MONTHYEARNL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0240, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0237, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0166, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0157, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0144, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update 2024-09-09
[Table view] |
Text
Southern Nuclear Operating Company, Inc, 1e* 205992 500(
SOUTHERN'\
COMPANY April 24, 2009 Ellergr to St'rt't' lour World' Docket No.: 50-366 NL-09-0577 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 2 GNF-Ziron Lead Test Assemblies Ladies and Gentlemen:
This letter provides an information report describing the two (2) GE14 bundles with GNF-Ziron fuel cladding contained in lead test assemblies (LTAs) loaded into the Plant Hatch-Unit 2 core during the twentieth refueling outage (2R20). Also enclosed in this report is information related to the applicability of NRC-approved methods used to analyze the assemblies, the objective of the lead test assembly program, and measurements to be performed as part of the test program.
This letter contains no NRC commitments. If additional information is required, please contact R. D. Baker at 205-992-7367.
Sincerely,
~0~
M. J. Ajluni Manager, Nuclear Licensing MJAlPAH/daj
Enclosure:
Information Report Description of Lead Test Assemblies cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. J. A. Hickey, Senior Resident Inspector - Hatch
Edwin I. Hatch Nuclear Plant - Unit 2 GNF-Ziron Lead Test Assemblies Enclosure Information Report Description of Lead Test Assemblies
Enclosure Plant Hatch GNF-Ziron LTAs Information Report Description of Lead Test Assemblies Two lead test assemblies (LTAs), with selected fuel rods (~30 rod in each assembly) fabricated from GNF-Ziron cladding material, will be loaded into Plant Hatch Unit 2 during reload 20 for Cycle 21, with planned operation through Cycles 22 and 23. The LTAs also incorporate water rods manufactured from GNF-Ziron material. These GNF-supplied fuel assemblies are standard GE14 fuel assemblies with the exception of the cladding material and water rod material. GNF-Ziron is a zirconium-based alloy with composition very similar to the industry standard Zircaloy-2 but with increased iron content. The dimensions and processing of all assembly components are identical to the standard GE14 assemblies.
GE14 fuel is licensed according to criteria and requirements specified in GESTAR II (General Electric Standard Application For Reactor Fuel, NEDE-24011-P-A), as reported in the GE14 compliance report (GE14 Compliance With Amendment 22 of NEDE- 24011-P-A, NEDC-32868P, Rev. 2). The GE14 compliance report states that the GE14 fuel cladding and water rods are made of Zircaloy-2.
Because the composition of GNF-Ziron falls outside of the ASTM-specification ranges for Zircaloy-2, the current GE14 compliance report does not cover the use of GNF-Ziron for reload applications. Specific approval from the NRC on the use of GNF-Ziron as cladding material is therefore required before the alloy can be deployed in reload quantities; in addition, an amendment to the GE14 compliance report will be needed. GNF is in the process of preparing a Licensing Topical Report to seek NRC approval for the use of GNF-Ziron as cladding material. In the absence of specific approval from the NRC, Reference 1 discusses how LTAs could be loaded provided LTAs are analyzed with approved methods.
Accordingly, the two GE14 GNF-Ziron LTAs are being loaded into Plant Hatch Unit 2 per provisions in 10 CFR Part 50, Section 50.59. However, 10 CFR Part 50, Section 50.46 and Appendix K specifically address cladding material made from Zircaloy or Zirlo. As GNF-Ziron is not a Zircaloy, an exemption to the requirements of 10 CFR Part 50, Section 50.46 and Appendix K was submitted to the NRC (Reference 2). A more detailed description of GNF-Ziron is given in Reference 3, which forms one of the attachments in the exemption request (Reference 2).
Applicability of GESTAR-II Methods and Exemptions From Requirements of 10 CFR Part 50, Section 50.46 and Appendix K The key properties of GNF-Ziron are described in Reference 4. A discussion on the applicability of approved methods to GNF-Ziron cladding is given in Reference 3. In particular, the impact of GNF-Ziron on thermal-mechanical evaluations is given in Reference 5, with the conclusion that GNF-Ziron behavior can be adequately modeled by the existing GNF methods; hence, no impact on thermal-mechanical licensing limits is expected. The application of selected GNF-Ziron fuel rods in the two GE14 LTAs is therefore consistent with As long as the analysis of the LTAs using approved methods meets the approved criteria, it would be concluded that no unreviewed safety question exists as discussed in Reference 1.
Page 1 of 2
Enclosure Plant Hatch GNF-Ziron LTAs Information Report Description of Lead Test Assemblies In support of the Reference 2 application for exemption from 10 CFR Part 50, Section 50.46 and Appendix K requirements to use zircaloy fuel cladding, information on the high temperature oxidation behavior of GNF-Ziron pertaining to postulated loss-of coolant accident (LOCA) considerations is provided in Reference 3. The exemption request was approved by the NRC on Nov 7, 2008 (Reference 6).
Objective of LTA Program The objective of the LTA program at Plant Hatch is to obtain operational experience with GNF-Ziron. The performance of GNF-Ziron under normal operating conditions is expected to be similar to that of Zircaloy-2. The LTA program will provide confirmation on the GNF-Ziron performance.
Outline of Measurements Since obtaining operational experience with GNF-Ziron is the objective of the Hatch LTA program, poolside inspections (e.g., visual, eddy current liftoff, and profilometry) will be conducted on selected rods.
References
- 1. NRC Letter, Lead Test Assembly Licensing, T. A. Ippolito (NRC) to R. E.
Engel, September 23, 1981.
- 2. SNC Letter to NRC, Edwin I. Hatch Nuclear Plant - Unit 2 Submittal of Additional Information to Support Proposed Exemption to 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow Ziron Fuel Cladding, September 22, 2008, ML082681156.
- 3. Technical Basis Supporting GNF-Ziron Lead Test Assembly Introduction into the Hatch Nuclear Plant in License support letter for GNF-Ziron LTA at Hatch, eDRFsection 0000-0079-7396, Rev. 4, as attachment in Reference 2.
- 4. Properties of GNF-Ziron in Proprietary and Non-Proprietary versions of GNF-Ziron Properties and TM Assessment, eDRFsection 0000-0087-8749, Rev. 2, ML082250038.
- 5. Impact of GNF-Ziron Cladding on Thermal-Mechanical Licensing Limits in Proprietary and Non-Proprietary versions of GNF-Ziron Properties and TM Assessment, eDRFsection 0000-0087-8749, Rev. 2., ML082250037.
- 6. NRC Letter, Edwin I. Hatch Nuclear Plant, Unit No 2- Exemptions from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K (TAC No.
MD8356), R. E. Martin to D. H. Jones, November 7, 2008, ML082950149.
Page 2 of 2