05000321/366-2009-301 Final Simulator/In-Plant JPMs
ML091730134
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/07/2009
From:
NRC/RGN-II
To:
Southern Nuclear Operating Co
References
50-321/09-301, 50-366/09-301, LR-JP-25034-06 50-321/09-301, 50-366/09-301
Download: ML091730134 (100)


Text

NIR FINAL 04/07/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIMl Energy to Serve Your World SM

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH "FORM TITLE: TRAINING MATERIAL REVISION SHEET Page 1 of 1 ProgramlCourse Code:

OPERATIONS TRAINING Media Number:

LR-JP-25038 00 01/18/00 Initial development RAB DHG 01 I 11106100 I Include objective number RAB DHG 02 I 12/27/01 I Corrected IRM scale ranging values to match BKW DHG procedure.

0"

.J 03/25/02 Include initial operator statement RAB RAB 04 06/27/05 Revised Initial License statement for successful RAB RAB completion 05 07/25/06 Remove Response Cues RAB 06 04/07/09 Update for NRC exam for HLT 4. Requires CME CME withdrawing SRMs in addition to IR.M overlap checks

)11----+----+-----------------\\------\\----1

LR-JP-25038-06 Page 1 of8 UNIT 1 ()

UNIT 2 (X)

VERIFY THE CORRECT OVERLAP BETWEEN IRM RANGES 6 AND 7 (STOP POWER ASCENSION)

LR-JP-25038-06 This task will be complete when the operator has successfully verified IRM overlap between Ranges 6 and 7 and has determined that overlap for two IRMs is unacceptable, per 34GO-OPS-001-2, "Plant Startup," and power ascension must stop.

012.010 012.01O.B PLANT HATCH JTA IMPORTANCE RATING:

RO 3.40 SRO 3.07 KIA CATALOG NUMBER:

215003A407 KIA CATALOG JTA IMPORTANCE RATING:

RO 3.60 SRO 3.60 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

APPROXIMATE COMPLETION TIME:

20 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

)

LR-JP-25038-06 Page 2 of8 SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to IC #103 or other startup Ie and leave in FREEZE.

2.

Make sure RECORDER POWER is TURNED ON. Roll Chart Recorders and Process Computer Typers forward. Ensure any information printed on the Process Computer Typer from previous ICs is removed.

3.

INSERT the following MALFUNCTIONS:

.*.*..... ~~(2fJ" ** ;c...

TIME*

mfC51 8F I IRM F Failure (Downscale) 00000 mfC51 155C I IRM C Range 7 Fails High By a Factor of2 00000 mfC51 155B I IRM B Range 7 Fails High By a Factor of2 00000

4.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Bypass IRM "F."

B.

Pull control rods until all IRMs are on Ranges 3, Range 4 and/or Range 5 and with a Reactor period of about 200 seconds.

C.

While pulling control rods, don't forget to increase Dump Flow and close Head Vents, if required.

D.

Withdraw SRMs to approximately the minimum count rate of200 cps, but still partially inserted.

E.

Place simulator in freeze and take a snapshot when IRMs are on Ranges 3, Range 4 and/or Range 5. USE THIS SNAP for the first attempt at gathering data.

F.

Place the Simulator back in "RUN" and Range the IRMs until the highest reading IRM is just placed to Range 6.

G.

Place the Simulator in freeze and take a snapshot with a different Snap # than the first Snapshot. USE THIS SNAP as a CONTINGENCY scenario in case the overlap data is missed on the first attempt. This will simulate the NPO inserting rods, down ranging IRMs and then re-establishing a positive period. This Snap will ONLY be used as directed by the Examiner.

5.

Complete a markup of 34GO-OPS-00 1-2 up to and including step 7.2.20. Also, have two copies of available for the candidate (other attachments are not required), but only hand out one copy. The second copy is ONLY in case the Contingency Scenario is required to be Run.

6.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

7.

ESTIMATED Simulator SETUP TIME:

30 Minutes NOTE: While the operator is performing this JPM, it may be necessary to withdraw more control rods to maintain a positive period. This should be done until all IRMs are on Range 7 or above.

UNIT 2 READ AND GIVE A COpy TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is in Startup, with 34GO-OPS-001-2 (Plant Startup) in progress.
2. All plant equipment is in normal line-up for this condition. IRM "F" failed downscale last shift. It has been bypassed and I & C is investigating.
3. Each Intermediate Range Monitor (IRM) is on Ranges 3, Range 4 or Range 5..
4. 34GO-OPS-001-2, Plant Startup, has been completed thru Step 7.2.20.
5. Source Range Monitors (SRMs) have been partially withdrawn.
6. Reactor Period is approximately 200 seconds, with a Nuclear Plant Operator (NPO) performing required rod movement per 34GO-OPS-065-O.
7. A second operator is monitoring the remainder of the Control Room Panels, including Feedwater Control.

INITIATING CUES:

Gather the data for Attachment 9, "IRM Overlap Check," by completing Steps 7.2.21 through 7.2.25 of 34GO-OPS-00 1-2, Plant Startup.

Range IRMs and Withdraw SRMs as necessary

For INITIAL Operator Programs:

LR-JP-25038-06 Page 4 of8 For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

START TIME: ___ _

PROMPT:

AS the Shift Supervisor, INFORM the operator that another operator is monitoring the remainder of the Control Room Panels, including Feedwater Control.

NOTE: The Simulator operator, as a NPO, may be required to withdraw Control Rods to maintain Reactor Period, due to the negative reactivity addition encountered at the Point of Adding Heat, such that all IRMs will go to Range 7 or above.

PROMPT:

INFORM the operator that a NPO will perform any required rod movement to maintain the Reactor critical.

1. Operator OBTAINS the correct Operator has OBTAINED a copy SAT IUNSAT procedure and LOCATES the correct of34GO-OPS-OOl-2 and has step.

LOCATED Step 7.2.22.

PROMPT:

WHEN operator addresses 34GO-OPS-OOl-2, PROVIDE the operator with the previously marked-up version of 34GO-OPS-OOl-2 and a blank.

NOTE: The critical part of Step 2 will be satisfied if the operator ranges the IRMs in such a manner that no half-scrams or full scrams are received.

(*

  • Indicates critical step)

Operator has RANGED IRMs to maintain IRM indications between 10 and 80 on the recorder 0 - 125 scale (black scale).

SAT/UNSAT

3.

LR-JP-25038-06 Page 5 of8 NOTE: If the candidate allows a SRM count rate to increase above 7X1Q4 cps, the "SRM UPSCALE or INOPERATIVE" (603-204) alarm will annunciate. The candidate will inform the Shift Supervisor of the alarm and then withdraw SRMs to lower the count rate below the alarm setpoint.

Operator fully withdraws SRMs Operator fully withdraws SRMs when all IRMs are above Range 3 and prior to Range 7.

PROMPT:

If on the first attempt to gather overlap data, the operator does NOT gather all required data prior to the IRMs being on Range 7 (missed the R6 to R7 data check), ask the operator what he would do to get the data. If the response is to insert control rods to decrease power back below Range 7 so that overlap can be verified, then remove the operator from the 2Hll-P603 panel area and tell him that the NPO will insert control rods so that the IRMs are back below Range 7 and a positive period re-established.

$~A TOR OPERA TOR, at the Examiner's direction, RESET the Simulator to the t9CONTINGENCY snap so that the IRMs are back below Range 7 and a positive period is re-established. Provide another blank Attachment 9, "IRM Overlap Check," to the candidate to allow another attempt at gathering the overlap data.

PROMPT:

NOTE:

Operator has RANGED each IRM from Range 6 to Range 7 and has LOGGED Range 6 and Range 7 readings in Column 3 and Column 4, respectively, of of 34GO-OPS-OOl-

2.

SAT/UNSAT As the SS, NOTIFY the operator that another operator will monitor the IRMs while Attachment 9 is completed.

Simulator operator - Once the Candidate has turned over to another NPO and at Examiner's direction, place the simulator in Freeze.

Operator has DIVIDED Range 6 (Column 2) readings by 10 and has ENTERED the RESULTS in Column 4 of Attachment 9 of 34GO-OPS-OO 1-2.

SAT IUNSAT

(*

  • Indicates critical step)

)

LR-JP-25038-06 Page 6 of8 PROMPT:

IF addressed, as a second operator, PERFORM verification of Column 5 of.

Operator checks that Column 3 equals Column 4 +/-2 (on the red scale, Column 3) and has DETERMINED:

that IRM "B" is NOT ACCEPTABLE (> +/-2).

.. that I.RJIv1 "c" is NOT ACCEPTABLE (> +/-2).

SAT/UNSAT SAT IUNSAT PROMPT:

IF addressed, as a second operator, PERFORM calculation verification.

NOTE: The operator may have the Shift Supervisor notifY the I & C Shop.

7. Operator RECORDS the unacceptable Operator has RECORDED the SAT I UNSAT overlap for IRM "B" and "c" in the unacceptable overlap for IRM Operator's log and notifies the Shift "B" and "C" in the Operator's log Supervisor of the unacceptable and notifies the Shift Supervisor overlap for IRM "B" and "C".

of the unacceptable overlap for IRM "B" and "C."

(** Indicates critical step)

Operator NOTIFIES the SS that per the Note of Attachment 9, power accession cannot continue with less than three IRM channels in each RPS trip system.

LR-JP-25038-06 Page 7 of8 SAT I UNSAT PROMPT:

AS the Shift Supervisor, INFORM the operator that another operator will maintain current power while the condition of the IRMs is being evaluated.

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(** Indicates critical step)

END TIME: ___ _

ATTACHMENT 1 (EXCERPT FROM 34GO-OPS-001 ATTACHMENT 9)

TITLE:

IRM OVERLAP CHECK 1.0 Confirm that there is overlap between IRM ranges 6 and 7 is acceptable as follows:

1.1 Record readings from range 6 for each IRM channel.

1.2 Record readings from range 7 for each IRM channel.

1.3 Divide Range 6 readings (COLUMN 2) by 10 and enter in Column 4.

COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 COLUMN 5 IRM RANGE 6 RANGE 7 (COLUMN 2)/

SIGN-OFF CHANNEL READING READING 10 (Black (Red INITIALS VERIFIED Scale)

Scale)

A B

C D

E F

G H

1.4 Confirm that Column 3 = Column 4 +/- 2 (on the red scale).

1.5 Initial and verify the calculations.

NOTE Acceptable overlap must be obtained on three IRM channels in each RPS Trip System to continue power ascension (LIC OPER)

INITIALS VERIFY Page 80f8

)

NIR FINAL 04/06/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training ALTERNATEPATHJPM 81M2 Energy to Serve Your World SM

\\ SOUTHERN NUCLEAR OPERATING COMPANY

. "PLANT E. I. HATCH

)

FORM TITLE: TRAINING MATERIAL REVISION SHEET Page 1 of 1 Program/Course Code:

OPERATIONS TRAINING Media Number:

LR-JP-13.047-00 Cf~~Yt~~~~i\\\\: ~//~~f~); !'>\\}i'i;~JE2~~E~:'2;;"~/:t>'i;;;t!;~;c;iy~

1**.:AJit::"'*'~R /.r;...C.... *.*....

