Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-11-111, Update to Correspondence Addressees and Service Lists30 June 2011Update to Correspondence Addressees and Service Lists
ML11165009730 June 2011Fleet - Approval of Change from Emergency Action Level Scheme Based on NEI 99-01, Revision 4, to NEI 99-01, Revision 5Internal Flooding
Fuel cladding
RS-11-110, Exelon Generation Co, LLC, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations.29 June 2011Exelon Generation Co, LLC, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-11-110, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations.29 June 2011Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML11174018228 June 2011Branch Chief Reassignment
ML11182B05428 June 2011NRR E-mail Capture - Request for Additional Information Regarding Cyber Security Plan License ConditionCyber Security
ML11166176627 June 2011Closeout of Generic Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML11167073124 June 2011Threshold Determination Under 10 CFR 50.80 - Request for Additional Information
RS-11-105, Response to Request for Additional Information Regarding Request for Threshold Determination Under 10 CFR 50.8024 June 2011Response to Request for Additional Information Regarding Request for Threshold Determination Under 10 CFR 50.80
ML11174A13122 June 2011FOIA/PA-2011-0187 - Resp 3 - Final
ML11172A04020 June 2011Letter to Exelon Regarding Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff
ML11172A01920 June 2011Notice of Meeting on Edocs Between Exelon and NRC Region III Staff
TAC:ME627017 June 2011
ML11168041117 June 2011Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287)
TAC:ME626917 June 2011
ML11181A08317 June 2011NRR E-mail Capture - Exelon Draft Decommissioning Trust Fund RAIs
RS-11-103, Revision to Exelon Fitness for Duty Performance Data Reports Annual 201016 June 2011Revision to Exelon Fitness for Duty Performance Data Reports Annual 2010Fitness for Duty
ML12117039514 June 2011Office of Nuclear Reactor Regulations Forum, Portions Outside of Scope
ML11154021713 June 2011Correction to Issuance of License Amendment No. 193, Regarding Various Administrative Technical Specifications Changes
RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies.13 June 2011License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies.Shutdown Margin
Anticipated operational occurrence
TAC:ME653013 June 2011
TAC:ME64028 June 2011
RA-11-004, County, Limerick, Oyster Creek, Peach Bottom, Quad Cities, Three Mile Island, 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.8 June 2011County, Limerick, Oyster Creek, Peach Bottom, Quad Cities, Three Mile Island, 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.B.5.b Mitigating Strategies
ML1116505666 June 2011Single Positive Test Form, for Pre-Access, Collected on 01/07/2010
ML1116505656 June 2011Single Positive Test Form, for Pre-Access, Collected on 01/05/2010
ML11157A1221 June 2011Ltr. 06/01/2011: Confirmation of Initial Operator License Examinations- Clinton Power Station
ML12044009926 May 2011Single Positive Test Form, for Pre-Access, Collected on 04/18/2011
ML11133055626 May 2011License Amendment No. for Various Administrative Technical Specifications ChangesSurveillance Frequency Control Program
IR 05000461/201140320 May 2011IR 05000461-11-403; 04/4/2011 - 04/8/2011; Exelon Nuclear Corporate; Clinton Power Station; Routine Security Baseline Inspection - Cover LetterSignificance Determination Process
Affidavit
TMI-11-090, Supplement to Exelon Cyber Security Plan19 May 2011Supplement to Exelon Cyber Security PlanCyber Security
RS-11-084, Request for Threshold Determination Under 10 CFR 50.8018 May 2011Request for Threshold Determination Under 10 CFR 50.80
ML11137008717 May 2011E-mail Exelon Confirmation of Single Positive Test Form OriginalsFitness for Duty
IR 05000461/201101113 May 2011IR 05000461-11-011, on 03/23/2011 - 04/29/2011, Clinton Power Station, Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage EventFire Barrier
Functionality Assessment
B.5.b
Seismically rugged
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
Fire Protection Program
ML1109805389 May 2011Cyber Security Plan Implementation ScheduleCyber Security
ML1109702196 May 2011Correction to Issuance of License Amendments Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a License-controlled ProgramSurveillance Frequency Control Program
IR 05000461/20110105 May 2011IR 05000461-11-010, on 4/11/11 - 4/15/11, Clinton Power Station (Cps), Unit 1
ML1112600415 May 2011Summary of the Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and the Clinton Power Station 2010 End-Of-Cycle Plant Performance AssessmentOpen House
ML1112606104 May 2011Confirmation of Initial License Examination
U-604017, Annual Radiological Environmental Operating Report for the Period of January 1 Through December 31, 201030 April 2011Annual Radiological Environmental Operating Report for the Period of January 1 Through December 31, 2010Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
IR 05000461/201100229 April 2011IR 05000461-11-002; 01/01/11 - 03/31/11; Clinton Power Station, Unit 1; Fire Protection, Surveillance TestingSafe Shutdown
Unanalyzed Condition
High winds
High Radiation Area
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Missed surveillance
Significance Determination Process
Fire Protection Program
Substantial potential for overexposure
Power change
Overexposure
U-604018, Annual Radioactive Effluent Release Report28 April 2011Annual Radioactive Effluent Release ReportSafe Shutdown
Time of Discovery
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML11119053128 April 2011Clinton Power Station Cy 2010 End-of-Cycle Open House Presentation (Short)Open House
ML11119052128 April 2011Clinton Power Station Cy 2010 End-Of-Cycle Open House PresentationOpen House
ML11125023628 April 2011Submittal of 2010 Annual Radiological Environmental Operating Report for the Period January 1, 2010 Through December 31, 2010Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
U-604019, Annual Dose Report for 201026 April 2011Annual Dose Report for 2010
IR 05000461/201100925 April 2011Fire Protection Triennial Baseline Inspection NRC Inspection Report 05000461/2011-009Hot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
B.5.b
Significance Determination Process
Thermoset
B.5.b Mitigating Strategies
Fire Protection Program
ML11116A14125 April 2011IR 05000461-11-009, on 03/18/11, Clinton Power Station, Routine Triennial Fire Protection Baseline InspectionHot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
B.5.b Mitigating Strategies
Fire Protection Program
RS-11-055, Additional Information Related to License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System.22 April 2011Additional Information Related to License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System.Anticipated operational occurrence
Feedwater Controller Failure
IR 05000461/201120122 April 2011Cover Letter: Inspection Report 05000461-11-201; March 21 - March 23, 2011, Clinton Nuclear Power Station, Target Set InspectionAffidavit
Press Release-III-11-009, NRC Schedules Open House for April 28 to Discuss Clinton Nuclear Power Plant Performance and NRC Oversight14 April 2011Press Release-III-11-009: NRC Schedules Open House for April 28 to Discuss Clinton Nuclear Power Plant Performance and NRC OversightOpen House