Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML071220298 | 31 December 2006 | Annual Radioactive Effluent Release Report, Cover Through Appendix D | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML063620015 | 27 December 2006 | Notice of Regulatory Conference with Arizona Public Service Company Palo Verde Nuclear Generating Station to Discuss the Significance, Cause, and Corrective Actions Associated with Two Apparent Violations | |
ML063560288 | 22 December 2006 | Review of Arizona Public Service Company Letter Dated November 16, 2006, Involving the Remaining Corrective Actions for the Containment Sump Voiding Yellow Finding | |
ML070040090 | 22 December 2006 | Annual 10 CFR 50.59, 10 CFR 72.48 and Commitment Change Report (January - December 2005) | Temporary Modification |
ML063540027 | 22 December 2006 | Closeout of Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations | Safe Shutdown Fire Barrier Hemyc |
IR 05000528/2006013 | 22 December 2006 | Ultimate heat sink Mission time Condition Adverse to Quality Significance Determination Process | |
ML063600175 | 22 December 2006 | Final Significance Determination | Ultimate heat sink Mission time Condition Adverse to Quality Significance Determination Process |
ML063460258 | 21 December 2006 | Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure) | |
IR 05000528/2006006 | 20 December 2006 | Significance Determination Process Affidavit | |
ML063490188 | 19 December 2006 | Closeout of Bulletin 2005-02, Emergency Preparedness and Response Actions for Security-Based Events | |
TAC:MC7853 | 19 December 2006 | ||
ML063470599 | 14 December 2006 | Plant Service List | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
ML063400177 | 13 December 2006 | Approval of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Extension Request | |
ML063560024 | 12 December 2006 | Comment (16) of D. Hooper on Behalf of Strategic Teaming and Resource Sharing on Implementing of Reactor Oversight Process, Stars Have Been Working with NEI and RUG IV in Development of Industry Comments | Significance Determination Process |
ML063230011 | 12 December 2006 | Meeting Summary and List of Attendees - NRC with Palo Verde Nuclear Generating Station Licensee Nuclear Fuel Management Activities | |
ML063530681 | 8 December 2006 | Transmittal of Special Report 1-SR-2006-003 of Boron Deposit at Control Element Drive Mechanism Vent | Boric Acid |
ML063530482 | 8 December 2006 | Supplement to Response to NRC Generic Letter 2003-01, Control Room Habitability. | |
ML070300817 | 8 December 2006 | Letter 12-8-06 Palo Verde Nuclear Generating Station Problem Identification and Resolution Cross-cutting Closure Plan | |
ML070300805 | 8 December 2006 | Letter 12-8-06 Palo Verde Nuclear Generating Station Units 1,2, and 3 Human Performance Cross-cutting Issue Closure Plan | High Radiation Area Foreign Material Exclusion |
ML063410618 | 7 December 2006 | 05000528-07-301; 05000529-07-301; 05000530-07-301 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification of NRC Initial Operator Licensing Examination | |
ML063400561 | 6 December 2006 | IR 05000528-06-012; 05000529-06-012; 05000530-06-012; 10/02/2006 - 11/09/2006; Palo Verde Nuclear Generating Station, Units 1, 2, and 3: Special Inspection in Response to Unit 3 Train a EDG Failures on July 25 and September 22, 2006 | Internal Flooding Condition Adverse to Quality Significance Determination Process Large early release frequency Earthquake |
TAC:MD1011 | 5 December 2006 | ||
ML063390530 | 5 December 2006 | Tech Spec Pages for Amendments 164, 164, and 164 Extended Allowed Outage Time for Emergency Diesel Generators | Safe Shutdown Safeguards Contingency Plan Offsite Circuit Fire Protection Program |
ML063350074 | 5 December 2006 | Issuance of License Amendments 164, 164, and 164 Extended Allowed Outage Time for Emergency Diesel Generators | Internal Flooding Probabilistic Risk Assessment Large early release frequency Earthquake Maintenance Rule Program Offsite Circuit |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