  • 1.*Ci~*i,iHa~I I***jf:£~l~*c;.

]~I,~y~. Ii, *. ~;'\\*<.*.......... **.* *. *.;..,*.. *.*.. ***.*i *.. **..* ; **** *<~"r... *.*... *\\*.i*.\\\\i............,

\\.cl'\\l~1 I.

)

UNIT 1 ()

UNIT 2 (X)

SHUT DOWN COOLING ISOLATION LR-JP-13.047-00 The task shall be completed when "B" loop of RHR valves 2E11-F008, F009, and F015B are closed.

013.047

'~~Biiie;~'JVij{'NijiVIJtE)l.! 013.047 A ALTERNATE PATH PLANT HATCH JTA IMPORTANCE RATING:

RO 3.76 SRO N/A KIA CATALOG NUMBER: 223002 K1.08

) KIA CATALOG JTA IMPORTANCE RATING:

RO 3.4 SRO 3.5 OPERA TOR APPLICABILITY:

Nuclear Plant Operator (NPO) 34S0-E11-007-2, RHR System Operating Procedure 34AB-C71-001-2, SCRAM PROCEDURE NMP-OS-007, CONDUCT OF OPERATIONS APPROXIMATE COMPLETION TIME:

15 Minutes

) SIMULATOR SETUP:

Refer to simulator setup sheet on the following page Page 10f5

Page 2 of5 SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to an IC 101, or other IC with "B" SDC in service, and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS:

3.

INSERT the following SIMULATOR VALUE OVERRIDES:

svoB21009 LT-N080A RPS LEVEL 3 SCRAM 37 STO SvoB2 10 10 LT-N080B RPS LEVEL 3 SCRAM 37 STO SvoB21011 LT -N080C RPS LEVEL 3 SCRAM 37 STO SvoB31012 LT -N080D RPS LEVEL 3 SCRAM 37 STO ll-F009 RHR Shutdown Cooling Suction Valve OPEN

4.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

TURN OFF SPDS (or it will be misleading)

USE 2Ell-F040 and F049 to lower RWL to 1-3.

5.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

6.

ESTIMATED Simulator SETUP TIME:

10 Minutes

)

UNIT 2 READ AND GIVE A COpy TO THE OPERATOR INITIAL CONDITIONS:

1.

The Unit is being shutdown to cold shutdown.

2.

"B" loop of RHR is in Shutdown Cooling with the "B" heat exchanger inlet partially open and the heat exchanger bypass valve fully open.

3.

Unit 2 RWL has decreased below +3".

3.

The CBO will handle RC-1, RC-2, and RC-3.

INITIATING CUES:

Verify the proper response of the RHR system to the lowering level per 34AB-C71-00 1-2.

'I For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

Page 4 of5 NOTE: Action to close isolation valves is required perNMP-OS-007, "Conduct of Operations", step 5.9.3.3 and 5.10.3.3 "Initiate Engineered Safety Systems actuation if indications exceed automatic actuation setpoints and an actuation has not occurred".

1. I Operator obtains the procedure needed I Operator has obtained procedure to perform the task.

34AB-C71-001-2, Attachment 1.

2. I Stop or verify stopped RHR 2B pump. I On panel 2E I1-H60 1 :
3. I Verifies 2EII-F015B has closed lAW Group 2 Isolation requirements of attachment 1.
5. I Verifies 2EII-F015B closed.
6. I Verifies 2EII-F008 has closed IA W Group 6 Isolation requirements of attachment 1.
  • Places 2E 11-C002B control switch to STOP OR
  • After 2EU-F008 or 2Ell-F009 is closed, verifies RHR 2B pump is stopped with pump red light extinguished and green light illuminated.

On pane12H11-P601, Observes 2E 11-FO 15B has a red (open) light illuminated.

On panel 2E 11-H60 1, places 2E 11-FO 15B control switch to On pane12HII-P601, Observes the gTeen light is illuminated and the red light is extinguished for 2EI-F015B.

On panel 2HI1-P601, Observes 2Ell-F008 has a red (open) light illuminated.

START TIME: ___

SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT I UNSAT SAT IUNSAT SAT/UNSAT

8. I Verifies 2E11-F008 closed.
9. I Verifies 2E II-F009 has closed IA \\V Group 6 Isolation requirements of attachment 1.
10. I Closes 2EU-F009.
11. I Verifies 2E II-F009 closed.

On pane12E11-H601, places 2EII-F008 control switch to close and allows it to spring return to mid position.

On pane12HII-P601, Observes the green light is illuminated and the red light is extinguished for 2EI-FOOS.

On panel2HII-P602, Observes 2E 11-FOOS has a red (open) light illuminated.

On pane12EII-H602, places 2E 11-F009 control switch to close and allows it to spring return to mid position.

On pane12HII-P602, observes the valve has remained OPEN with the green light extinguished and the red light illuminated for 2EI-F009.

Operator notifies Shift Supervisor that:

.. 2E 11-F009 did not auto close

  • 2EU-F009 did not manually close Page 5 of5 SAT IUNSAT SAT I UNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT IUNSAT PROMPT:

IF operator just informs the Shift Supervisor that there were failures, THEN ask the operator to specifically state what failed and how it failed.

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: That completes this lPM.

END TIME: ___ _

NlR FINAL 04/06/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM3

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH

\\

/FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

00 02/01/00 Initial development 01 11106/00 Include objective number Changed referenced procedure used for manual start from the Control 02 12/27/01 I Room, from the "Monthly" surveillance to the "Semi-Annual" surveillance. Deleted reference to anmmciator "Governor Not At Sync Speed Setting," alarm has been deleted.

03 03/25/02 I Include initial Operator statement 04 06/27/05 Revised Initial License statement for successful completion 05 06/30/06 Remove Response Cues 06 10114/08 I Removed step to conform to procedme.

Page 1 of 1 LR-JP-25034 RAB DHG Rft.B DHG BKW DBG RAB RAB RAB RAB JWP RAB

)

LR-JP-25034-06 Page 1 of9 UNIT 1 ()

UNIT 2 (X)

PERFORM A DIESEL GENERATOR MANUAL START SURVEILLANCE (TRIP FAILURE)

LR-JP-25034-06 The task shall be completed when the Operator has tied the "2A" Diesel Generator to the "2E" 4160 VAC Bus per 34SV-R43-004-2. Then following a failure to auto trip, shutdown the Diesel Generator.

028.016

\\QjJlD;G~t~E/NUM-a:tRf 028.016.0 PLANT HATCH JTA IMPORTANCE RATING:

RO 3.22 SRO 2.93

) KIA CATALOG NUMBER: 264000A404 KIA CATALOG JTA IMPORTANCE RATING:

RO 3.70 SRO 3.70 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO) 34SV-R43-004-2 (current version) 34AR-652-111-2 (current version) 34AR-652-129-2 (current version) 34SV-R43-004-2 (culTent version) 34AR-652-111-2 (culTent version) 34AR-652-129-2 (current version)

Stopwatch

') APPROXIMATE COMPLETION TIME:

20 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to IC #113, or other full power Ie.

2.

INSERT the following MALFUNCTIONS:

mf652 1 1665 mf65211683 Spur Ann - LUBE OIL PRESS LOW Spur Ann - EMERGENCY ENGINE SHUTDOWN

3.

INSERT the following REMOTE FUNCTIONS:

4. PLACE the Diesel Gen 2A Mode Select switch in the TEST position.
5. ENSURE a stop watch is available (test it to verifY it works).
6. PLACE the simulator in FREEZE.
7.

ESTIMATED Simulator SETUP TIME:

10 Minutes NOTE LR-JP-25034-06 Page 2 of9

  • The simulator operator needs to consult with the examiner about when to call about the leaking oil line (see prompt above step # 24)

To monitor Diesel Generator "A" engine speed, governor setting, frequency, perform the following steps at the instructor station.

1. Click on any screen, off of any list.
2. Type ALT-P.
3. Select OPEN TABLE
4. Select DG SPEED VOLT REG SP.TBI
5. Select OPEN

)

UNIT 2 READ AND GIVE A COPY TO THE OPERA TOR INITIAL CONDITIONS:

1. Diesel Generator "2A" is ready to be run for its semi-annual manual start per 34SV -R43-004-2. The procedure is complete up to and including step 7.2.2.7.
2. No other testing or maintenance is in progress.
3. A SO is standing by at the Diesel Generator.

INITIATING CUES:

Starting at step 7.2.2.8, perform the Diesel Generator 2A Semi-Annual Test per 34SV-R43-004-2. 1ST is not being performed.

/'

)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

LR-JP-25034-06 Page 4 of9 PROMPT:

WHEN the Operator is ready to begin, give him a stopwatch and a copy of 34SV-R43-004-2 which is completed up to and including step 7.2.2.7.

1.
2.
3.

NOTE: The prelube pump may be started from the Main Control Room.

However, standard practice is to contact the SO at the Diesel and have that Operator prelube the DieseL START TIME: ___ _

Operator reviews the procedure.

Operator reviews precautions, SAT/UNSAT limitations and completed steps.

Take the Diesel 2A Prelube Pump to Contacting the SO at the Diesel SAT I UNSAT ON.

Generator 2A Room, the Operator CONFIRMS that the Diesel 2A PRELUBE PUMP to ON, red light illuminated.


.. ----~--~

PROMPT:

WHEN the Operator contacts the SO, THEN inform the operator that the pre lube pump is running.

PROMPT:

AFTER the Operator if informed of the prelube pump, THEN inform that, using time compression, 3 minutes have elapsed.

Select Diesel Generator 2A Voltmeter At paneI2HII-P652, the SAT I UNSAT for monitoring phase voltage during Operator SELECTS Diesel the startup.

Generator 2A Voltmeter, 2R43-R904, using the voltmeter select switch.

NOTE: For the following step, starting the Diesel is the critical portion ofthis step.

PROMPT:

IF the Operator requests a second operator with a stopwatch, THEN inform the operator that another operator is taking the time with another stopwatch.

(*

  • Indicates critical step)
5. I Record the time the diesel starts and comes up to synchronous speed and confirm that the time is less than or equal to 12 seconds.
6. I Confirm that the average diesel generator output voltage is between 3740 V and 4240 V AND that diesel generator frequency is between and 61 Hz.
7. I Confirm that the Diesel Generator 2A CooHngWater Outlet AOV, 2P41-F339A is OPEN.
8. I Confirm that the Diesel Gen 2A Auto Start Sys Operative clear light is EXTINGUISHED.
9. I Confirm that the Diesel Gen 2A Start red light is ILLUMINATED.
10. I Confirm Diesel Gen 2A Shutdown System Operative light is ILLUMINATED

(** Indicates critical step)

At pane12HII-P652, the TAKES the Diesel Gen 2A START switch to the START position.

When the Diesel Generator 2A reaches synchronous speed

(~3800 volts and (~59 hertz).

