ML063200252
ML063200252 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 11/15/2006 |
From: | NRC/NRR/ADRO/DORL/LPLIV |
To: | |
Donohew J N, NRR/DORL/LP4, 415-1307 | |
Shared Package | |
ML062760065 | List: |
References | |
TAC MD2030 | |
Download: ML063200252 (35) | |
Text
TABLE OF CONTENTS 3.6 CONTAINMENT SYSTEMS (continued) 3.6.3 Containment Isolation Valves .......................................... 3.6-7 3.6.4 Containment Pressure................................................... 3.6-16 3.6.5 Containment Air Temperature .......................................... 3.6-17 3.6.6 Containment Spray and Cooling Systems ............................ 3.6-18 3.6.7 Recirculation Fluid pH Control (RFPC) System ....................... 3.6-21 3.6.8 Hydrogen Recombiners ................................................. 3.6-22 3.7 PLANT SYSTEMS ........................................................... 3.7-1 3.7.1 Main Steam Safety Valves (MSSVs)................................... 3.7-1 3.7.2 Main Steam Isolation Valves (MSIVs)................................. 3.7-5 3.7.3 MFl Vs and MFRVs and MFRV Bypass Valves ....................... 3.7-8 3.7.4 Atmospheric Steam Dump Valves (ASDs) ............................ 3.7-10 3.7.5 Auxiliary Feedwater (AFW) System .................................... 38.7-13 3.7.6 Condensate Storage Tank (CST) ...................................... 3.7-17 3.7.7 Component Cooling Water (CCW) System............................ 3.7-19 3.7.8 Essential Service Water System (ESW) ............................... 3.7-21 3.7.9 Ultimate Heat Sink (UHS)............................................... 3.7-23 3.7.10 Control Room Emergency Ventilation System (CREVS)............. 3.7-25 3.7.11 Control Room Air Conditioning System (CRACS) .................... 3.7-28 3.7.12 Not Used .................................................................. 3.7-31 3.'7.13 Emergency Exhaust System (EES) .................................... 3.7-32 3.7.14 Not Used .................................................................. 3.7-35 3.7.15 Fuel Storage Pool Water Level...............I........................... 3.7-36 3.7.16 Fuel Storage Pool Boron Concentration ............................... 3.7-37 3.7.17 Spent Fuel Assembly Storage.......................................... 3.7-39 3.7.18 Secondary Specific Activity ............................................. 3.7-41 3.8 ELECTRICAL POWER SYSTEMS ......................................... 3.8-1 3.8.1 AC Sources - Operating ................................................. 3.8-1 3.8.2 AC Sources - Shutdown................................................. 3.8-16 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air............................. 3.8-19 3.8.4 DC Sources - Operating ................................................. 3.8-22 3.8.5 DC Sources - Shutdown ................................................ 3.8-25 3.8.6 Battery Cell Parameters ................................................. 3.8-27 3.8.7 Inverters - Operating..................................................... 3.8-31 3.8.8 Inverters - Shutdown ..................................................... 3.8-33 3.8.9 Distribution Systems - Operating ....................................... 3.8-35
-3.8.-10 - Distribution Systems - Shutdown ..;......... ............... 3.8-37 CALLAWAY PLANT3Amnet17 3 Amendment 176
MSIVs 3.7.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1-- --------------------------- NOTE----------------------
Only required to be performed in MODES 1 and 2.
Verify isolation time of each MSIV is within limits. In accordance with the Inservice Testing Program SR 3.7.2.2-- -- - ------------------------ NOTE --------------------- -
Only required to be performed in MODES 1 and 2.
Verify each MSIV actuates to the isolation position on 18 months an actual or simulated actuation signal.
CALLAWAY PLANT 3.7-7 CALLAAY PANT .7-7Amendment No. 176
MFIVs and MFRVs and MFRV Bypass Valves 3.7.3 ACTIONS (continued) _______________ ________
CONDITION REQUIRED ACTION CMLTIME D. Two valves in the same D.1 Isolate affected flow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> flow path inoperable, path.
E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1-- --------------------------- NOTE----------------------
Only required to be performed in MODES 1 and 2.
