IR 05000272/2009402 | 25 June 2009 | Revision to Salem and Hope Creek Generating Stations - NRC Security Inspection Report 05000272-09-402, 05000311-09-402 and 05000354-09-402 | |
ML110060136 | 24 June 2009 | Hope Creek, HC.OP-EO.ZZ-0318(Q), Rev. 6, Containment Venting. | |
SCH09-074, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for the Month of May 2009 | 24 June 2009 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for the Month of May 2009 | NJPDES |
LR-N10-0355, Hope Creek, HC.OP-EO.ZZ-0318(Q), Rev. 6, Containment Venting. | 24 June 2009 | Hope Creek, HC.OP-EO.ZZ-0318(Q), Rev. 6, Containment Venting. | |
LR-N10-0355, Hope Creek, HC.OP-IO.ZZ-0008(Q), Rev. 29, Shutdown from Outside Control Room. | 23 June 2009 | Hope Creek, HC.OP-IO.ZZ-0008(Q), Rev. 29, Shutdown from Outside Control Room. | Safe Shutdown Stroke time Hydrostatic Emergency Lighting |
ML110060145 | 23 June 2009 | Hope Creek, HC.OP-IO.ZZ-0008(Q), Rev. 29, Shutdown from Outside Control Room. | Safe Shutdown Stroke time Hydrostatic Emergency Lighting |
ML091730278 | 22 June 2009 | PSEG Drop-in Visit (Salem and Hope Creek) on 6-18-2009 | |
ML091700321 | 18 June 2009 | PSEG Slides from Drop-in Meeting, 6-18-2009 | |
LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination | 11 June 2009 | Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination | Probabilistic Risk Assessment |
TAC:ME1478 | 11 June 2009 | ||
LR-N10-0355, Salem/Operations, S1.OP-AB.RAD-0001(Q), Rev. 31, Abnormal Radiation. | 9 June 2009 | Salem/Operations, S1.OP-AB.RAD-0001(Q), Rev. 31, Abnormal Radiation. | |
ML110060518 | 9 June 2009 | Salem/Operations, S1.OP-AB.RAD-0001(Q), Rev. 31, Abnormal Radiation. | |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 22 | 9 June 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 22 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML101300370 | 9 June 2009 | Attachment 1, Offsite Dose Calculation Manual, Revision 22 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML091590002 | 8 June 2009 | Acceptance Review for TACs ME1279 & ME1280 - Salem Units 1 and 2 - Relocate Crane TSs | |
ML091560308 | 5 June 2009 | Requalification Program Inspection Salem Generating Station | |
ML090690802 | 2 June 2009 | Issuance of Amendments Elimination of Unnecessary Reporting Requirements | Safe Shutdown Fire Protection Program |
ML091520114 | 1 June 2009 | Acceptance Review for TAC Nos. ME1270, ME1271 and ME1272 - Salem Relief Requests SC-I3R-91 and S1-I3R-92 | |
LR-N09-0099, Annual Radioactive Effluent Release Report, Page 181 Through End | 31 May 2009 | Annual Radioactive Effluent Release Report, Page 181 Through End | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML091280378 | 31 May 2009 | Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
LR-N09-0099, Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | 31 May 2009 | Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
SCH09-065, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for Salem Generating Station for Month of April 2009 | 22 May 2009 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report for Salem Generating Station for Month of April 2009 | NJPDES |
ML091690531 | 20 May 2009 | Drawing 3, Tritium Results Beyond Unit 1 Grs Area | |
ML091690533 | 20 May 2009 | Figure 4, Water Table Elevation Contours During Operation of the Permanent System January 2008 | |
ML091690536 | 20 May 2009 | Figure 7, Water Table Elevation Contours During Operation of the Permanent System December 2008 | |
ML091470279 | 20 May 2009 | License Amendment Request S09-01, Change to Technical Specifications Definition of Fully Withdrawn Rod Cluster Control Assemblies | |
ML091690535 | 20 May 2009 | Figure 6, Water Table Elevation Contours During Operation of the Permanent System August 2008 | |