At panel 2HII-P652, the Operator RECORDS the time the diesel starts and comes up to synchronous speed and CONFIRMS that the time is less than or equal to 12 seconds.

At pane12HII-P652, the Operator CONFIRMS that the average diesel generator output voltage is between 3740 V and 4240 V AND that diesel generator frequency is between 59 and 61 Hz.

Contacting the SO at the Diesel Generator 2A Room, the Operator CONFIRMS that the Diesel Generator 2A COOLING WATER OUTLET AOV, 2P41-F339A, is OPEN.

At pane12HII-P652, the Operator CONFIRMS that the Diesel Gen 2A AUTO START SYS OPERATIVE clear light is EXTINGUISHED.

At panel 2HII-P652, the Operator CONFIRMS that Diesel Gen Start red light is ILLUMINATED.

At panel 2HII-P652, the Operator CONFIRMS that the Diesel Gen 2A SHUTDOWN SYSTEM OPERi\\ TIVE light is ILLUMINA TED LR-JP-25034-06 Page 5 of9 SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT I UNSAT SAT I lJNSAT SAT IUNSAT SAT/UNSAT

)

LR-JP-25034-06 Page 6 of9 NOTE: The simulator Operator, when contacted by the Operator, will TOGGLE REMOTE FUNCTION rfR43294, "DG 2A Engine Remote Speed Droop (0 to 100), to change the speed droop for the following step.

13. I Confinn that the Diesel Gen 2A Voltage Reg Transfer Auto red light is EXTINGUISHED.
14. I Confinn that the Diesel Gen 2A Voltage Reg Transfer Manual green light is ILLUMINATED.

Contacting the SO at the Diesel Generator 2A Room, at the Diesel Generator 2A Woodward Governor Control, the Operator has the SPEED DROOP control knob PLACED to "50".

At panel 2HII-P652, the Operator PLACES the Diesel Gen 2A VOLTAGE REG TRANSFER switch in MANUAL, green light illuminated.

At panel 2HII-P652, the Operator CONFIRMS that the Diesel Gen 2A VOLTAGE REG TRANSFER AUTO red light is EXTINGUISHED.

At panel 2HII-P652, the Operator CONFIRl\\1S that the Diesel Gen VOLTAGE REG TRANSFER MANUAL green light is ILLUMINATED.

NOTE: The following step is critical only if an adjustment is required.

At pane12HII-P652, the Operator ADJUSTS the Diesel Gen2A VOLTAGE ADJUST switch until diesel output voltage to within +/- 50 volts of 4160 Bus 2E Voltage, as indicated on VOLTMETER,2R43-R904.

SAT/UNSAT SAT I UNSAT SAT/UNSAT SAT/UNSAT SAT IUNSAT

(*

  • Indicates critical step)

At pane12HII-P652, the I.F*JIlhll Operator PLACES Diesel Gen 2A

17. I Using Diesel Gen 2A Speed Adjust switch, adjust diesel speed to attain a slow synchroscope rotation in the clockwise (fa<;t) direction.
18. I Observe the voltage on each phase of 4160V Bus 2E and record the highest voltage.
19. I Using Diesel Generator 2A Voltage Adjust switch, increase diesel output voltage to match the highest phase voltage on 4160V Bus 2E.

Synchroscope switch (SSW) for ACB 135530 to ON, synchroscope starts rotating and the synchroscope lights cycle through dim to bright.

At panel 2H11-P652, the Operator uses the Diesel Gen 2A SPEED ADJUST, to adjust diesel speed to attain a slow synchroscope rotation in the clockwise (fast) direction.

At pane12HII-P652, the Operator OBSERVES the voltage on each pha'le of 4160V Bus 2E, as indicated on VOLTMETER, 2R43-R904, and RECORDS the highest voltage.

At pane12HII-P652, the Operator uses Diesel Generator 2A VOLTAGE ADJUST switch, INCREASES diesel output voltage to match the highest phase voltage on 4160V Bus 2E.

At pane12HII-P652, the Operator, when the synchroscope indicates 2 minutes to 12 and when the synchroscope lights are at the dimmest point, CLOSES EtvIERGENCY SUPPLY ACB I 135530, red light illuminated.

LR-JP-25034-06 Page 7 of9 SAT/UNSAT SAT /UNSAT SAT/UNSAT SAT /lJNSAT SAT/UNSAT NOTE: IF during the performance of the following two steps, the Operator trips the diesel, these steps become critical and the JPM is failed.

(** Indicates critical step)

At panel2H11-P652, the Operator uses the Diesel Gen 2A SPEED ADJUST switch, ADJUSTS the load on the diesel to 500 to 1000 kW, as indicated on KILOWATT, 2R43-R615A.

SAT/UNSAT

)

At pane12HII-P652, the

~w:it~fJ,;ai:1j'Q!~t1:ti~t¢aL¢ti've.lo~!dl Operator uses the Diesel Gen 2A VOLTAGE ADJUST switch, adjusts reactive load to between 500 and 1000 KV AR.

LR-JP-25034-06 Page 8 of9 SAT/UNSAT

23. I Gradually increase load to between 1750 and 2000 KW.

At pane12HII-P652, the Operator uses the Diesel Gen 2A SPEED ADJUST switch, ADJUSTS the load on the diesel to 1750 and 2000 KW, as indicated on KILOWATT, 2R43-R615A.

SAT IUNSAT NOTE: AS the Operator is increasing the diesel loading to 1750 kW, ACTIVATE (RB-l) MALFUNCTION mf65213665, "Spur Ann - LUBE OIL PRESS LOW."

PROMPT:

5 -10 seconds later, ACTIVATE (RB-2) MALFUNCTION mf65213683, "Spur Ann - EMERGENCY ENGINE SHUTDOWN."

PAGE the Operator as the SO in the Diesel Building and REPORT that an oil line has split ami is spevling hot oil. I eannoi-g~t4e4~iesel-~is-eee:inniR~t@=~:

!;pr~Y'tt8 tffiU At pane12HII-P652, the Operator, OPENS EMERGENCY SUPPLY ACB 135530 within 6 minutes of the "Emergency Engine Shutdown" alarm.

SAT IlJNSAT PROMPT:

At panel 2H11-P652, the Operator TAKES the Diesel Gen 2A START switch to the STOP position vvithin 6 minutes of the "Emergency Engine Shutdown" alarm..

SAT /lJNSAT ONCE the Operator has stopped the diesel, INFORM the Operator that another Operator will complete the shutdown and contact Maintenance.

END TIME: ___

(*

  • Indicates critical step)

)

NOTE:

The terminating cue shall be given to the Operator when:

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

Operator has stopped the 2A Diesel Generator.

TERMINATING CUE: We will stop here.

(** Indicates critical step)

LR-JP-25034-06 Page 9 of9

N/R FINAL 04/07/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM4 SOUTHERN.\\

COMPANY Energy to Serve Your World SM

I SOUTHERN NUCLEAR OPERATING COMPANY

\\PLANT E. I. HATCH FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Page 1 of 1 Media Number: LR-JP-OS.02A-OO 00 05119/07 Initial Development DHG RAB

)

LR-JP-05.02A-00 Page 1 of6 UNIT 1 ()

UNIT 2 (X)

PERFORM A MANUAL STARTUP OF HPCI, CONTROLLER FAILURE, LOW, ALTERNATE PATH LR-JP-05.02A-00 The task shall be completed when the HPCI System has injected into the Reactor per 34S0-E41-00 1-2 and then manually isolated after a steam leak.

005.002 005.002.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.00 SRO 3.00 KIA CATALOG NUMBER: 295031 EAl.02 KIA CATALOG JTA IMPORTANCE RATING:

RO 4.5 SRO 4.5 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

APPROXIMATE COMPLETION TIME:

10 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

LR-JP-OS.02A-00 Page 2 of6 SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to IC #113, or other full power IC, and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS and OVERRIDES:

mfESI 109 RCIC Failure to Auto Start 00000 mfR22 180 4KV Bus 2C Fault 00000 mfR22 181 4KV Bus 2D Fault 00000 mfE41 23SA HPCI Fails to Auto Start on Low Level 00000 mfE41 23SB HPCI Fails to Auto Start on Hi Drywell Pressure 00000 mfE41 106 HPCI Flow Control Fails Low 00000 mf6011lOS1 HPCI Isolation Trip Logic A Initiated 1

(Annunciator ON) mf60111OS7 HPCI Isolation Trip Logic B Initiated 1

(Annunciator ON) mf60111OS2 HPCI Turbine Exh Diaohra!!1ll Press Hilili 1

3.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Perfonn RC-l and RC-2 B. Allow simulator to run until RWL as indicated on 2B21-R623A and B is <-3S inches.

C. Ensure the flow Controller display shows flow and NOT flow rate.

D. Acknowledge annunciators.

E.

Instructor Note: Key 1 malfunctions are put in after HPCI is injecting and the minimum flow valve has closed OR at the discretion ofthe examiner.

4.

PLACE the Simulator in FREEZE until the INlTIA TING CUE is given.

5.

ESTIMATED Simulator SETUP TIME:

10 Minutes 2

\\ )

UNIT 2 READ AND GIVE A COpy TO THE OPERA TOR INITIAL CONDITIONS:

1.
2.
3.
4.
5.
6.

The HPCI System is in Standby.

A loss of the normal Feedwater pumps has occurred.

3 1 EO-EOP-O 1 0-2 (RC) is in progress.

RWL is < -35 inches and decreasing.

HPCI failed to autostart.

HPCI is required to maintain R WL.

INITIATING CUES:

Start HPCI manually and inject into the Reactor.

I For INITIAL Operator Programs:

LR-JP-OS.02A-OO Page 4 of6 For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

START TIME: ___ _

PROMPT:

IF the operator addresses HPCI suction transfer logic, as the Shift Supervisor, INFORM the operator that the HPCI high Torus level suction transfer logic has been overridden.

1. Open Lube Oil Cooling Water Valve, At panel2HlI-P601, LUBE OIL SAT/UNSAT 2E41-FOS9.

CLG WTR VLV, 2E41-FOS9 is OPEN, red light illuminated.

2. Start HPCI Barometric Condenser At panel2HII-P601, HPCI SAT I UNSAT Vacuum Pump, 2E41-COO2-2.

BAROM CNDSR VACUUM PUMP, 2E41-C002-2 is OPERA TING, red light illuminated.

PROMPT:

IF the operator addresses posting High Radiation Areas, as the Shift Supervisor, INFORM the operator as Shift Supervisor that Health Physics is posting the areas.

3.
4.

Open the HPCI Turbine Steam Supply At pane12HII-P601, the TURB SAT IUNSAT Valve,2E41-FOOl.

STEAM SUPPL Y VL V, 2E41-FOO 1 control switch is in the OPEN position, red light illuminated.

NOTE: Valve 2E41-FOO 1 is not required to be full open prior to proceeding to following steps.

Start the Auxiliary Oil Pump.