Verify the closure time of each MFRV and MFRVBV is Inaccordance with within limits. the Inservice Testing Program SR 3.7.3.2, ----- w----------------------- NOTE----------------------
For the MFRVs and MFR VBVs, only required to be performed in MODES 1 and 2.
Verify each MFIV, MFRV and MFRVBV actuates to 18 months the isolation position on an actual or simulated actuation signal.
SR 3.7.3.3 Verify the closure time of each MFIV is within limits. Inaccordance with the Inservice I Testing Program CALLAWAY PLANT 3.7-9 CALLAAY PANT .7-9Amendment No. 176
ASDs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Atmospheric Steam Dump Vaives (ASDs)
LCO 3.7.4 Four ASD lines shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
COMPLETIO CONDITION REQUIRED ACTION CMLTIME A. One required ASD line A.1 Restore required ASD -7days inoperable for reasons line to OPERABLE other than excessive ASD status.
seat leakage.
B. Two required ASD lines B.1 Restore all but one 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons required ASD line to other than excessive ASD OPERABLE status.
seat leakage.
C. Three or more required C.1 Restore all but two 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ASD lines inoperable for required ASD lines to reasons other than OPERABLE status.
excessive ASD seat leakage.
(continued)
CALLAWAY PLANT 3.7-10 Amendment No. 176 I
ASDs 3.7.4 ACTIONS (continued) _______________ ________
CONDITION REQUIRED ACTION CMLTIME D. With one or more of the D.1 Initiate action to close Immediately required ASD(s) inoperable the Associated manual because of excessive seat isolation valve(s).
leakage.
AND D.2 Restore ASD(s) to 30 days OPERABLE status.
E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CALLAWAY PLANT 371 3.7-11 mnmn No.
Amendment o 176 7
I
ASDs 3.7.4 SURVEILLANCEREQUIREMENTS _______
SURVEILLANCE FREQUENCY SR 3.7.4.1-- ---------------------------- NOTE----------------------
Only required to be performed in MODES 1 and 2.
Verify one complete cycle of each ASD. In accordance with the Inservice Testing Program SR 3.7.4.2 Verify one complete cycle of each ASD manual In accordance with isolation valve. the Inservice Testing Program CALLAWAY PLANT 371 3.7-12 mnmn No.
Amendment 7 o 176 I
AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AEW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE ---
LCO 3.0.4.b is not applicable when entering MODE 1.
CONDITION REQUIRED ACTION CMLTIME A. One steam supply to A. 1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status.
inoperable. AND 10 days from discovery of failure to meet the LCO B. One ESW supply to turbine B.1 Restore ESW supply to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> driven AFW pump OPERABLE status.
inoperable. AND 10 days from discovery of failure to meet the LCO (continued)
CALLAWAY PLANT 371 3.7-13 mnmn No.
Amendment o 1767 I
AFW System 3.7.5 ACTIONS (continued)__________________________
CONDITION REQUIRED ACTION CMLTIME C. One AFW train inoperable C.1I Restore AFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*
for reasons other than OPERABLE status.
Condition A or B. AND 10 days from discovery of failure to meet the LCO D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A, B AND or C not met.
OR D.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Two AFW trains inoperable.
E. Three AFW trains E.1 ------ NOTE---------
inoperable. LCO 3.0.3 and all other LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.
Initiate action to restore Immediately one AFW train to OPERABLE status.
- With the exception that the Completion Time associated with the Condition C entry on 2/3/04 for the turbine driven auxiliary feedwater pump has been extended on a one-time only basis to 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br />. At the time a formal cause of the inoperability is determined, Condition D will be entered immediately.- -
CALLAWAY PLANT 3.7-14 Amendment No. 176 I
AFW System 3.7.5 SURVEILLANCEREQUIREMENTS _______
SURVEILLANCE FREQUENCY SR 3.7.5.1-- --------------------------- NOTE----------------------
Only required to be performed for the AFW flow control valves when the system is placed in automatic control or when THERMAL POWER is > 10% RTP.
