ML09166013130 June 2009Request to Use an Assigned Protection Factor with French-Designed Air-Line Respirator EquipmentMururoa
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
ML09034001724 June 2009Safety Evaluation for Request to Use Weld Overlay Repairs as Alternative to ASME Code, Section XI Repair RequirementsNon-Destructive Examination
Weld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML09173012822 June 200905000321/366-2009-301 Final Simulator ScenariosSquib
Scram Discharge Volume
Power change
ML09173012622 June 200909-301 & 05000366-09-301 Final Administrative Documents - QA Sheets
ML09173015122 June 200905000321/366-2009-301 Draft Administrative-QA Sheets
ML09173015322 June 200905000321/366-2009-301 Draft RO ExamHigh Radiation Area
Half scram
IR 05000321/200930122 June 200909-301 & 05000366-09-301 Draft SRO ExamSafe Shutdown
Offsite Dose Calculation Manual
Temporary Modification
Unidentified leakage
ML09173017122 June 200905000321/366-2009-301 Draft Simulator ScenariosHalf scram
Squib
Scram Discharge Volume
Power change
ML09173017722 June 200905000321/366-2009-301 Draft Simulator/In-Plant JPMsShutdown Margin
High Radiation Area
Grab sample
Squib
ML09173012322 June 2009E. I. Hatch 05000321/366-2009-301 Draft Administrative DocumentsSafe Shutdown
High Radiation Area
Grab sample
Fire Watch
Scaffolding
ML0915504554 June 2009Notification of Licensed Operator Initial Examination 05000321/09-302 and 05000366/09-302
IR 05000321/20080094 June 2009EA-09-054 Edwin I. Hatch Nuclear Plant - Final Significance Determination of White Finding and Notice of Violation (IR 05000321-08-009 & 05000366-08-009)Mission time
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
ML0915200791 June 2009EN-09-024 - Issuance of Final Significance DeterminationMission time
Condition Adverse to Quality
Significance Determination Process
ML09148027028 May 2009NRC Operator License Examination Report 05000321-09-301 and 05000366-09-301
ML09147053327 May 2009E-Mail on Acceptance Review for Farley, Hatch, Vogtle Amendment on Deleting Working Hour Restrictions
ND-09-0825, Comment (6) of Charles R. Pierce on Behalf of Southern Nuclear Operating Company, Inc., on Draft Regulatory Guide DG-1218 Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants.22 May 2009Comment (6) of Charles R. Pierce on Behalf of Southern Nuclear Operating Company, Inc., on Draft Regulatory Guide DG-1218 Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants.Fire Protection Program
TAC:ME135119 May 2009
TAC:ME135319 May 2009
NL-09-0172, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 2619 May 2009License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26Incorporated by reference
ML10194021714 May 2009South Nuclear Plant E.I. Hatch - Actions for Potential Groundwater Contamination Events
NL-09-0746, Response to Request for Additional Information Regarding Fourth Interval Inservice Inspection Program14 May 2009Response to Request for Additional Information Regarding Fourth Interval Inservice Inspection Program
NL-09-0775, Annual Radiological Environmental Operating Reports for 200814 May 2009Annual Radiological Environmental Operating Reports for 2008Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radiological Environmental Operating Report
Chernobyl
ML10194021913 May 2009Email from Wade Loo to Adam Nielsen and Curtis Rapp; Cc: Brian Bonser, Phillip Niebaum and James Hickey; Subject: Followup on Hatch Tritium Detection
ML0909209434 May 2009Edwin I Hatch Nuclear Plant, Units 1 and 2 - Project Manager and Backup Reassignment
ML0917301394 May 200905000321/366-2009-301 Hatch Post-Exam Comments
ML0913202071 May 2009301 Final RO ExamHalf scram
Scram Discharge Volume
Fuel cladding
ML0913201981 May 2009301 Final SRO Exam (Part 1 of 2)
ML0913202041 May 2009301 Final SRO Exam (Part 2 of 2)Temporary Modification
Fuel cladding
IR 05000321/200900230 April 2009IR 05000321-09-002, 05000366-09-002, on March 31, 2009, Edwin I. Hatch Nuclear Plant - NRC Integrated Inspection ReportShutdown Margin
High Radiation Area
Non-Destructive Examination
Stroke time
Past operability
Locked High Radiation Area
Significance Determination Process
Process Control Program
EVT-1
Scaffolding
Substantial potential for overexposure
Overexposure
ML09126069127 April 2009Annual Radioactive Effluent Release Reports for 2008, Enclosure 4 Farley Offsite Dose Calculation Manual (ODCM) - Version 23 and Vogtle ODCM - Version 24Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML09126068927 April 2009Annual Radioactive Effluent Release Reports for 2008Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
NL-09-0661, Annual Radioactive Effluent Release Reports for 2008 - Cover Letter27 April 2009Annual Radioactive Effluent Release Reports for 2008 - Cover LetterOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ML09118002127 April 2009April Exam 05000321/2009301 & 05000366/2009301 Approval Letter 4-27-2009
NL-09-0577, GNF-Ziron Lead Test Assemblies24 April 2009GNF-Ziron Lead Test AssembliesExemption Request
Fuel cladding
ML09113061724 April 2009Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards ConsiderationsSafe Shutdown
Fitness for Duty
Shutdown Margin
Post Accident Monitoring
ML09070057223 April 2009Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, Denial of Request for Extension of Enforcement DiscretionSafe Shutdown
Enforcement Discretion
Operator Manual Action
Exemption Request
Fire Protection Program
NL-09-0378, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Annual Non-Radiological Environmental Operating Report for 200822 April 2009Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Annual Non-Radiological Environmental Operating Report for 2008
ML09106073216 April 2009Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08Aging Management
Open House
ML09034046515 April 2009Issuance of Amendments Regarding Ventilation Filter TestingFire Protection Program
NL-09-0503, Response to Preliminary White Finding on 1B EDG Coupling Failure15 April 2009Response to Preliminary White Finding on 1B EDG Coupling FailureMission time
Probabilistic Risk Assessment
Finite Element Analysis
Significance Determination Process
Preliminary White Finding
ML0917301347 April 200905000321/366-2009-301 Final Simulator/In-Plant JPMsHigh Radiation Area
Grab sample
Post Accident Monitoring
Squib
Scram Discharge Volume
ML0917301366 April 200905000321/366-2009-301 Final Administrative JPMsSafe Shutdown
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Functionality Assessment
Double blade guide
Scaffolding