At panel2HII-P601, the AUX SAT IUNSAT OIL PUMP, 2E41-C002-3, is OPERATING, red light illuminated.

(*

  • Indicates critical step)
5. I Open the Pump Discharge Valve, 2E41-F006.
6. I Confirm the following valves are open:

Turbine Control Valve Turbine Stop Valve Verify the Minimum Flow Valve, 2E41-F012, closes as flow increases into the reactor.

9. I Respond to HPCI annunciators.
  • 601-115 "HPCI Isolation Trip Logic A Initiated"
  • 601-121 "HPCI Isolation Trip Logic B Initiated"
  • 601-116 "HPCI Turbine Exh n~h~n~ Press At paneI2H11-P601, PUMP DISCHARGE VLV, 2E41-F006 is OPEN, red light illuminated.

At paneI2H11-P601, the following valves are OPEN, red light illuminated:

TURBINE CONTROL VL V TURBINE STOP VL V At paneI2H11-P601, operator RECOGNIZES HPCI FLOW CONTROL, 2E41-R612 has failed low. The operator TRANSFERS the controller to manual and ADJUST until HPCI discharge pressure is greater than reactor pressure with level increasing.

At paneI2H11-P601, the operator VERIFIES MIN FLOW VL V, 2E41-FO 12 is CLOSED with green light illuminated.

Operator acknowledges annunciators and refers to procedures for:

  • 601-115

.601-121

.601-116 LR-JP-05.02A-00 Page 5 of6 SAT I UNSAT SAT/UNSAT SAT I UNSAT SAT I UNSAT SAT I UNSAT NOTE:

The operator may trip the turbine and shut the Steam Supply Valve 2E41-F001 prior to shutting the Inboard/Outboard Isolation Valves.

NOTE:

Only one of the two steam isolation valves is critical. Once closed, the other valve becomes non-critical.

At paneI2H11-P601, the operator places 2E41-F002 keylock switch to the CLOSE position.

SAT/UNSAT

(*

  • Indicates critical step)

At pane12HI1-P601, the operator places 2E41-F003 keylock switch to the CLOSE position.

At panel2HII-P601, the operator allows the HPCI Aux Oil to continue to run with turbine speed greater than 0 rpm.

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Inboard/Outboard Isolation Valves are closed AND The Examiner has verified that the candidate will not secure the Aux Oil Pump when turbine speed is greater than 0 rpm.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

LR-JP-OS.02A-OO Page 6 of6 SAT /UNSAT SAT /UNSAT END TIME: ___

)

)

NIR FINAL 04/06/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIMS Energy to Serve Your World SM

SOUTHERN NUCLEAR OPERATING COMPANY

  • .JPLANT E. I. HATCH FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING 00 01125/02 Initial development 01 03/19/02 Include initial operator statement Page 1 of 1 Media Number:

LR*JP-20003A TLB DHG RAB RAB 02 05/27/05 Revised Initial License statement for successful RAB RAB completion 03 06/07/05 Include instructor feedback I RAB l RAB 04 05/05/06 Remove Response Cues I RAB I RAB lrl ------+------+--------------------------------~----_4r_----~

y

/

LR-JP-20003-04 Page 1 of6 UNIT 1 0

UNIT 2 (X)

OVERRIDE AND REOPEN PLANT SERVICE WATER ISOLATION VALVES LR-JP-20003-040 The task shall be completed when the Plant Service Water Isolation valves isolation signal has been overridden and the header pressure is controlled greater than 80 psig.

200.013 J(i-fj~eiI-\\i~NirM-.jE-R~ 200.013.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.0 SRO 4.0 KIA CATALOG NUMBER 295018 AA2.05 KIA CATALOG JTA IMPORTANCE RATING:

RO 2.9 SRO 2.9 OPERA TOR APPLICABILITY:

Nuclear Plant Operator (NPO)

APPROXIMATE COMPLETION TIME:

3.0 Minutes current version 34AB-P41-001-2 (current version) OR PSWPlacard Key for Plant Service Water valves Isolation Override.

SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to IC #113, or other full power IC, and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS and OVERRIDES:

LR-JP-20003-040 Page 2 of6

              • I********"FW~~~******I****.. *M~;EI*........ ~.(;~.~;
    • >V'1\\.JiU!E *
      • AATi..TlNIEi*

mfP64 193A I Drywell Chiller Compressor A Failure 00000 mfP64 193B I Drywell Chiller Compressor B Failure 00000 mfP41 264B I PSW Line Break (Div 2 Supply) 24 100 0000 mfP41-67D Service Water Pump D Trip

                  • \\QVER:Rl]')ti*

diP41-COOIC PSWPumpC TRIP loP41-COOIC Gl I PSW Pump C OFF loP41-COOIC R2 I PSW Pump C OFF

3.

Take the simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS.

A. When the plant scrams on high Drywell pressure, perform RC-l and RC-2.

B. Stabilize Reactor water level at 10 to 50 inches.

4.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

5.

ESTIMATED Simulator SETUP TIME:

25 minutes NOTE: It takes 10-11 minutes to get a LOCA signal from loss of DW chillers.

(** Indicates critical step)

')

UNIT 2 READ AND GIVE A COPY TO THE OPERA TOR INITIAL CONDITIONS:

1. PSW Pump 2C is tagged out for maintenance.
2. PSW Pump 2D tripped. Maintenance is investigating.
3. An event has occurred that caused the Unit Two Turbine Building Plant Service Water Isolation valves to isolate.
4. There:o indication of a tJfl;<sieal PSW line break. vJ~.J1\\.e. 'I~M OCC-Ufr~, I 'JhC INITIATING CUES:

Reopen the Turbine Building Service Water Isolation Valves per 34AB-P41-001-2.

\\

1.

rJ

2.
3.

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

LR-JP-20003-04 Page 4 of6 NOTE: Either Division I OR IT may be started first. The completion of either Division will complete the JPM (Step 1,3 & 11 are common. Div IT starts at step 7)

START TIME: ___

NOTE: The operator will most likely use the Placard located on 2HII-P652 to override and open the PSW valves.

Operator obtains the procedure.

Operator obtains a copy of 34AB-SAT I UNSAT P41-001-2.

Operator verifies PSW Division I Operator VERIFIES Division I SAT/UNSAT Header Pressure is greater that 80 Plant Service Water Header psig.

Pressure as indicated by 2P41-R601A is greater that 80 psig.

NOTE: Override switches are arranged AID and B/C so both switches must be in "override" to open either Div I or Div IT valves.

Operator "OVERRIDES" the Plant At panel2HII-P652, the operator Service Water Turbine Building POSITIONS the Keylock Isolation Signal for the 2P41-F316A override switch for valves and D, and for the 2P41-F316 B and 2P41-F316AID and C.

2P41-F316B/C to the "OVERRIDE" position.

NOTE: The operator may elect to open the 2P41-F316C(D) valve before the 2P41-F316A(B) valve.

At paneI2HII-P652, the operator POSITIONS Control Switch for 2P41-F316A(C) to the "OPEN" position, red light illuminated, green light extinguished.

SAT/UNSAT SAT/UNSAT

(** Indicates critical step)

5. I Operator THROTTLES open valve 2P41-F316C(A).

At paneI2HII-P652, the operator THROTTLES open valve 2P41-F316(C)A, red light illuminated, while periodically monitoring Division I Header Pressure.

At pane12Hll-P652, the operator CLOSES 2P41-F316C(A) to maintain Division I Header Pressure greater than 80 psig.

LR-JP-20003-04 Page 5 of6 SAT/UNSAT SAT/UNSAT NOTE: IF 2P41-F316 C(A) switch is placed to CLOSE, the valve will travel to the full closed position.

7. Operator verifies PSW Division II Operator VERIFIES Division II Header Pressure is greater that 80 Plant Service Water Header psig.

Pressure as indicated by 2P41-R601B Is greater that 80 psig.

NOTE: The operator may elect to open the 2P41-F316D valve before the 2P41-F316B valve.

At paneI2HI1-P652, the operator POSITIONS Control Switch for 2P41-F316B(D) to the "OPEN" position, red light illuminated, green light extinguished.

At paneI2HII-P652, the operator THROTTLES open valve 2P41-F316D(B), red light illuminated, while periodically monitoring Division II Header Pressure.

At panel 2HI1-P652, the operator CLOSES 2P41-F316D(B) to maintain Division II Header Pressure greater than 80 psig.

SAT/UNSAT SAT/UNSAT SAT I UNSAT SAT/UNSAT

(*

  • Indicates critical step)

LR-JP-20003-04 Page 6 of6 NOTE: IF 2P41-F316 D(B) switch is placed to CLOSE, the valve will travel to the full closed position.

Operator infonns the Shift Supervisor that Division header pressure can not be maintained greater than 80 psig.

NOTE:

The tenninating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

The Operator notifes the SS that Division I & II header pressures can NOT be maintained greater than 80 psig and the 2P41-F316A-D valves have been returned to the isolated position.

TERMINATING CUE: We will stop here.

(** Indicates critical step)

SAT/UNSAT END TIME: ___

NIR

}

FINAL 04/06109 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM6 Energy to Serve Your World SM

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH

,1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Pro~amJCourse Code:

OPERATIONS TRAINING Media Number:

02 08/16/93 General revision, word processor change 03 08/19/94 Modify simulator setup, adjust format 04 03/28/96 Format change 05 04/10/97 Revised based on feedback from the 1996 Requal annual exam.

06 I 02/07/00 I Format modification, change time allowance based on I running average, upgrade to the new simulator ing system 07 11/02/00 Include objective number 08 03/11/02 Include initial operator statement 09 03/17/05 Deleted "S" from procedure numbers, changed Revision and Rev. numbers to "Current Version".

Changed to Nuclear Plant Operator. Updated Simulator IC# and MSIV position.

10 I 06/13/05 Revised Initial License statement for successful completion 11 I 04/18/06 Remove Response Cues 12 11/06/06 Correct MPLs and Switch labels on Unit 1 Page 1 of1 LR-JP-14.14 RAB RSG RAB SMC RAB DHG SCB RSG RAB DHG RAB DHG RAB RAB ARB DHG RAB RAB RAB RAB BKW RAB

)

LR-JP-14.14-12 Page 1 of8 UNIT 1 0

UNIT 2 (X)

OVERRIDE THE MSIVS IN AN EMERGENCY LR-JP-14.14-12 The task shall be completed when the MSIVs have been opened per 31EO-EOP-111-2.

014.014 014.014.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.85 SRO 3.16 KIA CATALOG NUMBER: 295025 EA2.01 KIA CATALOG JTA IMPORTANCE RATING:

RO 4.3 SRO 4.3 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO) current versions)

APPROXIMATE COMPLETION TIME:

18.0 Minutes

). SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to IC #113 and leave in FREEZE.

2.

INSERT the following MALFUNCTIONS:

mfCll 211 Scram Discharge Volume ATWS (Var) 60 mffi41 235A HPCI Fails to Auto Start on Low Level mffi41 235B BPCI Fails to Auto Start on Hi DryweH Press mf60321383 I Spur Ann -- LO\\V CONDENSER VACUUM A BYPASS mf60321384 I Spur Ann -- LOW CONDENSER VACUUM B I BYPASS

3.