Verify each AFW manual, power operated, and 31 days automatic valve in each water flow path, and in both steam supply flow paths to the steam turbine driven pump, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.7.5.2----------------------------- NOTE----------------------
Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after Ž! 900 psi 9 in the steam generator.
Verify the developed head of each AFW pump at the Inaccordance with flow test point is greater than or equal to the required the Inservice Test developed head. Program SR 3.7.5.3 Verify each AFW automatic valve that is not locked, 18 months sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
(continued)
CALLAWAY PLANT 3.7-15 CALLWAYPLAN 3.-15Amendment No. 176 I
AFW .Systenm' 3.7.5 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.7.5.4 -----------------------
NOTE----------------------
Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after Ž! 900 psig in the steam generator.
Verify each AFW pump starts automatically on an 18 months actual or simulated actuation signal.
SR 3.7.5.5 Verify proper alignment of the required AFW flow Prior to entering paths by verifying flow from the condensate storage MODE 2 tank to each steam generator. whenever unit has been in MODE 5 or 6 for > 30 days CALLAWAY PLANT 3.7-16 CALLWAYPLAN No. 176 3.-16Amendment
CST 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Condensate Storage Tank (CST)
LCO 3.7.6 The CST contained water volume shall be >! 281,000 gal.
APPLICABILITY: MODES 1, 2, and 3.
COMPLETIO CONDITION REQUIRED ACTION CMLTIME A. CST contained water A.1 Verify by administrative 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> v olume not within limit, means OPERABILITY of backup water supply. AND AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter A.2 Restore CST contained 7 days water volume to within limit.
B. Required Action and B..A Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CALLAWAY PLANT 3.7-17 CALLWAYPLAN 3.-17Amendment No. 176 I
CST 3.7.6 SURVEILLANCEREQUIREMENTS _______
SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify the CST contained water Volume is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
>281,000 gal.
CALLAWAY PLANT 3.7-118 Amendment No. 176 I
COW System 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Component Cooling Water (CCW) System LCO 3.7.7 Two CCW trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 4.
COMPLETIO CONDITION REQUIRED ACTION CMLTIME A. One CCW train inoperable. A.1 ------ NOTE---------
Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops - MODE 4,"
for residual heat removal loops made inoperable by CCW.
Restore CCW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> CALLAWAY PLANT 3.7-19 Amendment No. 176 I
COW System 3.7.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.7.1 -------------------------- NOTE ----------------------
Isolation of CCW flow to individual components does not render the CCW System inoperable.
Verify each CCW manual, power operated, and 31 days automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.7.7.2 Verify each CCW automatic valve in the flow path that 18 months is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.7.7.3 Verify each COW pump starts automatically on an 18 months actual or simulated actuation signal.
CALLAWAY PLANT 3.7-20 Amendment No. 176 I
ESW 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Essential Service Water System (ESW)
LCO 3.7.8 Two ESW trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION CMLTIME A. One ESW train inoperable. A.1 ------ NOTE---------
for emergency diesel generator made inoperable by ESW.
for residual heat removal loops made inoperable by ESW.
Restore ESW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.
(continued)
CALLAWAY PLANT 3.7-2 1 Amendment No. 176 I
ESW 3.7.8 ACTIONS (continued)__________________________
COMPLETION CONDITION REQUIRED ACTION TIME B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2) Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 ---------------------------- NOTE ----------------------
Isolation of ESW flow to individual components does not render the ESW inoperable.
Verify each ESW manual, power operated, and 31 days automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.7.8.2 Verify each ESW automatic valve in the flow path that 18 months is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.7.8.3 Verify each ESW pump starts automatically on an 18 months actual or simulated actuation signal.
CALLAWAY PLANT 3.7-22 Amendment No. 176 I
UHS 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Ultimate Heat Sink (UHS)
LCO 3.7.9 The UHS shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS _______
CONDITION REQUIRED ACTION CMLTIME A. One cooling tower train A.1 Restore cooling tower 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable, train to OPERABLE status.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
OR B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> UHS inoperable for reasons other than Condition A.
