Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09188042429 June 2009Relief Request Serial #09-MN-004License Renewal
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
ML09188042329 June 2009Relief Request Serial #09-MN-003Probabilistic Risk Assessment
IR 05000369/200900725 June 2009IR 05000369-09-007, 05000370-09-007, on 3/09 - 13/2009 and 3/23 - 27/2009, McGuire Nuclear Station, Units 1 & 2, Triennial Fire Protection InspectionSafe Shutdown
Fire Barrier
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Significance Determination Process
Time Critical Operator Action
Fire Protection Program
Fire Watch
Scaffolding
Manual Operator Action
ML09170032519 June 2009Initial Exam 2009-301 Final RO Written ExaminationPacking leak
ML09170031719 June 2009Initial Exam 2009-301 Final SRO Written ExaminationSafe Shutdown
Packing leak
Ultimate heat sink
Temporary Modification
Tornado Generated Missile
Safeguards Contingency Plan
Pressure Boundary Leakage
Continuous fire watch
Fire Watch
Hourly Fire Watch
Downpower
Unidentified leakage
Overspeed trip
Operational leakage
ML09162065218 June 2009(McGuire) - Public Letter for the Dam Safety and Operation Inspection Report
ML09177054916 June 2009Proposed Alternative Request No. 09-MN-005 Alternative Leakage Testing for Various ASME Code Class 1 Piping and ComponentsVT-2
Pressure Boundary Leakage
ML09177056316 June 2009Drawing MCFD-1562-03.01, Rev. 10, Flow Diagram of Safety Injection System (Ni). Attachment 2 Page 9 of 18
ML09177056216 June 2009Drawing MCFD-1562-03.00, Rev. 14, Flow Diagram of Safety Injection System (Ni). Attachment 2, Page 8 of 18
ML09177056116 June 2009Drawing MCFD-1562-02.01, Rev. 4, Flow Diagram of Safety Injection System (Ni). Attachment 2, Page 7 of 18
ML09177055916 June 2009Drawing MCFD-1562-02.00, Rev. 7, Flow Diagram of Safety Injection System (Ni). Attachment 2, Page 6 of 18
ML09177055816 June 2009Drawing MCFD-1562-01.00, Rev. 3, Flow Diagram of Safety Injection System (Ni). Attachment 2, Page 5 of 18
ML09177055716 June 2009Drawing MCFD-1561-01.00, Rev. 16, Flow Diagram of Residual Heat Removal (Nd). Attachment, 2 Page 4 of 18
ML09177055516 June 2009Drawing MCFD-1554-01.02, Rev. 11, Flow Diagram of Chemical and Volume Control System (Nv). Attachment 2, Page 3 of 18
ML09177055416 June 2009Drawing MCFD-1553-02.01, Rev. 7, Flow Diagram of Reactor Coolant System (Nc). Attachment 2, Page 2 of 18
ML09177055216 June 2009Drawing MCFD-1553-01.00, Rev. 8, Flow Diagram of Reactor Coolant System (Nc). Attachment 2, Page 1 of 18
ML0915901638 June 2009Notification of Inspection and Request for InformationHigh Radiation Area
Offsite Dose Calculation Manual
TAC:ME09493 June 2009
ML0912406403 June 2009Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA805Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
ML0915302272 June 2009March 04, 2009, Generic Fundamentals Examination Section Region II, Participant LetterGeneric Fundamentals Examination
ML09160045928 May 2009Independent Spent Fuel Storage Installation (ISFSI) - Registration of Cask Id No. 0FCTKN025
ML09170034328 May 2009Initial Exam 2009-301 Post Examination CommentsSafe Shutdown
Boric Acid
Shutdown Margin
ML09141028318 May 2009License Amendment Request to Revise the Definition of Shutdown Margin (SDM)Shutdown Margin
Anticipated operational occurrence
Fuel cladding
Power change
ML09147026415 May 2009License Amendment Request Applicable to Technical Specifications 3.8.4, DC Sources-Operating, and 3.8.5, DC Sources-Shutdown.Fuel cladding
Grace period
ML09114006613 May 2009Request for Relief 08-MN-003 for Reactor Vessel Hot Leg Nozzle to Safe End and Safe-End to Pipe Welds Examinations, TAC MD9614Incorporated by reference
Dissimilar Metal Weld
ML09141020213 May 2009Annual Radiological Environmental Operating Report for 2008 Calendar YearGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
ML09121054913 May 2009Request for Additional Information (RAI) Regarding Nuclear Energy Institute Topical Report Material Reliability Program (MRP) Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)Weld Overlay
Stress corrosion cracking
Dissimilar Metal Weld
ML09240062611 May 2009Initial Exam 2009-301 Final Administrative Documents Region Ii/Drs/Operator Licensing Branch/Initial Examinations/Mcguire/Exam 2009-301Boric Acid
Job Performance Measure
Continuous fire watch
ML09138009211 May 2009Technical Specification UpdateSafe Shutdown
Safeguards Contingency Plan
Fire Protection Program
ML0912803178 May 2009End of Cycle Public Meeting Summary
ML0912504935 May 2009Operator Licensing Written Examination Approval 05000369/09-301 and 05000370/09-301
ML0921706584 May 2009Submittal of Relief Request Serial No. 09-MN-002Weld Overlay
Coatings
Nondestructive Examination
Through-Wall Leakage
ML0914904864 May 2009Independent Spent Fuel Storage Installation (ISFSI) - Registration of Certificate of Compliance Number 1015
ML09131033330 April 2009Technical Specification Bases Changes, Tsb 3.3.3, Rev. 100 and Tsb 3.8.4, Rev 100Safe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Battery sizing
License Renewal
ML09128027629 April 2009Transmittal of Technical Specification and Technical Specification Bases Manual HoldersSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
License Renewal
Manual Operator Action
ML09128061028 April 20092008 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Press Release-II-09-028, NRC Schedules Open House to Answer Questions on 2008 Performance of McGuire Nuclear Power Plant27 April 2009Press Release-II-09-028: NRC Schedules Open House to Answer Questions on 2008 Performance of McGuire Nuclear Power PlantOpen House
IR 05000369/200900223 April 2009IR 05000369-09-002, IR 05000370-09-002, IR 07200038-09-001; 1/1/2009 - 3/31/2009; McGuire Nuclear Station, Units 1 and 2; Licensed Operator Requalification, OtherUltimate heat sink
Fire Barrier
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
TAC:MD964922 April 2009
ML09104001122 April 2009Withdrawal of an Amendment RequestWeld Overlay
ML09126055620 April 2009Request for Quality Assurance Program Approval for Radioactive Material Packages No. 0266
TAC:MD885816 April 2009
ML09105000816 April 2009Request for Relief 08-MN-001, for Third 10-year Inservice Inspection (ISI) Interval Program Plan Regarding Volumetric Examination Requirements for Welds 2 RPV-W08, 1PZR-10, 2PZR-10, 2PZR-12 and 2PZR-16Incorporated by reference
Thermal fatigue
ML0909606446 April 2009Notice of Meeting with Duke Power Company, LLC to Discuss NRC Reactor Oversight Process and the Annual Assessment of the McGuire Nuclear StationOpen House
ML0910301852 April 2009ISFSI, Registration Notification of Casks