INSERT the following SIMULATOR VALUE OVERRIDES (SVO):

svoB2I005 LT-N08IA Group IIII Isolation

-110 svoB2I006 LT-N08IB Group IIII Isolation

-110

4.

INSERT the following REMOTE FUNCTIONS:

rfNII 45 SJAEA Steam rfB21 148 Grp 1 Low Rx Water Level Bypass rfC71 279 Group 1 Isolation Oride Jumpers 100 100 100 00000 00000 00000 00000 00000

--~J~~l'T"

.,*i'INf~*

00000 00000 CLOSE BYPAS ORIDE

5.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Take simulator out of FREEZE and perform RC-I and RC-2.

B.

Place the MSIV control switches in CLOSED.

C.

Enter Remote Functions when Torus temperature reaches 109°F or greater.

D.

Inhibit ADS and inject SBLC.

E.

Acknowledge annunciators.

F.

Allow level to stabilize so frequent starting/stopping ofHPCIIRCIC is not necessary.

6.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

7.

ESTIMATED Simulator SETUP TIME:

15 Minutes

)

I UNIT 2 READ AND GIVE A COpy TO THE OPERATOR INITIAL CONDITIONS:

1.

An ATWS condition exists and 3 1 EO-EOP-O 1 1-2 (RCA) is in progress.

2.

The following isolations have been bypassed:

  • Condenser Low Vacuum
  • Low Reactor Water Level
  • High Flow Isolation of 2P70-F004 (Drywell Pneumatic Inboard Inlet Isolation) and 2P70-F005 (Drywell Pneumatic Outboard Inlet Isolation)
3.

The following systems are in operation:

  • Circulating Water
  • Condensate System
  • EHC INITIATING CUES:

Open the MSIVs to re-establish Main Condenser as the heat sink using 31EO-EOP-III-2, "Emergency Opening ofMISIVs".

1.

i'

2.

For INITIAL Operator Programs:

LR-JP-14.14-12 Page 4 of8 For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

Place MSIV Control Switches to At paneI2HII-P601, the CLOSED.

following OUTBOARD MSIV switches are in CLOSED:

  • MSIV 2B21-F022D NOTE: The next step is not necessary but the candidate may perform anyway.

Reset Group I Isolation.

The GR ISOL RESET switch has been taken to GR I RESET position at panels 2HII-P601 and 2HII-P602.

_ _____.. ____________.. _____________ L--.

START TIME: ___ _

SAT IUNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT I UNSAT SAT I UNSAT SAT IUNSAT INA

(** Indicates critical step)

)

3. I Confirm closed Inboard MSIVs.
5. I Check differential pressure across Inboard MSIV s.

At pane12HI1-P602, the following INBOARD MSIVs are CLOSED, green light illuminated:

-MSIV 2B21-F022A

., MSIV 2B21-F022B e MSIV 2B21-F022C

~ MSIV 2B21-F022D.

At pane12HII-P601, the following switches are in OPEN SLO TEST, red light illuminated:

4\\1 MSIV 2B21-F028A Ie MSIV 2B21-F028B

Operator has determined difIerential pressure is greater than 200 psid using:

REACTOR PRESSURE indicator A(B,C) 2C32-R60SA(B,C) on pane12HI1-P603 OR Post Accident Monitoring System 2B21-R623AIB on panel2Hl1-P601.

AND PRESS TO STOP VL VS 1 & 4 Recorder 2NII-R601 on panel 2HII-P650.

LR-JP-14.14-12 Page 5 of8 SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT I UNSAT SAT IUNSAT SAT/UNSAT SAT I UNSAT SAT/UNSAT NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 5.

(** Indicates critical step)

6. Confirm/Close valves The operator has ADDRESSED 2N11-F001A & B.

contacting a SO to verify/close SJAE 2A(2B) MAIN STEAM ISOL VAL VB at panel 2H21-P216.

PROMPT:

WHEN the operator addresses valves 2N11-F001A and B, as the SO, INFORM the operator that the valves 2N11-F001A & B are closed.

7. I Confirm the following valves are closed:

2N11-F004A At paneI2H11-P650, the following valves are CLOSED, green light illuminated:

LR-JP-14.14-12 Page 6 of8 SAT IUNSAT 2N11-F004B

.2NDSTGA&BMSR RHTR STM SPL Y VL V 2N11-F004A

, SAT/UNSAT 2N33-F003

(** Indicates critical step)

The following valves control switches are placed in OPEN, red lights illuminated:

  • DRAIN VL V, 2B21-F020, at pane12H11-P602 SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT SAT/UNSAT
9. Verify differential pressure across Operator has determined MSIVs is less than 200 psid.

differential pressure is less than 200 psid using:

REACTOR PRESSURE indicator A(B,C) 2C32-R605A(B,C) on panel2HII-P603 OR Post Accident Monitoring System 2B21-R623AIB on pane12Hll-P601.

AND PRESS TO STOP VL VS 1 & 4 Recorder 2NII-R601 on panel 2Hll-P650.

LR-JP-14.14-12 Page 70f8 SAT I UNSAT NOTE: Any valid indication of Reactor Pressure and Steam Line Pressure can be used for Step 9.

At panel 2HI1-P602, the following switches are in OPEN SLO TEST, red light illuminated:

.. MSIV 2B21-F022A It MSIV 2B21-F022B (II MSIV 2B21-F022C

., MSIV 2B21-F022D.

SAT/UNSAT SAT I UNSAT SAT IUNSAT SAT/UNSAT NOTE: It is acceptable if the operator uses the Open Fast Test switch position.

PROMPT:

IF the operator addresses system restoration, as the Shift Supervisor, INFORM the operator that restoration is not required at this time.

END TIME: ___ _

(*

  • Indicates critical step)

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

All MSIVs are open Operator states the task is complete.

TERMINATING CUE: We will stop here.

(** Indicates critical step)

LR-JP-14.14-12 Page 8 of8

)

NIR

)

FINAL 04/06/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM SIM7 SOUTHERN..

\\

COMPANY Energy to Serve Your World SM

SOUTHERN NUCLEAR OPERATING COMPANY

\\J>LANT E. I. HATCH FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Page 1 of 1 Media Number:

LR-JP-13.63 00 06/22/95 Initial development RAB SMC 01 I 06/26/96 I Format change, change time allowance RAB DHG 02 I 04/10/97 I Revised based on feedback from the from 1996 SCB RSG 03 04 05 06 07 Requal annual exam.

03/02/99 I Revised due to new simulator computer.

02/04/00 I Format modification, change time allowance based on running average, adjust title 04/24/00 I Based on student feedback, expanded the initiating cue to be more exact 05119/00 I Based on instructor feedback, conect simulator setup 11/02/00 Include objective number, C 1ange time allowance

".1 based on numing average SCB DHG RAB DHG RAB DHG RAB DHG RAB DHG

'I 08 03111102 Include initial operator statement RAB Rl\\B I 09 06/10/05 Revised Initial License statement for successful RAB RAB completion 10 04/07/06 I Remove Response Cues Rl-\\B RAB

.~I------+----l------------------+----+------l

LR-JP-13.63-10 UNIT 1 0

UNIT 2 (X)

USING THE OVERRIDE SWITCHES, VENT THE TORUS WITH THE CAD SYSTEM LR-JP-13.63-10 The task shall be completed when the Torus is being vented via the CAD System, per 31EO-EOP-1 04.

013.063

'~~~e'"rnri~r4trl\\tJj~JI: 013.063.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.56 SRO 3.16 KIA CATALOG NUMBER: 295038 EKl.02 KIA CATALOG JTA IMPORTANCE RATING:

RO 4.2 SRO 4.4 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

APPROXIMATE COMPLETION TIME:

9.0 Minutes SIMULATOR SETUP:

REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

LR-JP-13.63-10 SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to IC #113, or other full power IC, and leave in FREEZE.

mfP64 193A Drywell Chiller Compressor A Failure 00000 mfP64 193B Drywell Chiller Compressor B Failure 00000 mfB21 123A Steam Line A Break (Be:fore Restrictor) (Var) 25

.01 00000 svoP33080 I DW 02 02 Concentration in Drywell

.03]

10 svoP33081 DW H2 H2 Concentration DryweU

.035 10 I svoP33082 SP 02 02 Concentration in Torus

.033 10

) I svoP33083 SP H2 H2 Concentration in Torus

.036 10

)

diT48-F333A 2 INCH ISOL VL V TORUS VENT EXHAUST CLOSE diT48-F333B TORUS VENT EXHAUST 2 INCH ISOL CLOSE INSTRUCTOR SETUP NOTE: Per step 7 of this JPM, when the operator tries to open 2T48-F333A (D) then delete the 2T48-F333B (A) malfunction so successful venting can occur on the other loop. Event Triggers T48-01 and 1'48-02 SHOULD be used to accomplish this. Test the event triggers and make sure that the A (B) will not open but then the B (A) will open (Le. test first trying to open the A valve, reset the simulator and then test opening the B valve first).

3.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A.

Place H2/02 analyzers in service.

B.

Start SBGT System "A" with a suction from the Reactor Building C.

Perform EO-EOP-114-2 to control RHR and CS injection flow rate.

D. Allow the simulator to run until the plant is in the UNSAFE Region of the DSIL Curve.

E.

When in the UNSAFE Region ofthe DSIL Curve, close the MSN s and open the ADS valves.

F.

Maintain R WL around "0" inches with Condensate.

G.

Put torus vent exhaust "B" indication on T48-R602 on the 2HII-P654 panel.

H. CAUTION: Insure black keys are inserted into the CAD LevellPressure override switches (i.e. green keys OUT)

4.

PLACE the Simulator in FREEZE until the INITIATING CUE is given.

5.

ESTIMATED Simulator SETUP TIME: 10 Minutes

UNIT 2 READ AND GIVE A COPY TO THE OPERATOR INITIAL CONDITIONS:

1.

A steam line break has occurred in the Drywell.

2.

Fuel failure exists based on Lab grab samples.

3.

Standby Gas Treatment is in operation.

4.

Normal AC Power is available.

5.

A Group II isolation has occurred.

6.

The Shift Supervisor is implementing path G-l of 3 1 EO-EOP-O 13-2 "Primary Containment Gas Control" INITIATING CUES:

Per the Shift Supervisor's direction, vent the Torus with the CAD valves, per 31EO-EOP-I04-2.

1.
2.
3.

LR-JP-13.63-10 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

START TIME: ___ _

NOTE:

This JPM is divided into two SEP ARA TE sections. Only one section is to be graded.

NOTE:

The following steps (1 through 10) apply if the candidate starts with the "A" loop.

Steps 11 through 20 apply if the candidate starts with the "B" loop.

Operator obtains the procedure.

Operator obtains 31EO-EOP-104-SAT IUNSAT

2.

Defeat the "A" side High Drywell At pane12HII-P657, the operator Pressure Isolation signal.