CALLAWAY PLANT 3.7-23 CALLWAYPLAN 3.-23Amendment No. 176
UHS 3.7.9 SURVEILLANCE REQUIREMENTS_______
SURVEILLANCE FREQUENCY SR 3.7.9.1 Verify water level of UHS is Ž! 831.25 ft mean sea 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> level.
SR 3.7.9.2 Verify average water temperature of UHS is *ý900F. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.7.9.3 Operate each cooling tower fan for Ž: 15 minutes in 31 days both the fast and slow speed.
CALLAWAY PLANT 3.7-24 Amendment No. 176 I
ORE VS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Emergency Ventilation System (CREVS)
LCO 3.7.10 Two ORE VS trains shall be OPERABLE.
NO TE ----------------
The control room boundary may be opened intermittently under administrative control.
APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies.
COMPLETIO CONDITION REQUIRED ACTION CMLTIME A. One ORE VS train A.1 Restore CREVS train to 7 days inoperable. OPERABLE status.
B. Two CREVS trains B.1 Restore control room 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable due to boundary to OPERABLE inoperable control room status.
boundary in MODES 1, 2, 3, and 4.
C. Required Action and 0. 1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B not met in MODE 1, 2, 3, or 4. AND 0.21 BQe in MODE 5. 36. hours-_
(continued)
CALLAWAY PLANT 3.7-25 Amendment No. 176
'I
ORE VS 3.7.10 ACTIONS (continued)
COMPLETION CONDITION REQUIRED ACTION TIME D. Required Action and D.1.l1 Place OPERABLE Immediately associated Completion CREVS train in CRVIS Time of Condition A not met mode.
in MODE 5 or 6, or during movement of irradiated fuel assemblies.
AND D.1 .2 Verify OPERABLE Immediately CREVS train is capable of being powered by an emergency power source.
OR D.2.1 Suspend CORE Immediately ALTERATIONS.
AND D.2.2 Suspend movement of Immediately irradiated fuel assemblies.
E. Two CREVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 or 6, ALTERATIONS.
or during movement of irradiated fuel assemblies. AND E.2 Suspend movement of Immediately irradiated fuel assemblies.
F. Two CREVS trains F1 Enter LCO 3.0.3. Immediately inoperable in MODE 1,2, 31-or 4 for reasons other than Condition B.
CALLAWAY PLANT 3.7-26 CALLWAYPLAN 3.-26Amendment No. 176
ORE VS 3.7.10 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.10.1 Operate each CREVS train pressurization filter unit 31 days for Ž! 10 continuous hours with the heaters operating and each ORE VS train filtration filter unit for
>15 minutes.
SR 3.7.10.2 Perform required CREVS filter testing in accordance Inaccordance with with the Ventilation Filter Testing Program (VFTP). VFTP SR 3.7.10.3 Verify each CREVS train actuates on an actual or 18 months simulated actuation signal.
SR 3.7.10.4 Verify one CREVS train can maintain a positive 18 months on a pressure ofŽý 0. 125 inches water gauge, relative to STAGGERED the outside atmosphere during the ORVIS mode of TEST BASIS operation.
CALLAWAY PLANT 3.7-27 Amendment No. 176 I
CRACS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Control Room Air Conditioning System (CRACS)
LCO 3.7.11 Two CRACS trains shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies.
ACTIONS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
CONDITION REQUIRED ACTION CMLTIME '
A. One CRAGS train A.1 Restore CRACS train to 30. days inoperable. OPERABLE status.
B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not met AND in MODE 1, 2, 3, or 4.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
CALLAWAY PLANT 3.7-28 Amendment No. 176 I
CRACS 3.7.11 ACTIONS (continued)
CONDITION REQUIRED ACTION CMLTIME C. Required Action and 0. 1.1 Place OPERABLE Im mediately associated Completion CRACS train in Time of Condition A not met operation.
in MODE 5 or 6, or during movement of irradiated fuel AND assemblies.
C.1.2 Verify OPERABLE Immediately CRACS train is capable of being powered by an emergency power source.
OR C.2.1 Suspend CORE Immediately ALTERATIONS.
AND C.2.2 Suspend movement of Immediately irradiated fuel assemblies.
