ML091730278

From kanterella
Jump to navigation Jump to search
PSEG Drop-in Visit (Salem and Hope Creek) on 6-18-2009
ML091730278
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 06/22/2009
From: Arthur Burritt
Reactor Projects Branch 3
To: David Lew
Division Reactor Projects I
BURRITT, AL
References
Download: ML091730278 (2)


Text

June 22, 2009 MEMORANDUM TO: David C. Lew, Director Division of Reactor Projects FROM: Arthur L. Burritt, Chief /RA/

Projects Branch 3 Division of Reactor Projects

SUBJECT:

DROP-IN VISIT FROM PSEG (Salem and Hope Creek)

On June 18, 2009, Samuel Collins, Jim Clifford, Darrell Roberts, Art Burritt, Larry Doerflein and Dana Caron met with PSEGs Tom Joyce, President and Chief Nuclear Officer, Bob Braun, Vice President, Salem Station, John Perry, Hope Creek Plant Manager, Carl Fricker, Vice President Operations Support, and Christine Neely, Director Regulatory Affairs. The licensee requested this meeting to provide NRC senior regional management the status of activities at Salem and Hope Creek stations.

During the meeting, the following topics were discussed:

  • PSEGs Path to Nuclear Excellence Plan
  • Security Update
  • Hope Creek Performance Update
  • Salem Performance Update
  • License Renewal and New Nuclear Update The visit began at 2:00 p.m. and ended at 4:30 p.m. No regulatory decisions were requested or made and there were no commitments made for any follow-up actions on the part of Region I.

A meeting handout was provided by PSEG and is enclosed with this memorandum.

Enclosure:

As stated

2 June 22, 2009 MEMORANDUM TO: David C. Lew, Director Division of Reactor Projects FROM: Arthur L. Burritt, Chief /RA/

Projects Branch 3 Division of Reactor Projects

SUBJECT:

DROP-IN VISIT FROM PSEG (Salem and Hope Creek)

On June 18, 2009, Samuel Collins, Jim Clifford, Darrell Roberts, Art Burritt, Larry Doerflein and Dana Caron met with PSEGs Tom Joyce, President and Chief Nuclear Officer, Bob Braun, Vice President, Salem Station, John Perry, Hope Creek Plant Manager, Carl Fricker, Vice President Operations Support, and Christine Neely, Director Regulatory Affairs. The licensee requested this meeting to provide NRC senior regional management the status of activities at Salem and Hope Creek stations.

During the meeting, the following topics were discussed:

  • PSEGs Path to Nuclear Excellence Plan
  • Security Update
  • Hope Creek Performance Update
  • Salem Performance Update
  • License Renewal and New Nuclear Update The visit began at 2:00 p.m. and ended at 4:30 p.m. No regulatory decisions were requested or made and there were no commitments made for any follow-up actions on the part of Region I.

A meeting handout was provided by PSEG and is enclosed with this memorandum.

Distribution: via email S. Collins, RA B. Welling, DRP, SRI, Hope Creek M. Dapas, DRA D. Schroeder, DRP, SRI, Salem D. Lew, DRP A. Patel, RI, HC D. Roberts, DRS H. Balian, RI, Salem A. Burritt, DRP A. Turlin, DRP L. Cline, DRP R, Moore, DRP Memo: ML091730278 Slides: ML091700321 SUNSI REVIEW COMPLETE: ___ALB_____ (Reviewers Initials)

Non-Public Designation Category: MD 3.4 Non-Public __N/A__ (A.3-A.7 or B.1)

DOCUMENT NAME: G:\DRP\BRANCH3\BRIEFINGS & SITE VISITS\2009\DROP-IN VISIT BY PSEG 06182009.DOC After declaring this document an Official Agency Record, it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP NAME ABurritt/ ALB DATE 06/22/ 09 OFFICIAL RECORD COPY