ML091380478 | 15 May 2009 | IR 05000272-09-402, IR 05000311-09-402, and IR 05000354-09-402, on 04/06/2009 - 04/10/2009, Salem and Hope Creek, Access Control - Cover Letter | Significance Determination Process |
ML091380380 | 15 May 2009 | Summary O Meeting with PSEG Nuclear, Llc., on Salem, Unit 1 and 2 and Hope Creek Annual Assessment | |
ML090860966 | 14 May 2009 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Deletion of Technical Specification Requirements Related to Plant Staff Working Hours | Safe Shutdown Fitness for Duty Fire Protection Program |
TAC:ME1270 | 12 May 2009 | ||
LR-N09-0104, Relief Requests Associated with the Third Inservice Inspection Interval | 12 May 2009 | Relief Requests Associated with the Third Inservice Inspection Interval | Hydrostatic VT-2 |
ML091320110 | 5 May 2009 | Aam Sign-in Sheets, 05/05/2009 | |
LR-N09-0103, Submittal of 2008 Summary of Revised Regulatory Commitments | 5 May 2009 | Submittal of 2008 Summary of Revised Regulatory Commitments | |
ML091260553 | 5 May 2009 | PSEG Nuclear Slides, Salem/Hope Creek Aam, 5/5/09 | |
ML091060482 | 5 May 2009 | NRC Slides, for 5/5/09 Public Meeting | |
ML091270239 | 4 May 2009 | Calvert County Sheriff- Special Operations Team | |
Press Release-I-09-026, NRC to Discuss Annual Assessment for Salem, Hope Creek Plants at Public Meeting Set for May 5 in Woodstown, N. J | 30 April 2009 | Press Release-I-09-026: NRC to Discuss Annual Assessment for Salem, Hope Creek Plants at Public Meeting Set for May 5 in Woodstown, N. J | |
ML091200011 | 30 April 2009 | Acceptance Review for TACs ME0900 & ME0901 - Salem Units 1 and 2 - Revise Definition of Fully Withdrawn | |
TAC:ME1339 | 30 April 2009 | ||
LR-N09-0232, WCAP-17071-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F). | 30 April 2009 | WCAP-17071-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F). | Hydrostatic Finite Element Analysis |
IR 05000272/2009002 | 29 April 2009 | IR 05000272-09-002, 05000311-09-00: on 01/01/09 - 03/31/09, Salem, Units 1 and 2, Routine Integrated Inspection Report | High Radiation Area Fire Barrier Internal Flooding Hydrostatic Temporary Modification Operability Determination Maintenance Rule Program Biofouling Unidentified leak |
LR-N09-0098, Report of Changes Tests and Experiments for Period May 1, 2007 Through May 1, 2009 | 28 April 2009 | Report of Changes Tests and Experiments for Period May 1, 2007 Through May 1, 2009 | Grab sample |
LR-N10-0355, Hope Creek, HC.OP-IO.ZZ-0005(Q), Rev. 30, Cold Shutdown to Refueling. | 25 April 2009 | Hope Creek, HC.OP-IO.ZZ-0005(Q), Rev. 30, Cold Shutdown to Refueling. | Reactor Vessel Water Level Time to boil Temporary Modification Foreign Material Exclusion |
ML110060144 | 25 April 2009 | Hope Creek, HC.OP-IO.ZZ-0005(Q), Rev. 30, Cold Shutdown to Refueling. | Reactor Vessel Water Level Time to boil Temporary Modification Foreign Material Exclusion |
LR-N10-0355, Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System | 25 April 2009 | Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System | |
ML110050501 | 25 April 2009 | Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System | |
LR-N09-0099, Hope Creek, and Salem, Units 1 and 2, Transmittal of 2008 Radioactive Effluent Release Report | 23 April 2009 | Hope Creek, and Salem, Units 1 and 2, Transmittal of 2008 Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML091240609 | 23 April 2009 | Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference | |
SCH09-049, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, NJPDES Permit NJ0005622 | 21 April 2009 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report, NJPDES Permit NJ0005622 | NJPDES |