D. Two CRACS trains D.1 Suspend CORE Immediately inoperable in MODE 5 or 6, ALTERATIONS.
or during movement of irradiated fuel assemblies. AND D.2 Suspend -movement of Immediately irradiated fuel assemblies.
E. Two CRACS trains E.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4.
CALLAWAY PLANT 3.7-29 Amendment No. 176 I
CRACS 3.7.11 SURVEILLANCE REQUIREMENTS _______
SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify each CRACS train has the capability to remove 18 months the assumed heat load.
CALLAWAY PLANT 373 3.7-30 mnmn No.
Amendment 7 o 176
3.7.12 3.7 PLANT SYSTEMS 3.7.12. Not Used.
CALLAWAY PLANT 3.7-31 Amendment No. 176
Emergency Exhaust System 3.7.13 3.7 PLANT SYSTEMS 3.7.13 Emergency Exhaust System (EES)
LCO 3.7.13 Two EES trains shall be OPERABLE.
NO--- T E -----------------------
The auxiliary or fuel building boundary may be opened intermittently under administrative control.
APPLICABILITY: MODES 1, 2, 3, and 4, During movement of irradiated fuel assemblies in the fuel building.
NOTE ----------------------------------
The SIS mode of operation is required only in MODES 1, 2, 3 and 4. The FBVIS mode of operation is required only during movement of irradiated fuel assemblies in the fuel building.
COMPLETIO CONDITION REQUIRED ACTION CMLTIME A. One EES train inoperable in A.1 Restore EES train to 7 days MODE 1, 2, 3, or 4. OPERABLE status.
B. Two EES trains inoperable B.1 Restore auxiliary building 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> due to inoperable auxiliary boundary to OPERABLE building boundary in status.
MODE 1,2, 3 or 4.
(continued)
CALLAWAY PLANT 3.7-32 Amendment No. 176 I
Emergency Exhaust System 3.7.13 ACTIONS (continued)___________________________
CONDITION REQUIRED ACTION CMLTIME C. Required Action and C. Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B not AND met in MODE 1, 2, 3, or 4.
C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Two EES trains inoperable in MODE 1, 2, 3, or 4 for reasons other than Condition B.
D. One EES train inoperable D.1 Place OPERABLE EES Immediately during movement of train in the FBVIS mode.
irradiated fuel assemblies in the fuel building. OR D.2 Suspend movement of Immediately irradiated fuel assemblies in the fuel building.
E. Two EES trains inoperable E.1 Suspend movement of Immediately' during movement of irradiated fuel irradiated fuel assemblies in assemblies in the fuel the fuel building. building.
CALLAWAY PLANT 3.7-33 Amendment No. 176 i
Emer~gency Exhaust System 3.7.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SIR 3.7.13.1 Operate each EES train for Ž10 continuous hours 31 days with the heaters operating.
SR 3.7.13.2 Perform required EES filter testing in accordan ce with Inaccordance with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.13.3 Verify each EES train actuates on an actual or 18 months simulated actuation signal.
SR 3.7.13.4 Verify one EES train can maintain a negative pressure 18 months on a
>! 0.25 inches water gauge with respect to STAGGERED atmospheric pressure in the auxiliary building during TEST BASIS the SIS mode of operation.
SR 3.7.13.5 Verify one EES train can maintain a negative pressure 18 months on a
>0.25 inches water gauge with respect to STAGGERED atmospheric pressure in the fuel building during the TEST BASIS FBVIS mode of operation.
CALLAWAY PLANT 3.7-34 Amendment No. 176 I
3.7.14 3.7 PLANT SYSTEMS 3.7.14 Not Used.
CALLAWAY PLANT 3.7-35 Amendment No. 176 I
Fuel Storage Pool Water Level 3.7.15 3.7 PLANT SYSTEMS 3.7.15 Fuel Storage Pool Water Level LCO 3.7.15 storage racks.
APPLICABILITY: During movement of irradiated fuel assemblies in the fuel storage pool.
ACTIONS ____________________
COMPLETION CONDITION REQUIRED ACTION TIME A. Fuel storage pool water A.1- ------------ NOTE---------
level not within limit. LCO 3.0.3 is not applicable.
