Correction to Issuance of License Amendment No. 193, Regarding Various Administrative Technical Specifications Changes
ML111540217
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/13/2011
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Pacilio M
Exelon Nuclear
DiFrancesco N, NRR/DORL/LPL3-2, 415-1115
References
TAC ME4030
Download: ML111540217 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001

..ltJrE 13, XJl1 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION, UNIT NO.1 - CORRECTION TO ISSUANCE OF LICENSE AMENDMENT NO. 193 REGARDING VARIOUS ADMINISTRATIVE TECHNICAL SPECIFICATIONS CHANGES (TAC NO. ME4030)

Dear Mr. Pacilio:

By letter dated May 26. 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111330556). the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 193 to Facility Operating License No. NPF-62 for the Clinton Power Station (CPS). Unit No.1. The amendment removes an expired time-related item and several typographical errors from the CPS Technical Specifications.

After issuance. it became apparent that the incorrect facility operating license (FOL), page 3.

was distributed via Listserv. Enclosed is the correct FOL page 3. Note that the official agency record dated May 26, 2011, as archived in ADAMS contains the correct FOL page 3. This error did not impact Amendment No. 193 as this is an administrative correction and does not change the NRC staff conclusions.

We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please contact me at (301) 415-1115.

Sincerely, Nicholas J. DiFrancesco, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

As stated cc: Distribution via Listserv

(4) Exelon Generation Company, purwant to tIw Act and to 10 CPR Pa1t130.

IOUfCe and lpecial nuclear rneterialae I"'"

40. and 70, to receive. PGMIII. and UN
  • any lime any byproduCt.

neutron aources for reactor monitoring required:

eq..,..,.

1taItUp. . . . . eourcea for NaCtOr tnetrumenlattan and F8dIatIan calibration. and _ flallan detectOrs In llTlaunts ..

(5, ExeIon Generation Company. purauMt to the Aot and 10 CPR Pertl 30.

40. and 70. to receive. paI_, n .... n amOWlllu required any byproduCt.lOII'Ce or . . . . nuct_ m.... without r~ to chemical or phyaIaal 101m, for..,.pte an-VIiI or i1ItrUment cellbrallon or

. .ociaI8d wtth radlo8cttYe apparatus or components; (I) Extlon Generation Company. purauent to 1ht Act and 10 CFR PIIta 30.

40. and 70. to poIHII. but not Mpnte**UGh byplOdUc:t and apectaI nucl.... materialS. may be proauced by the operallon of the facllHy.

Mechanical dlHlMmbly of the GE14111otope ... ....."bIeI CXI1tllning Cabelt..fJO Is "01 coneIdered ...,.-adon; .-1d (7) ExelDn G.....on Company, putlUlnl to Ihe let and 10 CFA Part 30. to intentiOnally produce. pose..., receIVe, transler. and UH CobaI-eo.

C. 'Thll1icen- IhaII be delmed to contain and IlIUbjeaI to the conc:tItlons specified In . . Commlsllon's .......tIon8 III forth In 10 CFR Chap'. , and as atbfect to aI appIlcible provillalw of . . AlA and to the rulel............. and ordera of d'te eommlllllOn now or -.rter In etrect; and is subject to the adcItIanaI condldolw apICIfted or IncorponIted below; (1) Mallmwn Pear lfY'I

&81On 0.,....., CQnpany .. authorfzecl to operate the facility at reactor core power levels not In .ceee at 3473 megawa. thermal (100 percent rated powrer) In accardance wtIh the condllorw epecltled herein.

(2) Itcbnlcal §McIlgattcg at EnytrgrunlD1ll ~ PI'll The Teahn_ 8pedficllUana contIMMClln Appendbc A and the Envt""""..a Ftracectlort ..... GOnIaInN In I\ppWIdIx 8,

  • rwlled Ihraugh Amelldmenl No. 191.. are hereby Inccrporaled Into 1hll1iOenae.

E.aon Gener~ . .II ...... the tacIIIy In 8COORIanoe wfth

.... Technical S and the EnvIronmental Protection PI.,.

Amendm.,. No... 193

June 13, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION, UNIT NO.1 - CORRECTION TO ISSUANCE OF LICENSE AMENDMENT NO. 193 REGARDING VARIOUS ADMINISTRATIVE TECHNICAL SPECIFICATIONS CHANGES (TAC NO. ME4030)

Dear Mr. Pacilio:

By letter dated May 26, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111330556), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 193 to Facility Operating License No. NPF-62 for the Clinton Power Station (CPS), Unit NO.1. The amendment removes an expired time-related item and several typographical errors from the CPS Technical Specifications.

After issuance, it became apparent that the incorrect facility operating license (FOL), page 3, was distributed via Listserv. Enclosed is the correct FOL page 3. Note that the official agency record dated May 26, 2011, as archived in ADAMS contains the correct FOL page 3. This error did not impact Amendment No. 193 as this is an administrative correction and does not change the NRC staff conclusions.

We regret any inconvenience this may have caused. Should you have any questions regarding this matter, please contact me at (301) 415-1115.

Sincerely, IRA!

Nicholas J. DiFrancesco, Project Manager Plant licenSing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

As stated cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-2 RlF RidsNrrLASRohrer Resource RidsNrr DorlLpl3-2 Resource RidsNrrPMClinton Resource RidsAcrs_MailCTR Resoruce RidsRgn3MailCenter Resource ADAMS Accession No ML111540217 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME NDiFrancesco SRohrer JZimmerman DATE 6/10/11 6/9111 6/13/11 OFFICIAL RECORD COpy