Structural Weld Overlays Installed at Callaway Plant9 July 2007Results of Inspections Performed for Pressurizer Full Structural Weld Overlays Installed at Callaway PlantWeld Overlay
Dissimilar Metal Weld
ULNRC-05426, Day Report for First Revised NRC Order EA-03-009 (Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)9 July 2007Day Report for First Revised NRC Order EA-03-009 (Regarding Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)Boric Acid
Non-Destructive Examination