Issue date | Title | Topic | |
---|---|---|---|
ML071410237 | 31 December 2006 | Transmittal of 2006 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
ML063610280 | 27 December 2006 | Notification of Catawba Nuclear Station - Component Design Bases Inspection - NRC Inspection Report 05000413-07-006 and 05000414-07-006 | |
ML063460258 | 21 December 2006 | Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure) | |
ML070040104 | 20 December 2006 | Technical Specification Bases Changes | |
ML063610092 | 19 December 2006 | Request for Relief Number 06-GO-001 Alloy 600 Pressurizer Weld Overlays - Submittal of Committed Information | Weld Overlay Nondestructive Examination Stress corrosion cracking Dissimilar Metal Weld |
ML063050367 | 15 December 2006 | Receipt of Response to Generic Letter 2003-01, Control Room Habitability | |
TAC:MB9786 | 15 December 2006 | ||
ML063470599 | 14 December 2006 | Plant Service List | |
ML063610218 | 14 December 2006 | Relief Request 06-GO-001 Response to Request for Additional Information Regarding Stress Analysis | Weld Overlay Finite Element Analysis License Renewal Dissimilar Metal Weld Thermal fatigue |
ML063610217 | 14 December 2006 | Request for Relief Number 06-GO-001, Alloy 600 Pressurizer Weld Overlays - Submittal of Committed Information | Weld Overlay Dissimilar Metal Weld |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
TAC:MC3468 | 11 December 2006 | ||
ML063040044 | 11 December 2006 | Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, Response | Boric Acid Nondestructive Examination Through-Wall Leakage |
ML063530360 | 7 December 2006 | Letter Regarding Completion of Commitments Concerning Technical Specification Surveillance Requirement 3.6.13.6: Ice Condenser Lower Inlet Doors | |
ML063530342 | 7 December 2006 | Proposed Technical Specifications (TS) Amendments TS 3.7.10 (Catawba)/Ts 3.7.9 (McGuire) - Control Room Area Ventilation System (Cravs) TS 3.7.11 (Catawba)/Ts 3.7.10 (McGuire) - Control Room Area Chilled Water System (Cracws) | Enforcement Discretion Probabilistic Risk Assessment Large early release frequency Fuel cladding Recently irradiated fuel |
ML070120282 | 7 December 2006 | Core Operating Limits Report, Cycle 17, Revision 29 | Boric Acid Shutdown Margin |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
TAC:MD0963 | 5 December 2006 | ||
ML063470049 | 4 December 2006 | Request for Relief Number 06-CN-004 NRC First Revised Order EA-03-009, Relaxation Request for Inspection of Reactor Pressure Vessel Heads | Nondestructive Examination Stress corrosion cracking Liquid penetrant Pressure Boundary Leakage |
ML063450128 | 4 December 2006 | Comment (17) of Bryan J. Dolan on Behalf of Duke Power Co Re Draft Regulatory Guide, DG-1164, Meteorological Monitoring Programs for Nuclear Power Plants. | |
Press Release-II-06-044, NRC Begins Special Inspection at Catawba Nuclear Plant | 28 November 2006 | Press Release-II-06-044: NRC Begins Special Inspection at Catawba Nuclear Plant | |
ML063310486 | 27 November 2006 | Special Inspection to Review Corrective Actions for Degraded Seals on Below-Grade Electrical Penetrations | |
ML063420125 | 22 November 2006 | Proposed Amendment to Facility Operating License FOL Condition Regarding Extension of Time Limit to Complete Emergency Core Cooling Systems Sump Modification | Safeguards Contingency Plan Fuel cladding |
ML063280188 | 16 November 2006 | Revision to Relief Request 06-GO-001 | Weld Overlay |
ML063210217 | 15 November 2006 | Comment (2) Submitted by Duke Energy, Bryan J. Dolan, on Supplemental Proposed Rules PR-2, 50, 51, and 52, Regarding Licenses, Certifications, and Approvals for Nuclear Power Plants | |
ML063190227 | 9 November 2006 | Change in Legal Counsel | |
ML063190302 | 6 November 2006 | Technical Specification Bases Changes | Anticipated operational occurrence Manual Operator Action |