Suspend movement of Immediately irradiated fuel assemblies in the fuel storage pool.
SURVEILLANCEREQUIREMENTS _______
SURVEILLANCE FREQUENCY SIR 3.7.15.1 Verify the fuel storage pool water level is Ž!23 ft 7 days above the storage racks.
CALLAWAY PLANT 3.7-36 Amendment No. 176 I
Fuel Storage Pool Boron Concentration 3.7.16 3.7 PLANT SYSTEMS 3.7.16 Fuel Storage Pool Boron Concentration LCO 3.7.16 The fuel storage pool boron concentration shall be Ž! 2165 ppm.
APPLICABILITY: When fuel assemblies are stored in the fuel storage pool and a fuel storage pool verification has not been performed since the last movement of fuel assemblies in the fuel storage pool.
ACTIONS CONDITION REQUIRED ACTION CMLTIME A. Fuel storage pool boron- ----------------- NOTE ---------------
concentration not within LCO 3.0.3 is not applicable.
limit.-- ----------------- --- --
A. 1 Suspend movement of Immediately fuel assemblies in the fuel storage pool.
AND A.2.1 Initiate action to restore Immediately fuel storage pool boron concentration to within limit.
OR A.2.2 Verify by administrative Immediately means that a non-Region 1 fuel storage pool verification has been performed since the last movement of fuel assemblies in the fuel storage pool.
CALLAWAY PLANT 3.7-37 Amendment.No. 176 I
Fuel Storage Pool Boron Concentration 3.7.16 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.16.1 Verify the fuel storage pool boron concentration is 7 days within limit.
CALLAWAY PLANT 3.7-38 Amendment No. 176 I
Spent Fuel Assembly Storage 3.7.17 3.7 PLANT SYSTEMS 3.7.17 Spent Fuel Assembly Storage LCO 3.7.17 The combination of initial enrichment and burnup of each spent fuel assembly stored in Region 2 or 3 shall be within the Acceptable Domain of Figure 3.7.17-1 or in accordance with Specification 4.3. 1,1.
,APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage pool.
ACTIONS__________ ___
CONDTIO REUIRE ACIONCOMPLETION CONDTIO REUIRE ACIONTIME A. Requirements of the LCO A.1----------------NOTE ----------
not met. LCO 3.0.3 is not applicable.
Initiate action to move Immediately the noncomplying fuel assembly to Region 1.
SURVEILLANCEREQUIREMENTS _______
SURVEILLANCE FREQUENCY SR 3.7.17.1 Verify by administrative means the initial enrichment Prior to storing the and burnup of the fuel assembly is in accordance with fuel assembly in Figure 3.7.17-1 or Specification 4.3.1.1. Region 2 or 3 CALLAWAY PLANT 3.7-39 Amendment No. 176 I
Spent Fuel Assembly Storage 3.7.17 55000 50000 D
45000 It 40000 D
(A, 35000 0
IL 30000
-J 25000 20000 15000 UV)
_j1 10000 I
5000 0
FUEL ASSEMBLY INITIAL ENRICHMENT (w/o U-235)
-- -figure - 3.7.17-1 (page 1 of-1)
MINIMUM REQUIRED FUEL ASSEMBLY BURNUP AS A FUNCTION OF INITIAL ENRICHMENT TO PERMIT STORAGE IN REGIONS 2 AND 3 CALLAWAY PLANT 374 3.7-40 mnmn No.
Amendment o 176 7
Secondary Specific \ctivity 3.7.18 3.7 PLANT SYSTEMS 3.7.18 Secondary Specific Activity LCO 3.7.18 DOSE EQUIVALENT 1-131.
APPLICABILITY: MODES 1, 2, 3, and 4.
COMPLETNO CONDITION REQUIRED ACTION CMLTIME A. Specific activity not within A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> limit.
AND A-2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCEREQUIREMENTS _______
SURVEILLANCE FREQUENCY SR 3.7.18.1 Verify the specific activity of the secondary coolant is 31 days
<0.10 Ci/gm DOSE EQUIVALENT 1-131.
CALLAWAY PLANT 3.7-4 1 Amendment No. 176
.I