Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML070090174 | 28 December 2006 | NRC Region 1 Annual GFE Notification Letter to Multiple Addressees Dtd 12/28/06 | Generic Fundamentals Examination |
ML063630078 | 27 December 2006 | Comment (12) Submitted by Ronald K. Scheeler on Proposed Rules PR-50, 72 and 73 Regarding Power Reactor Security Requirements | |
ML063350042 | 20 December 2006 | Quad and Timi - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
ML063450267 | 20 December 2006 | Letter to John W. Droneburg, Director, Maryland Emergency Management Agency | |
RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | 15 December 2006 | Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | |
ML063540160 | 13 December 2006 | Intervenor-Respondent's Application for Costs - No. CLI-05-29, Environmental Law and Policy Center - 12/13/2006 | |
RS-06-179, Cover Letter for Additional Information - Application to Use Weighting Factors for External Exposure | 13 December 2006 | Cover Letter for Additional Information - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
ML073340876 | 11 December 2006 | Report of Investigation - Violation of Fitness-for-Duty Procedures | Fitness for Duty |
ML063460131 | 7 December 2006 | Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier | Deep Dose Equivalent Fuel cladding |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
TAC:MD0951 | 5 December 2006 | ||
ML063330535 | 1 December 2006 | TMI - Closeout of NRC Bulletin 2005-02 | |
ML063280050 | 1 December 2006 | Y020060251 - Limerick, Units 1 and 2, Peach Bottom, Units 1 and 2, and Salem, Units 1 and 2 - Review of Notice of Disbursement from Decommissioning Trusts | |
TAC:MC7793 | 1 December 2006 | ||
ML070380334 | 22 November 2006 | Draft - Section B Operating Exam (Folder 2) | Job Performance Measure Scram Discharge Volume |
ML070380337 | 22 November 2006 | Draft - Section C Operating Exam (Folder 2) | Half scram Scram Discharge Volume |
ML070380304 | 22 November 2006 | Draft - Section a Operating Exam (Folder 2) | Job Performance Measure |
ML070380292 | 22 November 2006 | Draft - RO & SRO Written Exam (Folder 2) | Reactor Vessel Water Level Half scram Stroke time Locked High Radiation Area Feedwater Controller Failure |
ML070380284 | 22 November 2006 | Draft - Outlines (Folder 2) | Half scram Scram Discharge Volume |
ML063410293 | 17 November 2006 | License Amendment Request Revise Local Power Range Monitor Calibration Frequency | High Radiation Area Scram Discharge Volume |
ML063380360 | 17 November 2006 | License Amendment Request to Revise Local Power Monitor Calibration Frequency | High Radiation Area Scram Discharge Volume |
ML063210338 | 15 November 2006 | Quality Assurance Program Changes Regarding the Reassignment of Independent Review | |
ML063190148 | 14 November 2006 | Note to File 11/06/2006 Conference Call with Transnuclear, Inc | |
ML063240437 | 13 November 2006 | Byron Station, Dresden, LaSalle County Station, Peach Bottom Atomic Station, Limerick Station and Quad Cities Nuclear Power Station, 2006 Annual Report - Guarantees of Payment of Deferred Premiums | |
IR 05000027/1977006 | 3 November 2006 | IR 050002777-06-004, 05000278-06-004; Exelon Generation Company, LLC; 07/01/2006 - 09/30/2006; Peach Bottom Atomic Power Station | High winds High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Scram Discharge Volume Hourly Fire Watch Scaffolding Unidentified leakage |
TAC:MD3566 | 3 November 2006 | ||
ML063180495 | 3 November 2006 | Y020060251 - Notice of Disbursement from Decommissioning Trusts for: Limerick Generating Station Units 1 and 2, Peach Bottom Atomic Power Stattion Units 1, 2, and 3, Salem Generating Units 1 and 2 | |
ML062990159 | 2 November 2006 | Oyster, Peach Bottom, Quad Cities, TMI - RAI Emergency Action Levels | Ultimate heat sink |
TAC:MD8621 | 31 October 2006 | ||
ML062920392 | 19 October 2006 | Senior Reactor and Reactor Operator Initial Examinations - (Peach Bottom Atomic Power Station) | |
ML063280192 | 13 October 2006 | Letter Dated 10/13/06 to Multiple Addressees Who Did Not Participate in the 09/06/06 Generic Fundamentals Exam (GFE) | Generic Fundamentals Examination |
PNO-I-06-011, Peach Bottom, Unit 2, Loss of Containment Integrity Due to Leak in a Test Return Line | 10 October 2006 | PNO-I-06-011: Peach Bottom, Unit 2, Loss of Containment Integrity Due to Leak in a Test Return Line | |
RS-06-152, Withdrawal of Request for Issuance of Conforming License Amendments | 3 October 2006 | Withdrawal of Request for Issuance of Conforming License Amendments | |
ML070120468 | 2 October 2006 | NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2) | |
ML062750165 | 29 September 2006 | Christopher M. Crane Ltr. Re Response to RIS 2006-06, New Reactor Standardization Needed to Support Design-Centered Licensing Review Approach | |
ML062770224 | 27 September 2006 | Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves | |
ML062700092 | 26 September 2006 | Issuance of the Core Operating Limits Report for Reload 16, Cycle 17, Revision 4 | Minimum Critical Power Ratio MELLLA |
ML062570374 | 21 September 2006 | State-of-the-art Reactor Consequence Analysis | Severe Accident Management Guideline |
RS-06-134, Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator License Examinations. | 20 September 2006 | Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator License Examinations. | Generic Fundamentals Examination |
IR 05000171/2006013 | 15 September 2006 | IR 05000171-06-013, on July 5-6, 2006, Peach Bottom Atomic Power Station, Exelon Generation Company, LLC Delta, Pennsylvania | |
ML062630257 | 15 September 2006 | License Amendment Request to Revise Control Rod Scram Time Testing Frequency & Consolidated Line Item Improvement Process (TSTF-460) | Incorporated by reference |
ML062620494 | 15 September 2006 | Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed | |
RS-06-130, Amergen and Exelon Nuclear - Response to Request for Additional Information - Application to Use Weighting Factors for External Exposure | 6 September 2006 | Amergen and Exelon Nuclear - Response to Request for Additional Information - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
IR 05000277/2006014 | 1 September 2006 | IR 05000277-06-014 and 05000278-06-014; Peach Bottom Atomic Power Station (Pbaps); Ti 2515/168. Cover Letter | Affidavit |
ML062430523 | 31 August 2006 | Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station | |
TAC:L52684 | 28 August 2006 | ||
ML062000075 | 28 August 2006 | Unit 1; Dresden,Units 2 and 3;LaSalle, Units 1 and 2;Limerick, Units 1 and 2; Oyster Creek, Peach Botton, Units 2 and 3; Quad Cities, Units 1 and 2; TMI, Unit 1; and Zion, Units 1 and 2 - Use of Protected Telecommunications | |
ML062300304 | 28 August 2006 | Order Requiring Compliance with Key Radiological Protection Mitigation Strategies | |
ML062360072 | 22 August 2006 | Submittal of 30-day Report in Accordance with 10 CFR 50.46(a)(3)(ii) for a Calculated Peak Cladding Temperature (PCT) Change More That 50 Degrees for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 |