PLACES the keylock PCIS Override Switches to OVERRIDE for:

  • High Drywell Press, 2T48-SAT I UNSAT F332A
  • High Drywell Press, 2T48-SAT I UNSAT F333A Defeat the "A" side Low RPV Level At pane12HII-P657, the operator Isolation signal.

PLACES the keylock PCIS Override Switches to OVERRIDE for:

(*

  • Indicates critical step)
4.
5.

LR-1P-13.63-10 Open Torus 2" Vent valve, At pane12HII-P657 TORUS SAT I UNSAT 2T48-F332A.

VENT ISOL VL V, 2T48-F332A is placed to OPEN, red light illuminated.

Attempt to open Torus 2" Vent valve, At pane12HII-P657 TORUS SAT I UNSAT 2T48-F333A.

VENT ISOL VL V, 2T48-F333A is placed to OPEN, green light illuminated.

INSTRUCTOR NOTE: WHEN the operator tries to open 2T48-F333A then delete the 2T48-F333B malfunction so successful venting can occur on the "B" loop (Event Triggers T48-01 and T48-02 SHOULD be used to accomplish this)

At paneI2HII-P654, the operator PLACES the keylock PCIS Override Switches to OVERRIDE for:

  • High Drywell Press, 2T48-F333B At panel 2HII-P654, the operator PLACES the keylock PCIS Override Switches to OVERRIDE for:
  • Low RPV Level, 2T48-F333B At pane12HII-P654 TORUS VENT ISOL VL V, 2T48-F332B is placed to OPEN, red light illuminated.

At pane12HII-P654 TORUS VENT ISOL VL V, 2T48-F333B is placed to OPEN, red light illuminated.

SAT I UNSAT SAT I UNSAT SAT I UNSAT SAT I UNSAT SAT/UNSAT SAT I UNSAT i

I

(** Indicates critical step)

11.

12.

13.
14.

\\

At panel 2HII-P655, the

~1"If.l!'flh~ii;*1 operator OPENS FLOW CNTL FOR F337B, 2T48-R616B:

TORUS VENT FLOW CNTRL VL V, 2T48-F337B is OPEN, red light illuminated.

Flow indicated on recorder TORUS VENT EXH FLOW B, 2T48-R602.

LR-1P-13.63-10 SAT I UNSAT NOTE:

The following steps (11 through 20) apply if the candidate starts with the "B" loop.

Steps 1 through 1 0 apply if the candidate starts with the "A" loop.

Operator obtains the procedure.

Operator obtains 31EO-EOP-104-SAT/UNSAT

2.

Defeat the "B" side High Drywell At paneI2Hll-P654, the operator Pressure Isolation signal.

PLACES the keylock PCIS Override Switches to OVERRIDE for:

  • High Drywell Press, 2T48-SAT IUNSAT F332B
  • High Drywell Press, 2T48-SAT IUNSAT F333B Defeat the "B" side Low RPV Level At paneI2HII-P654, the operator Isolation signaL PLACES the keylock PCIS Override Switches to OVERRIDE for:

VENT ISOL VL V, 2T48-F332B is placed to OPEN, red light illuminated.

(** Indicates critical step)

15.

LR-JP-13.63-10 Attempt to open Torus 2" Vent valve, At paneI2HII-P654: TORUS SAT /UNSAT I

2T48-F333B.

VENT ISOL VL V, 2T48-F333B is placed to OPEN, green light illuminated.

-~

~~.

INSTRUCTOR NOTE: WHEN the operator tries to open 2T48-F333B then delete the 2T48-F333A malfunction so successful venting can occur on the "A" loop (Event Triggers T48-01 and T48-02 SHOULD be used to accomplish this)

At panel 2HII-P657, the operator PLACES the keylock pels Override Switches to OVERRIDE for:

., High Dry-well Press, 2T48-F332A It High Drywell Press, 2T48-F333A At pane12HI1-P657, the operator PLACES the keylock PCIS Oven-ide Switches to OVERRIDE for:

pane12HII-P657: TORUS VENT ISOL VL V, 2T48-F333A is placed to OPEN, red light illuminated.

SAT /UNSAT SAT/UNSAT SAT /UNSAT SAT/UNSAT SAT /UNSAT SAT/UNSAT

(** Indicates critical step)

At paneI2Hll-P657, the operator OPENS FLOW CNTL FOR F337A, 2T48-R616A:

TORUS VENT FLOW CNTRL VL V, 2T48-F337 A is OPEN, red light illuminated.

OR Flow indicated on recorder TORUS VENT EXH FLOW A, 2T48-R620 LR-JP-13.63-10 SAT I UNSAT PROMPT:

WHEN the operator opens 2T48-F337B(A), INFORM the operator that another operator will complete the procedure.

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

Operator has opened Torus Vent Flow Control Valve, 2T48-F337B(A).

TERMINATING CUE: We will stop here.

(** Indicates critical step)

END TIME: ___ _

\\)

/

N/R FINAL 04/06109 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM Plant 1 Energy to Serve Your World SM

r SOUTHERN NUCLEAR OPERATING COMPANY tPLANT E. I. HATCH FORM TITLE: TRAINING MATERIAL REVISION SHEET Pro~ramlCourse Code:

OPERATIONS TRAINING Page 1 of 1 Media Number:

LR-JP-ll.12 Ij.L~~!f"\\.C *. *

.... I'.i.. j

.** ~2:.~~*.i.* )I**..*****.., **..** }> *.* </....,..... *.......*

  • . P.* g.....*.. F~.~;J~I{*I;.**.**...** *~.** *. ;

.*.****** ***i *. **** *. **.. 2.**: *.**.'ii***".,*i~); *

.... **~I1~fi11~.*.i*.

01 06/13/89 General revision and format change JEM SMC 02 08/09/89 Procedure revision & add LR lesson plans JEM DHG 03 09/08/89 Revision of questions JEM SMC 04 03/01190 Procedure, format, & question revision JEM DBG 05 03/26191 Procedure revision JEM DHG 06 07121192 General revision and format change

\\VMM DBG 07 08/13/93 General revision, incorporate instructor comments, RA.B RSG word processor change 08 08/05194 Adjust format, change time allowance RAB MMG 09 08117195 Fonnat change, incorporate student comments, change RAB SMC time allowance 10 06117/96 Format change RAB RSG 11 01118100 Format modification, change time allowance based on RAB DBG running average, incorporate new KIA numbers and values, clarifY initial conditions 12 10/30/00 Change operator applicability to Systems Operator, RAB DBG include objective number, change time allowance based on fmming average 13 02/27/02 Include initial operator statement RAB RAB 14 03117105 Deleted "s" from procedure numbers, changed ARB DBG Revision and Rev. numbers to "Current Version".

15 06/02/05 Revised Initial License statement for successful Rl\\B RAB completion 16 04/06/06 Remove Response Cues RA~B RAB L-_____

)

UNIT 1 0

LR-JP-l1.12-16 Page 1 of6 UNIT 2 (X

FROM OUTSIDE THE CONTROL ROOM, INJECT BORON USING THE SBLC SYSTEM LR-JP-l1.12-16 The task shall be completed when one Standby Liquid Control Squib Valve has been fired and one System pump has been started locally and the Standby Liquid Control System is injecting to the Reactor, per 34S0-C41-003.

011.012

,~'l~J*jt$;I'1¥l~,Nt[
M.~~.~/B!' *., 011.0 12.B

)

PLANT HATCH JTA IMPORTANCE RATING:

RO 4.20 SRO 4.20 KIA CATALOG NUMBER: 295037 EA1.04 KIA CATALOG JTA IMPORTANCE RATING:

RO 4.5 SRO 4.5 OPERATOR APPLICABILITY:

System Operator (SO)

APPROXIMATE COMPLETION TIME:

21.0 Minutes SIMULATOR SETUP:

NI A 34S0-C41-003-2 (current version)

Four (4) SBLC Squib Valve jumper wires and screwdriver from EOP file next to Remote Shutdown Pane12C82-POOl or 185" RB EOP Gang Box.

3 Pictures of Jumper locations (Squibs A & B, and Pump) 1

')

UNIT 2 READ AND GIVE A COpy TO THE OPERATOR INITIAL CONDITIONS:

1.

The Reactor has failed to Scram either manually or automatically, and the Torus temperature is approaching the BUT curve.

2.

31EO-EOP-Oll-2 (RCA) is in progress.

3.

SBLC has failed to initiate from the Control Room.

4.

RWCU is isolated.

)

INITIATING CUES:

Manually initiate SBLC locally per 34S0-C41-003-2.

1.
2.

LR-JP-ll.I2-16 Page 3 of6 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

START TIME: ___ _

Operator identifies the materials that Operator has identified that SAT IUNSAT needed materials are:

are required.

  • Screw driver
  • Jumpers and can be obtained at:
  • EOP Gang Box 185' elevation Operator reviews the procedure's Operator has reviewed the SAT IUNSAT precautions and limitations.

precautions and limitations.

PROMPT:

PROMPT:

NOTE:

PROMPT:

WHEN operator identifies the proper junction box/panel, THEN show the operator the picture for the appropriate box/panel.

IF the operator questions the color of the "white" wire in the picture, THEN inform the operator that the color of the wire is white For the 2H21-POl1 picture, the bottom row is the AA strip and from left to right, the 4 yellow cables are connected to terminals AA-5, AA-6, AA-I0 and AA-ll.

IF the operator questions the labeling on the back of the yellow cables, THEN indicate they are labeled, from left to right, AA-5, AA-6, AA-10 and AA-ll.

(** Indicates critical step)

At Pane12H21-POll, the following jumpers are INSTALLED for 2C41-F004A:

Tenninal point AA-5 to Squib Valve, 2C41-F004A, Junction Box terminal point 1 (white wire) and terminal point 3 (green wire).

Terminal point AA-6 to Squib Valve, 2C41-F004A, Junction Box terminal point 4 (red wire) and temlinal point 2 (black wire).

At Pane12H21-POll, the following jumpers are INSTALLED for 2C41-F004B:

Terminal point AA-IO to Squib Valve, 2C4l-F004B, Junction Box terminal point 1 (white wire) and terminal point 3 (green wire).

Terminal point AA-l1 to Squib Valve, 2C41-F004B, Junction Box terminal point 4 (red wire) and terminal point 2 (black wire).

LR-JP-Il.I2-16 Page 4 of6 SAT IUNSAT PROMPT:

WHEN all terminals for a Squib Valve are correctly installed, INDICATE an explosive noise from the vicinity of that Squib Valve.

4.

NOTE: Detonation of one Squib Valve will satisfactorily meet the standard.

NOTE: The jumpers used to fire the Squib Valves are a jumper with 3 connections to connect all three terminal points.

Start Standby Liquid Pump At panel2H21-POII, STANDBY SAT IUNSAT 2C41-COOIA.

LIQUID PMP, 2C41-COOIA, control switch is in RUN.

(*

  • Indicates critical step)

LR-1P-ll.12-16 Page 5 of6 PROMPT:

WHEN the operator starts the pump, INFORM the operator that there is no change in noise levels.

