Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000483/2006012 | 26 December 2006 | IR 05000483/2006012, on 10/16/2006 - 11/30/2006, Callaway, Biennial Inspection of the Identification and Resolution of Problems | Unanalyzed Condition Stroke time Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination Operability Assessment |
IR 05000483/2006008 | 26 December 2006 | IR 05000483-06-008; November 13 - 30, 2006; Callaway Plant: Triennial Fire Protection Inspection | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Fire impairment Emergency Lighting Condition Adverse to Quality Significance Determination Process Thermoset Fire Protection Program |
ML063460258 | 21 December 2006 | Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure) | |
ML063620444 | 20 December 2006 | Comment (3) of George G. Yates on Model Safety Evaluation and Model License Amendment Request on Technical Specification Improvement Regarding Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical S | |
ML063460043 | 19 December 2006 | Licensee Response to Bulletin 2005-02, Emergency Preparedness and Response Actions for Security-Based Events | |
TAC:MC7802 | 19 December 2006 | ||
ULNRC-05353, Clarifying Information Regarding Application for License Amendment to Revise Technical Specification 3.6.7, Recirculation Fluid Ph Control System. | 19 December 2006 | Clarifying Information Regarding Application for License Amendment to Revise Technical Specification 3.6.7, Recirculation Fluid Ph Control System. | |
ML063310195 | 18 December 2006 | Issuance of Amendment 178 Revision to Loc 3.4.16 Limit on Reactor Coolant System Specific Activity | |
TAC:MD3333 | 18 December 2006 | ||
ML063490274 | 18 December 2006 | Technical Specifications, Amendment 178 Revision to Loc 3.4.16 Limit on Reactor Coolant System Specific Activity | Shutdown Margin Pressure Boundary Leakage Power change |
ML063350114 | 18 December 2006 | Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection Suit | Mururoa |
ULNRC-05355, Plans for Pursuing Feasibility and Environmental Impact Studies for New Nuclear Generation at the Callaway Site | 15 December 2006 | Plans for Pursuing Feasibility and Environmental Impact Studies for New Nuclear Generation at the Callaway Site | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
ULNRC-05351, Response to Request for Additional Information Regarding 10 CFR 50.55a Request ISI-33 (Request for Relief from ASME Section XI Inservice Inspection Qualification Requirements) | 12 December 2006 | Response to Request for Additional Information Regarding 10 CFR 50.55a Request ISI-33 (Request for Relief from ASME Section XI Inservice Inspection Qualification Requirements) | Nondestructive Examination Dissimilar Metal Weld |
ML063560024 | 12 December 2006 | Comment (16) of D. Hooper on Behalf of Strategic Teaming and Resource Sharing on Implementing of Reactor Oversight Process, Stars Have Been Working with NEI and RUG IV in Development of Industry Comments | Significance Determination Process |
ML063060478 | 7 December 2006 | Relief Request 13R-04 for the Third 10-Year Interval Inservice Inspection | Incorporated by reference |
IR 05000483/2006007 | 6 December 2006 | NRC Security Inspection Report 05000483-06-007 | Significance Determination Process Affidavit |
ML063390558 | 5 December 2006 | Tech Spec Pages for Amendment 177 Technical Specification (TS) 5.6.6 on the Pressure and Temperature Limits Report | Shutdown Margin Post Accident Monitoring Pressure and Temperature Limits Report |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
TAC:MD0960 | 5 December 2006 | ||
ML063240407 | 5 December 2006 | Issuance of Amendment 177 Technical Specification (TS) 5.6.6 on the Pressure and Temperature Limits Report | Incorporated by reference Pressure and Temperature Limits Report |
ULNRC-05344, Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-01 (Request for Relief from ASME Section XI Inservice Inspection Requirements for Third 10-Year Inspection Interval) | 29 November 2006 | Response to Request for Additional Information Regarding 10 CFR 50.55a Request I3R-01 (Request for Relief from ASME Section XI Inservice Inspection Requirements for Third 10-Year Inspection Interval) | Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Large early release frequency |
