MONTHYEARML24275A0452024-09-24024 September 2024 Procedure Review Form - EOF Notification Package ML24275A0482024-09-24024 September 2024 Procedure Review Form - Callaway, Control Room Notification Flowchart ML24256A0762024-07-25025 July 2024 Review Form - Radiological Emergency Response Plan (RERP) ML24256A0792024-07-0101 July 2024 Review Form - Activation and Operation of the Joint Information Center ML24256A0712024-07-0101 July 2024 Review Form - Emergency Implementing Actions ML24086A3722024-02-13013 February 2024 EIP-ZZ-C0010 Addendum C R013 PRF: Plant Assessment Coordinator (Pac) Checklist ML23341A1902023-12-0707 December 2023 Enclosujustification for Exemption Request from Specific Requirements in 2023 Security Rule ML23354A1132023-10-26026 October 2023 Off-Site Liaison Coordinator Checklist ML23354A1112023-10-26026 October 2023 Logistics Support Coordinator Checklist ML23354A1092023-10-26026 October 2023 Protective Measures Coordinator Checklist ML24002A8132023-07-25025 July 2023 EIP-ZZ-00240 Add E, Rev. 28, Health Physics Coordinator (Hpc) Checklist ML23150A1872023-05-18018 May 2023 Submittal of EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist ML23164A0262023-05-18018 May 2023 Procedure Review Form - Emergency Coordinator (EC) Checklist ML23150A1902023-05-18018 May 2023 Submittal of EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML22153A1922022-06-0202 June 2022 Enclosure 3 - List of Commitments ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21335A4622021-12-0101 December 2021 Enclosure 10: ARCON96-NAI Output Summary Logs ML21335A4632021-12-0101 December 2021 Enclosure 11: ARCON96-NAI Output Cumulative Frequency Distribution Results ML21335A4542021-12-0101 December 2021 Enclosure 2: Full Scope Implementation of Alternative Source Term - Evaluation of Proposed Changes ML21335A4612021-12-0101 December 2021 Enclosure 9: ARCON96-NAI Input Run Specifications ML21335A4642021-12-0101 December 2021 Enclosure 12: PAVAN-NAI Input Meteorological Data and Run Specifications for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary ULNRC-06696, Enclosure 13: PAVAN-NAI Output for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary2021-12-0101 December 2021 Enclosure 13: PAVAN-NAI Output for Reactor Building and Refueling Water Storage Tank Releases Evaluated at Exclusion Area Boundary and Low Population Zone Boundary ML21335A4662021-12-0101 December 2021 Enclosure 14: Summary of Differences Between ARCON96 and ARCON96-NAI and Between Pavan and PAVAN-NAI Codes ML21090A1892021-03-31031 March 2021 Enclosure 4 - Acronyms and Definitions ULNRC-06604, Enclosure - Callaway Energy Center Form OAR-1 Owner'S Activity Report2020-10-22022 October 2020 Enclosure - Callaway Energy Center Form OAR-1 Owner'S Activity Report ML20080H2382020-03-17017 March 2020 Enclosure - Nuclear Property Insurance NRC Property Rule 10 CFR 50.54(W) Reporting Requirements ML19325D6712019-11-21021 November 2019 Attachment 1 - Callaway Regulatory Commitment Update ML19225D3232019-08-12012 August 2019 Attachment 1 - List of Regulatory Commitments ML19024A4712019-01-23023 January 2019 Attachment 1 - NRC Audit Questions and Responses ML19024A4752019-01-23023 January 2019 Attachment 5 - List of Regulatory Commitments ML17097A5672017-04-0101 April 2017 joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund ULNRC-06349, joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund2017-04-0101 April 2017 joy-nv Callaway, Unit 1 - Enclosure 5 to ULNRC-06349 - Application for Approval of Decommissioning Cost Estimate for Callaway Energy Center and Funding Level of Nuclear Decommissioning Trust Fund ML17362A0642017-02-10010 February 2017 Enclosure 7: Ameren Corporation by - Laws Effective 02/10/2017 ULNRC-06400, Enclosure 7: Ameren Corporation by - Laws Effective 02/10/20172017-02-10010 February 2017 Enclosure 7: Ameren Corporation by - Laws Effective 02/10/2017 ML17097A5662016-12-31031 December 2016 Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits ULNRC-06349, Callaway, Unit 1 - Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits2016-12-31031 December 2016 Callaway, Unit 1 - Enclosure 4 to ULNRC-06349 - Statement of Net Assets Available for Benefits ML16348A3762016-12-13013 December 2016 Enclosure 3 - 2016 Proxy Statement of Ameren Corporation ULNRC-06341, Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation2016-12-13013 December 2016 Callaway Plant Unit 1 - Enclosure 3 - 2016 Proxy Statement of Ameren Corporation ULNRC-06341, Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/20162016-09-30030 September 2016 Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/2016 ML16348A3822016-09-30030 September 2016 Enclosure 8 - 10-Q Filed Period 9/30/2016 ML16348A3812016-06-30030 June 2016 Enclosure 7 - 10-Q Filed Period 6/30/2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/20162016-06-30030 June 2016 Callaway Plant Unit 1 - Enclosure 7 - 10-Q Filed Period 6/30/2016 ML16348A3802016-03-31031 March 2016 Enclosure 6 - 10-Q Filed Period 3/31/2016 ML16348A3882016-03-31031 March 2016 Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/20162016-03-31031 March 2016 Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016 ULNRC-06341, Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 20162016-03-31031 March 2016 Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 ML17097A5682016-03-30030 March 2016 Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement ULNRC-06349, Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement2016-03-30030 March 2016 Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement 2024-09-24
[Table view] |
Text
EFFECT OF A NON-FUNCTIONAL ACTUATOR TRAIN. ON MSIV OPERABILITY CALLAWAY PLANT, UNIT 1 In the existing Callaway Technical Specification (TS) 3.7.3 on the Main Steam Isolation Valve (MSIV), the operability of the MSIVs is addressed.
WHowever, there have been discussions between Region IV and NRC Headquarters on the question about whether the loss of one actuator made the MSIV inoperable, and the licensee submitted a license amendment request (LAR) by letter dated May 26, 2005, to include the loss of one of two actuator trains in the TSs, to resolve the issue.
In the licensee LAR, it is clearly stated that (1) the two actuator trains on each MSIV are dual and redundant trains and (2) each actuator train is designed so that a single train can close the MSIV by itself as required by the appropriate safety analyses. Each MSIV Actuator has two redundant and independent actuator trains. The Callaway design basis calculation of record (COR) concludes that eak post accident containment pressure is bounded with one non-to' Ihe line drawings sent
'NRC from the licensee to support a conference call with Region IV GATSIV operability also support these statements. There are check valves to prevent one actuator train discharging fluid into the other train so that the trains are isolated from each other.
To address the question of whether the MSIVs are operable under the current TS, the definition of operability in the Standard Technical Specifications is:
"A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety functions, and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its function(s) are also capable of performing.
their related support function(s)."