NOTE:

If the operator looks at other pump indications, report negative indications for a running pump.

CONFIRM start of2C41-COOlB, SBLC Pump 2B.

At panel2H21-POll, SBLC PUMP, 2C41-COOIA, control switch is in STOP.

At paneI2H21-POl1, SBLC PUMP, 2C41-COOIB, control switch is in RUN.

Operator listens for the sound of a running pump or looks at other pump indications.

SAT /UNSAT SAT /UNSAT SAT /UNSAT PROMPT:

WHEN the operator starts the pump, INFORM the operator that there is the sound of a running pump.

8.

NOTE:

Ifthe operator looks at other pump indications, report positive indications for a running pump.

Verify the SBLC solution is being At paneI2H21-POIl, the operator SAT /UNSAT injected into the Reactor.

has VERIFIED SBLC Tank level is DECREASING as indicated by SBLC STORAGE TANK LEVEL INDICATOR, 2C41-ROOI.

PROMPT:

WHEN the operator addresses SBLC tank level, INDICATE for the operator that level is decreasing slowly, but is greater than 1300 gallons.

NOTE: It will take between 30 and 70 minutes to completely empty the SBLC Storage Tank.

(** Indicates critical step)

)

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

Operator has started the "B" pump and checked on tank level.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

END LR-1P-l1.12-16 Page 6 of6 TIME: ___

110d-lZHZ

(

NIR FINAL 04/06/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM Plant 2 SOUTHERN.'

COMPANY Energy to Serve Your World SM

ISOUTHERN NUCLEAR OPERATING COMPANY

  • l,PLANT E. I. HATCH FORM TITLE: TRAINING MATERIAL REVISION SHEET Pro~am/Course Code:

OPERATIONS TRAINING Media Number:

12 02/26/02 Include initial operator statement 13 03/17/05 Deleted "s" from procedure numbers, changed Revision and Rev.

numbers to "Current Version," changed "Reactor Operator" to "Nuclear Plant Operator," and changed IC #107 for Simulator Setup.

14 05/31105 Revised Initial License statement for successful completion 15 04/06/06 Remove Response Cues 16 08/07/08 Corrected to match procedure step for confirming open 2EI1-FOO3B.

Page 1 of 1 LR-JP-07.20 RAE RAE BEB DBG RP..B RAE RAB RAE GHC BKW

LR-JP-07.20-16 UNIT 1 0

UNIT2 (X)

FROM THE REMOTE SHUTDOWN PANEL, START RHR IN TORUS COOLING LR-JP-07.20-16 The task shall be completed when the operator has successfully placed the "B" loop ofRHR into Torus Cooling from the Remote Shutdown Panel per 31RS-OPS-00 1.

007.020 007.020.0 PLANT HATCH JTA IMPORTANCE RATING:

RO 3.40 SRO 3.80 KIA CATALOG NUMBER: 295013 AA1.01 KIA CATALOG JTA IMPORTANCE RATING:

RO 3.9 SRO 3.9 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

APPROXIMATE COMPLETION TIME:

22.0 Minutes SIMULATOR SETUP:

N/A (current version)

Key for Remote Shutdown Panel (if oerformed in

LR -JP-07.20-16 SIMULATOR SETUP Simulator Initial Conditions:

1.

RESET the Simulator to Ie #113 and leave in FREEZE.

2.

Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Place the Mode Switch to SHUTDOWN.

B.

Perform RC-1, RC-2, TC-1, and reset the scram.

C. Maintain RWL between 32 to 42 inches.

D. Place all the Remote Shutdown Panel Transfer switches to EMERG.

E.

Place RHRSW Pump "2B" in operation at 4400 gpm as indicated on 2H21-Pl73 indicator, 2E11-R071.

3.

PLACE the Simulator in FREEZE until the crew assumes the shift.

4.

IF another JPM is to take place concurrently, and the candidate is to later take that same JPM, THEN the candidate must NOT see the simulator setup for the JPM while in transit to the RSDP room.

Possible options include:

Take the candidate in through the back door and:

y Place a curtain from P601 to page announcement column OR y Have the candidate wear a blind fold until he gets into the back panels. SAFETY NOTE -

If this is done, candidate must be supported under the arm until the blind fold is removed -

SAFETY NOTE Setup the simulator with the candidate waiting in the back panels WITH an escort and then go into the RSDP area when the simulator is ready.

4.

ESTIMATED Simulator SETUP TIME:

20 Minutes

')

)

UNIT 2 READ AND GIVE A COPY TO THE OPERATOR INITIAL CONDITIONS:

1.

An event has occurred which required the control room to be evacuated.

2.

All immediate operator actions have been performed.

3.

RHR is in Standby.

4.

Normal AC power is available.

5.

RHRSW Pump "2B" is running at 4400 gpm.

6.

3IRS-OPS-00l-2 is in progress.

7.

All RSDP transfer switches have been placed in the "EMERG" position.

INITIATING CUES:

Place RHR Loop "B," in Torus Cooling at the Remote Shutdown Panel per 31RS-OPS-001-2, Attachment 6, beginning at step 3.0.

LR -JP-07.20-16 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

START TIME: ___ _

1. Operator obtains the procedure.

Operator obtains a copy of 31RS-SAT I UNSAT OPS-001-2.

PROMPT:

WHEN the operator addresses transfer switch positions, INDICATE for the operator that ALL transfer switches are in the EMERG position.

PROMPT:

IF the operator addresses RHRSW operation, as the Shift Supervisor, INFORM the operator that RHRSW Pump "2B" is running with 4400 gpm flow.

PROMPT:

IF the operator addresses Torus temperature, INDICATE for the operator that Torus temperature is <100°F.

2. I Close valve 2Ell-F047B.

At pane12C82-P001, the HX INLET VL V, 2E11-F047B control switch is placed to CLOSE with green light illuminated.

SAT/UNSAT

3. I Confirm 2Ell-F003B is open.
4. I Confirm 2E11-F048B is open.

(** Indicates critical step)

At paneI2C82-P001, HX OUTLET VLV, 2Ell-F003B is OPEN, red light illuminated.

At pane12C82-P001, HX BYPASS VLV, 2Ell-F048B, is OPEN, red light illuminated.

At paneI2C82-P001, the RHR TORUS SPRAY OR TEST VL V, 2E11-F028B control switch is placed to OPEN.

SAT I UNSAT SAT/UNSAT SAT I UNSAT

LR-JP-07.20-16

6. I Confirm that 2E11-F028B is open.

I At panel2C82-P001, RHR I

SAT I UNSAT TORUS SPRAY OR TEST VL V, 2E11-F028B is OPEN, red light illuminated.

7. I Confirm that 2E11-F007B is open.

I At panel 2C82-POO 1, MIN SAT/UNSAT FLOW VLV, 2Ell-F007B, is OPEN, red light illuminated.

At paneI2C82-P001, the RHR SAT/UNSAT PUMP, 2E11-C002B control switch is placed to START.

At paneI2C82-P001, RHR SAT I UNSAT PUMP, 2E11-C002B red light is illuminated.

At paneI2C82-P001, the SAT/UNSAT following has been performed:

FULL FLOW TEST LINE VL V, 2E11-F024B, is THROTTLED OPEN, red and green lights illuminated.

RHR FLOW 2C82-R004, indicates less than or equal to 7700 gpm. (accept 6500-7500 gpm)

11. I Confirm valve 2Ell-F007B closes.

I At panel2C82-P001, MIN SAT I UNSAT FLOW VL V, 2E11-F007B, is CLOSED and remains closed, green light illuminated.

At paneI2C82-P001, the HX SAT I UNSAT INLET VLV, 2E11-F047B control switch is placed to OPEN.

13. I Confirm open valve 2E 11-F04 7B.

I At paneI2C82-POOl, HX INLET i SAT/UNSAT VLV, 2E11-F047B is OPEN, red light illuminated.

14. I Confrrm open valve 2E11-F003B.

I At pane12C82-P001 HX SAT I UNSAT OUTLET VL V, 2E 11-F003B is OPEN, red light illuminated.

(** Indicates critical step)

)

LR -JP-07.20-16 At pane12C82-POOl, HX BYPASS VLV, 2Ell-F048B control switch is placed to CLOSE.

SAT IUNSAT

16. I Confinn closed 2EII-F048B.

At pane12C82-POOl, HX BYPASS VLV, 2EI1-F048B is CLOSED, green light illuminated.

SAT IUNSAT PROMPT:

IF the operator addresses RHRSW to RHR dP, as a System Operator, INFORM the operator that RHRSW to RHR dP is >20 psid.

PROMPT:

IF the operator addresses Torus Spray, as the Shift Supervisor, INFORM the operator that Torus Spray is not required at this time.

PROMPT:

IF the operator addresses securing Torus Cooling, as the Shift Supervisor, INFORM the operator that this is not desired at this time.

NOTE:

The tenninating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

END TIME: ___ _

(** Indicates critical step)

)

SOUTHERN NUCLEAR DOCUMENT TYPE:

PAGE PLANT E. I. HATCH EMERGENCY OPERATING PROCEDURE 1 OF 47 DOCUMENT TITLE:

DOCUMENT NUMBER:

VERSION NO:

SHUTDOWN FROM OUTSIDE CONTROL ROOM 31 RS-OPS-001-2 6.12 EXPIRATION APPROVALS:

EFFECTIVE DATE:

DEPARTMENT MGR G. L. Johnson DATE 06-05-98 DATE:

N/A SSM / PM N/A DATE N/A 1-27-09 1.0 CONDITIONS Under certain conditions the Control Room may be uninhabitable. This procedure describes actions necessary to bring the Reactor to a shutdown condition from a steady state normal operating condition by manipulating plant controls outside of the Main Control Room. The controls are located on 2C82-P001, Remote Shutdown Panel.

The Shift Supervisor has determined that continued operation of the unit, from the Main Control Room, is NOT conducive to safe plant operation.