IR 05000004/1983006 | 28 November 2006 | NRC Inspection Report 05000483-06-0401 | |
ULNRC-05347, Response to Request for Additional Information Revision to Technical Specification 3.5.2, ECCS - Operating. | 22 November 2006 | Response to Request for Additional Information Revision to Technical Specification 3.5.2, ECCS - Operating. | |
ULNRC-05346, Additional Information Regarding Application for License Amendment to Revise Technical Specification 5.6.6; Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | 20 November 2006 | Additional Information Regarding Application for License Amendment to Revise Technical Specification 5.6.6; Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | Pressure and Temperature Limits Report |
TAC:MA5631 | 20 November 2006 | ||
TAC:MD1154 | 17 November 2006 | ||
ULNRC-05345, Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms). | 17 November 2006 | Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms). | Boric Acid Post Accident Monitoring |
ML063280185 | 17 November 2006 | Callaway - Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238) | Boric Acid Shutdown Margin Post Accident Monitoring |
IR 05000483/2006013 | 17 November 2006 | IR 05000483-06-013; 10/10/06 - 10/13/06; Callaway Plant, Inspection Procedure 95001 Supplemental Inspection | Condition Adverse to Quality Scaffolding |
ML062930282 | 17 November 2006 | Relief Requests I3R-05 and I3R-06 for the Third Inservice Inspection Interval | Incorporated by reference |
ML062760093 | 15 November 2006 | Issuance of License Amendment 176 Removal of Valve Closure Times from the Technical Specifications to the Technical Specification Bases | |
ML063200252 | 15 November 2006 | Tech Spec Pages for Amendment 176 Removal of Valve Closure Times from the Technical Specifications to the Technical Specification Bases | Ultimate heat sink |
ML062980278 | 8 November 2006 | Revision of Emergency Action Levels in Radiological Emergency Response Plan - Letter and Safety Evaluation | Safe Shutdown |
ML063170323 | 7 November 2006 | Effect of a Non-Functional Actuator Train on MSIV Operability, Callaway Plant Unit 1 | |
ML063050573 | 7 November 2006 | Request for Additional Information Regarding Responses to Generic Letter 2003-01, Control Room Habitability | |
ULNRC-05150, Attachment 3: Markup of Technical Specification Pages | 7 November 2006 | Attachment 3: Markup of Technical Specification Pages | |
ML063170335 | 7 November 2006 | Draft Input - Effect of Inoperable Actuator Trains on MSIV Operability, Callaway Plant, Unit 1 | |
ML063170332 | 7 November 2006 | Inspector-Identified and Self-Revealing Findings | |
ML073200744 | 2 November 2006 | Exhibit 16 - Transcript Interview, Pages 1-24 | |
ML073200695 | 2 November 2006 | Exhibit 15 - Transcript Interview, Pages 1-24 | Inattentive |
ML073200656 | 1 November 2006 | Exhibit 14 - Transcript Interview, Pages 1-64 | |
ML073200564 | 1 November 2006 | Exhibit 13 - Transcript Interview, Pages 1-64 | |
IR 05000483/2006004 | 31 October 2006 | IR 05000483-06-004, on 06/24/2006 - 09/23/2006; Callaway Plant: Event Followup and Other Activities | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Probabilistic Risk Assessment Significance Determination Process Operability Determination Maintenance Rule Program Pressure Boundary Leakage |
ULNRC-05328, Operating Quality Assurance Manual (Oqam), Revision 25 | 30 October 2006 | Operating Quality Assurance Manual (Oqam), Revision 25 | Safe Shutdown Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program Grace period |
ML063120132 | 30 October 2006 | Operating Quality Assurance Manual (Oqam), Revision 25 | Safe Shutdown Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program Grace period |
ML063050203 | 25 October 2006 | Callaway, Requests for Relief from ASME Section Xi Code Inservice Examination Requirements | VT-2 DM weld |
ULNRC-05183, Requests for Relief from ASME Section XI Code Inservice Examination Requirements | 25 October 2006 | Requests for Relief from ASME Section XI Code Inservice Examination Requirements | VT-2 DM weld |
TAC:MD3347 | 25 October 2006 |