ML063110609 | 1 November 2006 | NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Request for Relief from December 31, 2007 Implementation | Probabilistic Risk Assessment Coatings Operator Manual Action |
IR 05000413/2006004 | 26 October 2006 | IR 05000413-06-004 and 05000414-06-004, on 07/01/2006 - 09/30/2006, Catawba, Units 1 and 2; Event Followup, Mitigating Systems | Safe Shutdown Non-Destructive Examination Fire Barrier Internal Flooding Probabilistic Risk Assessment Temporary Modification Significance Determination Process Job Performance Measure Earthquake |
ML063050535 | 26 October 2006 | Report of Unsatisfactory Laboratory Performance Fitness-For-Duty Program | Fitness for Duty |
TAC:MD2713 | 26 October 2006 | ||
ML063070127 | 18 October 2006 | NRC Service List; Request That List Be Revised to Reflect Recent Change in Key Management Position | |
ML062840106 | 18 October 2006 | Staff'S Review of CLIIP Amendment to Adopt TSTF-372 | Safe Shutdown Earthquake Probabilistic Risk Assessment Large early release frequency Earthquake |
ML062540456 | 30 September 2006 | License Amendments 234, 230, 235 and 217, Revising Reactor Coolant Systems Leakage Detection Instrumentation | Grab sample Probabilistic Risk Assessment Pressure Boundary Leakage Power change Unidentified leakage Operational leakage |
ML062900353 | 30 September 2006 | Tech Spec Pages for Amendments 234 and 230, Revising Reactor Coolant Systems Leakage Detection Instrumentation | Safe Shutdown Grab sample Pressure Boundary Leakage Fire Protection Program Unidentified leakage Operational leakage |
ML062770192 | 29 September 2006 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination VT-2 |
ML062720148 | 29 September 2006 | Priority Attention Required Morning Report - Region II, Update-Management Changes | |
ML062710314 | 29 September 2006 | Review of Cycle 15 Steam Generator Tube Inservice Inspection Summary Reports | |
ML062540237 | 27 September 2006 | License Amendments 233 and 229 Revised Storage Criteria for Low-enriched Uranium Fuel | Safe Shutdown Boric Acid |
ML062780241 | 27 September 2006 | Units 1 & 2 - Revisions to Relief Request 06-GO-001 in Response to September 20, 2006 Conference Call | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML062710596 | 27 September 2006 | Tech Spec Pages for Amendments 233 and 229 Revised Storage Criteria for Low-enriched Uranium Fuel | Safe Shutdown Control of Heavy Loads Fire Protection Program |
ML062510270 | 25 September 2006 | License Amendments 231 and 227 Regarding Updated Final Safety Analysis Report and Emergency Operating Procedures | GOTHIC Manual Operator Action |
ML062690114 | 25 September 2006 | Technical Specifications Revision of Temperature Limits for the Standby Nuclear Service Water Pond | Safe Shutdown Anticipated operational occurrence Fire Protection Program |
ML062390020 | 25 September 2006 | Request for Relief 05-CN-004, Limited Weld Examinations During End-of-Cycle 15 Refueling Outage, MC8337, MC9171, MC9172, MC9173, MC9174, MC9175, MC9176, MC9177, MC9178, and MC9179) | Boric Acid Incorporated by reference Liquid penetrant Through-Wall Leak Dissimilar Metal Weld DM weld Unidentified leakage |
ML062420491 | 25 September 2006 | Amendments 232/228 Temperature Limit for the Standby Nuclear Service Water Pond | Ultimate heat sink |
ML062690112 | 25 September 2006 | Tech Spec Pages for Amendments 231 and 227 Regarding Updated Final Safety Analysis Report and Emergency Operating Procedures | Safe Shutdown Fire Protection Program |
TAC:MC7783 | 25 September 2006 | ||
IR 05000413/2006007 | 22 September 2006 | IR 05000413-06-007 & IR 05000414-06-007, on 08/07/10/2006 & 08/21-25/2006, Catawba, Units 1 and 2 | Boric Acid Scaffolding |
ML062710352 | 20 September 2006 | Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML062620279 | 18 September 2006 | Morning Report 2-2006-0004 Management Changes |