ML063480336 | 5 December 2006 | Technical Specifications Bases Revisions 38, 39, and 40 Update | Boric Acid Pressure Boundary Leakage |
ML063390464 | 29 November 2006 | Meeting Summary for Regulatory and Predecisional Enforcement Conference | |
ML063420493 | 28 November 2006 | Clarifications and Additional Information Requested at the November 20, 2006 NRC Regulatory Conference | Ultimate heat sink Mission time |
ML063450115 | 28 November 2006 | Clarifications and Additional Information Requested at the November 20, 2006 NRC Regulatory Conference | Ultimate heat sink Mission time |
ML063240049 | 17 November 2006 | Technical Specifications - Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements | Safe Shutdown Safeguards Contingency Plan Fire Protection Program |
ML063110505 | 17 November 2006 | Issuance of Amendments 163, 163, and 163, Revise TS 3.7.2, Main Steam Isolation Valves (Msivs), to Include Specific Requirements for the MSIV Actuator Trains | Probabilistic Risk Assessment |
Press Release-IV-06-025, NRC to Hold Regulatory Conference with Arizona Public Service Co. on Palo Verde Nuclear Generating Station | 16 November 2006 | Press Release-IV-06-025: NRC to Hold Regulatory Conference with Arizona Public Service Co. on Palo Verde Nuclear Generating Station | |
ML063240057 | 16 November 2006 | OI 4-2006-026, Arizona Public Service Company (Palo Verde Nuclear Generating Station), Closure of Investigation Ltr., 11/16/2006 | |
ML063210266 | 16 November 2006 | Meeting Slides with the Palo Verde Nuclear Generating Station Licensee Nuclear Fuel Management Activities | Shutdown Margin |
ML063320163 | 16 November 2006 | Response to NRC Followup Supplemental Inspection Report (05000528/2006010; 05000529/2006010; 05000530/2006010) | |
ML063320538 | 16 November 2006 | Response to NRC Followup Supplemental Inspection Report; 05000528/2006010, 05000529/2006010; 05000530/2006010 | |
ML063250343 | 14 November 2006 | APS Response to NRC Inspection Report 05000528-06-011, 05000529-06-011, & 05000530-06-011 | Ultimate heat sink Temporary Modification Condition Adverse to Quality |
ML063130153 | 14 November 2006 | Errata to Amendment No. 162, Dated October 31, 2006 Changes to Security Plan | |
ML063190545 | 14 November 2006 | Tech Spec Pages for Errata to Amendment No. 162, Dated October 31, 2006 Changes to Security Plan | Safe Shutdown Fire Protection Program |
IR 05000528/2006004 | 13 November 2006 | IR 05000528-06-004, 05000529-06-004, 05000530-06-004; 07/01/06 - 09/30/06; PVNGS, Units 1, 2, & 3; Integrated Res. & Reg. Rpt; Inservice Insp. Activities, Op. Perf. During Nonroutine Evolutions & Events, Surv. Testing & Ident. & Resolution | Boric Acid Enforcement Discretion Coatings Temporary Modification Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Downpower Siren Power Uprate Overexposure |
ML063130267 | 7 November 2006 | 11/7/2006 E-Mail from G. Michael, Arizona Public Service Company, to M. Fields, NRC, Re Information Needed for GSI-191 Extension Request | |
TAC:MD3335 | 7 November 2006 | ||
ML063190443 | 7 November 2006 | Submittal of 2005 Annual Financial Reports | High winds |
ML062930208 | 3 November 2006 | Relief Request No. 32, Risk-Informed Inservice Inspection Program | Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Large early release frequency Dissimilar Metal Weld |
ML063190323 | 3 November 2006 | Supplement to Application for Technical Specification Change Regarding Main Steam Isolation Valves | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake |
ML063070018 | 2 November 2006 | Notice of Regulatory Conference with Arizona Public Service Company (APS) | |
ML062840100 | 31 October 2006 | Issuance of Amendment 162 Changes to Security Plan | |
TAC:MC9158 | 31 October 2006 | ||
ML062840111 | 31 October 2006 | Technical Specification - License Pages - Issuance of Amendment 162 Changes to Security Plan | Safeguards Contingency Plan |