MONTHYEARML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) ML21354A5942021-12-20020 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-227 and TSTF-297 LAR (L-2021-LLA-0227) ML21347A8532021-12-13013 December 2021 NRR E-mail Capture - Required: Hatch TSTF-505 LAR - Audit Plan - Additional Documents to Be Uploaded to the Portal ML21347A9002021-12-13013 December 2021 NRR E-mail Capture - Updated Request: Additional Request for SNC to Place Document on the Portal ML21363A0872021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Question - Hatch - Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature (L-2021-LLA-0188) ML21321A3812021-11-16016 November 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-505 LAR (L-2021-LLA-0199) ML21306A3272021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review - Hatch Eliminate Ms Line Isolation on High Turbine Building Area Temperature LAR (L-2021-LLA-0188) ML21292A1562021-10-19019 October 2021 NRR E-mail Capture - Acceptance Review - SNC Operating Fleet TSTF-554 LAR ML21265A3402021-09-22022 September 2021 NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR ML21253A1992021-09-10010 September 2021 NRR E-mail Capture - Clarification Call Summary - Hatch Pre-Submittal Meeting TSTF-505 LAR ML21174A1182021-06-23023 June 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet - Remove Table of Contents LAR (L-2021-LLA-0115) ML21132A0132021-05-11011 May 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet QATR Reduction in Commitment Licensing Action - L-2021-LLQ-0002 ML21111A3032021-04-21021 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21110A6842021-04-20020 April 2021 NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) ML21105A0132021-04-14014 April 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet LAR to Change TS 5.7, High Radiation Area (L-2021-LLA-0052) ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20318A0212020-11-12012 November 2020 NRR E-mail Capture - Fyi - Acceptance Review - SNC Fleet TSTF-541 LAR (L-2020-LLA-0232) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20258A0272020-09-11011 September 2020 Acceptance Review - Hatch TSTF-582 LAR (EPID L-2020-LLA-0194) (e-mail) 2024-01-09
[Table view] |
Text
Pressley, Lundy From: Wade Loo ZZ--
Sent: Wednesday, May 13, 2009 10:10 AM To: Adam Nielsen; Curtis Rapp Cc: Brian Bonser; Phillip Niebaum; James Hickey
Subject:
RE: Followup on Hatch tritium detection FYI, I just got off the phone with Violet Coleman, Chemistry Manager, at Hatch. Got an update on the tritium that was detected. She said that the groundwater monitoring well, T3, was sampled during routine sampling and came back with -33K. They resampled it and it came back as -34K. This is much higher than in past samplings, They are now sampling the wells in the surrounding area and awaiting those results from the lab.
T3 is located between the Turbine building and the recombiner building. This is the area where they have had historical issues back to the 80s regarding an uncapped offgas line. This is an area where they knew they had issues and put more wells in this area for increased sampling. She said that they have had more rainwater than the past several years and the water table is higher. They suspect that this is the reason for the increased activity due to the water table being higher. Once they get the sample results from the other wells in the area they will continue their investigation into this matter. I asked her to call Adam when she finds out what is going on and what they plan to do next. Any questions please let me know. Thanks.
From: Wade Loo Sent: Tuesday, May 12, 2009 11:04 AM To: Adam Nielsen Cc: Brian Bonser; Curtis Rapp
Subject:
RE: Followup on Hatch tritium detection Thanks a bunch! Just let us know if you find anything newsworthy that we should know before you come back next week.
From: Adam Nielsen Sent: Tuesday, May 12, 2009 10:59 AM To: Wade Loo Cc: Brian Bonser; Curtis Rapp
Subject:
Followup on Hatch tritium detection I will followup with a phone call to the Chemistry Supervisor, as time permits. I am at St. Lucie this week.
I believe monitoring well T3 has shown detectable tritium levels in the past. In case anybody asks, the groundwater moves slowly toward the Altamaha river (the normal discharge point). Groundwater is monitored through a series of subsurface drains and composite samplers as it discharges to the river. This is all in addition to the extensive monitoring well program. Hatch still has significant onsite subsurface tritium contamination (mostly from historical CST leaks). Last I checked, nothing above background had been detected offsite.
Adam