TABLE OF CONTENTS Section Page 2.0 AUTOMATIC ACTIONS...................................................................................................... 1 3.0 IMMEDIATE OPERATOR ACTIONS................................................................................... 2 4.0 SUBSEQUENT OPERATOR ACTIONS.............................................................................. 3 Attachments BREAKER CLOSING PROCEDURE WITHOUT CONTROL POWER............................., 11 2

CONTINUING RCIC OPERATION FROM THE REMOTE SHUTDOWN PANEL '............. 18 3

RCIC OPERATION FROM THE REMOTE SHUTDOWN PANEL..................................... 22 4

RCIC SHUTDOWN FROM THE REMOTE SHUTDOWN PANEL..................................... 26 5

LPCI OPERATION FROM THE REMOTE SHUTDOWN PANEL...................................... 28 6

TORUS COOLING FROM THE REMOTE SHUTDOWN PANEL...................................... 32 7

SHUTDOWN COOLING FROM THE REMOTE SHUTDOWN PANEL.............................. 37 8

PSW PUMP OPERATION FROM THE REMOTE SHUTDOWN PANEL........................... 46 2.0 AUTOMATIC ACTIONS None MGR-0002 Ver. 8.1

)

)

)

SOUTHERN NUCLEAR PLANT E. I. HATCH DOCUMENT TITLE:

SHUTDOWN FROM OUTSIDE CONTROL ROOM 3.0 IMMEDIATE OPERATOR ACTIONS DOCUMENT NUMBER:

31 RS-OPS-001-2 3.1 PRIOR to leaving the control room, the plant operator will, IF possible, perform the following actions:

3.1.1 Enter 34AB-C71-001-2, Scram Procedure, AND SCRAM the reactor.

3.1.2 IF the reactor is shutdown, THEN trip the Main Turbine, AND perform placard TC-1.

3.1.3 PLACE level control in single element, AND perform placard RC-2.

3.2 IF the control room is being evacuated due to a fire, OR IF there is a fire anywhere, THEN enter 34AB-X43-001-2.

3.3 The Shift Supervisor shall perform the following:

3.3.1 Announce over the PA the emergency situation.

3.3.2 Direct all operators to report to 2C82-P001, Remote Shutdown Panel.

PAGE 2 OF 47 VERSION NO:

6.12 3.3.3 Have two-way radios or sound powered phones distributed to operators as required.

3.3.4 Contact HP AND have HP Techs report to Remote Shutdown Panel to determine habitability and to provide necessary coverage for shutdown operation.

E I The STA shall utilize SPDS to verify automatic action, isolations and initiations occur.

3.4 The Shift Supervisor will station someone (preferably the STA) at the TSC to operate SPDS.

3.5 IF the process computer is available, THEN send someone to the computer room on the 147' elevation, IF habitable, to operate the process computer.

MGR-0001 Rev. 4.0

)

SNC PLANT E. I. HATCH I PQ 32 of 47 DOCUMENT TITLE:

1 DOCUMENT NUMBER:

Version No:

6.12 SHUTDOWN FROM OUTSIDE CONTROL ROOM I 31 RS-OPS-001-2 ATTACHMENT...§..

TITLE:

TORUS COOLING FROM THE REMOTE SHUTDOWN PANEL Attachment Page 1 of 5 CAUTION I CAUTIONS:

DIESEL GENERATOR LOADING MUST NOT EXCEED THE FOLLOWING RATINGS FOLLOWING A LOSS OF OFFSITE POWER TO AVOID DIESEL OVERLOAD. AMPERAGE INDICATIONS ARE LOCATED ON PANEL 2R43-P001 IN EACH DIESEL GENERATOR ROOM.

RATINGS (AMPERES)

DIESEL 1000 HOUR 7 DAY (168 HOUR)*

1B 430 490 CONTINUOUS 12.5 DAY {300 HOUR}**

2A 440 500 2C 440 500

  • THE HIGHER 7 DAY RATING IS BASED UPON A YEARLY ACCUMULATION OF ENGINE OPERATING HOURS ABOVE THE CONTINUOUS RATING. A TOTAL OF 168 HOURS PER YEAR WITH A LOAD OF 430 TO 490 AMPERES IS ALLOWED.
    • THE HIGHER 12.5 DAY RATING IS BASED UPON A YEARLY ACCUMULATION OF ENGINE OPERATING HOURS ABOVE THE CONTINUOUS RATING. A TOTAL OF 300 HOURS PER YEAR WITH A LOAD OF 440 TO 500 AMPERES IS ALLOWED.
  • BEFORE STARTING AN RHR PUMP ON THE DIESEL GENERATOR, DIESEL LOAD MUST BE BELOW 360 AMPS (2A AND 2B RHR PUMPS) 340 AMPS (2C AND 2D RHR PUMPS). REFER TO 34S0-R43-001-2 TO REDUCE DIESEL LOADS IF REQUIRED.
  • BEFORE STARTING AN RHRSW PUMP ON THE DIESEL GENERATOR, DIESEL LOAD MUST BE BELOW 330 AMPS (2A, 2B, 2D RHRSW PUMPS), OR 320 AMPS (2C RHRSW PUMP). REFER TO 34S0-R43-001-2 TO REDUCE DIESEL LOADS, IF REQUIRED.
  • THE AMPERE VALUES ARE BASED UPON AN ASSUMED TOTAL POWER FACTOR OF 0.91 (1 B DG) AND 0.9 (2A AND 2C DG). LOADING OF THE DIESEL GENERATORS ABOVE 430 AMPERES (1B DG) AND 440 AMPERES (2A AND 2C DG) ON THE LOCAL INDICATORS MUST BE ACCOMPANIED BY CLOSE MONITORING OF OTHER DIESEL PARAMETERS FOR SIGNS OF OVERLOADING.

G16.030 MGR-0009 Rev. 5.0

SNC PLANT E. I. HATCH I Pg 33 of 47 DOCUMENT TITLE:

1 DOCUMENT NUMBER:

Version No:

6.12 SHUTDOWN FROM OUTSIDE CONTROL ROOM I 31 RS-OPS-001-2 ATTACHMENT..2...

TITLE:

TORUS COOLING FROM THE REMOTE SHUTDOWN PANEL Attachment Page 2 of 5 NOTE Placing the Remote Shutdown Panel Transfer for RHR in Emergency has the following effects on RHR system operation:

1.

The A, C, and 0 RHR pumps will automatically initiate in the LPCI mode on the following signals:

1.1 Reactor level greater than or equal to -113 inches (actual setpoint = -101 inches) 1.2 High Drywell pressure less than or equal to 1.92 PSIG (actual setpoint =

1.85 PSIG). With transfer switch 2C82-S9 in the EMERG position, the 'B' RHR pump will NOT auto start on any of the above signals

2.

Load shed AND overcurrent are still valid trip signals.

3.

2E11-F006A, 2E11-F006B, 2E11-F006C, 2E11-F006D, Pump suction valves, are still interlocked with their respective 2E11-F004 valve.

4.

2E11-F004B, Pump suction from the Torus, AND 2E11-F024B, Torus cooling, must be closed to open 2E11-F006B, SOC suction.

5.
6.
7.
8.
9.

However, once 2E11-F006B is open, 2E11-F024B may be reopened.

The loss of suction valve alignment trip is defeated for the 2B RHR pump.

2E11-F008 AND 2E11-F009, SOC Isol Vlvs, closure on high RX pressure (138 PSIG) AND low rx level (+3") is defeated.

2E11-F007B, Min Flow Vlv, operates automatically.

2E11-F048B, 3 minute LOCA interlock is defeated.

The LOCA interlock for closing the following valves is defeated:

2E11-F011B, 2E11-F016B, 2E11-F028B, 2E11-F027B.

10. Interlock to prevent opening both 2E11-F015B AND 2E11-F017B, Inbd AND Outbd Inj Vlvs, with rx. pressure;::: 425 PSIG is defeated.
11. Interlock to automatically open 2E11-F015B AND 2E11-F017B, Inbd AND Outbd Inj Vlvs, on a LOCA signal (-101 RWL AND 1.85 PSIG drywell pressure) with rx.

pressure ~ 425 PSIG is defeated.

12. Interlock to automatically close 2E11-F015B, Inbd Inj Vlv, IF in Shutdown Cooling AND receive a PCIS Group II signal (+3 RWL OR 1.85 PSIG Drywell pressure)

OR Rx pressure;::: 138 PSIG is defeated.

13. Interlock to automatically trip 2E11-C001 B AND 2E11-C001 0, RHRSW pumps, on a LOCA signal is defeated.
14. LOSP and breaker trips for 2E11-C001 B AND 2E11-C001 0, RHRSW pumps, are still in effect.
15. 2E11-F017B, RHR Outbd Inj Vlv, 5 minute LOCA interlock is defeated.

G16.030 MGR-0009 Rev. 5.0

-\\

)

i SNC PLANT E. I. HATCH l DOCUMENT TITLE:

I DOCUMENT NUMBER:

SHUTDOWN FROM OUTSIDE CONTROL ROOM 31 RS-OPS-001-2 ATTACHMENT..2...

TITLE:

TORUS COOLING FROM THE REMOTE SHUTDOWN PANEL Pg 34 of 47 Version No:

6.12 Attachment Page 3 of 5 NOTE An RHR pump discharge pressure of greater than or equal to 112 PSIG (127 PSIG, actual setpoint) OR a Core Spray pump discharge pressure of greater than or equal to 137 PSIG (152 PSIG, actual setpoint) is the final permissive for an automatic depressurization initiation IF the ADS two minute delay has elapsed.

1.0 At panel 2CS2-P001, PLACE the following transfer switches in the EMERG position:

2C82-S18, Nuc Blr Instrumentation

-P+/-

2CS2-S8, RHR & RCIC Indications

-P+/-

2CS2-S53, 2E51-F007, Steam Supply Inbd Isol Vlv.

2E11-F009, SOC Suction Vlv.

-P+/-

2CS2-S52, 2E11-F006C, SID Clg Vlv.

2E11-F006A, SID Clg Vlv.

-P+/-

2CS2-SS0, 2E11-F007B, Min Flow Vlv.

-P+/-

2CS2-S9, 2E11-C002B, RHR Pump

-P+/-

2C82-S13, 2E11-F017B, Outbd Inj Vlv.

2E11-C001B, Serv Wtr Pump 2E11-F015B, Inbd Inj Vlv.

-P+/-

2C82-S10, 2E11-F004B, Torus Suction Vlv.

2E11-F006B, Shutdown Clg Vlv.

2E11-F006D, Shutdown Clg Vlv.

-P+/-

2CS2-S1, 2E11-F008, SOC Suction Vlv.

2E 11-F023, Rx Head Spray Isol Vlv.

-P+/-

2CS2-S12, 2E11-F003B, Hx Outlet Vlv.

2E11-F027B, Torus Spray Vlv.

2E11-F048B, Hx Bypass Vlv.

-P+/-

2C82-S17, 2E11-F047B, Hx Inlet Vlv.

-P+/-

2CS2-S14, 2E11-F02SB, RHR Torus Spray Or Test Vlv.

2E11-F073B, Serv Wtr crosstie Vlv.

2E11-C001 0, Serv Wtr Pump

-P+/-

2CS2-S11, 2E11-F024B, Full Flow Test Line 2E11-F011B, Hx to Torus Vlv.

2E11-F016B, Cnmt Spray Outbd Vlv.

-P+/-

G16.030 MGR-0009 Rev. 5.0

)

SNC PLANT E. I. HATCH 1 Pg 35 of 47 DOCUMENT TITLE:

I DOCUMENT NUMBER:

SHUTDOWN FROM OUTSIDE CONTROL ROOM 31 RS-OPS-001-2 Version No:

6.12 ATTACHMENT..§..

TITLE:

TORUS COOLING FROM THE REMOTE SHUTDOWN PANEL Attachment Page 4 of 5 2.0 PLACE RHR Service Water in operation by performing the following steps:

2.1 2.2 2.3 2.4 At 600/208V MCC 2B ESS Div 2 2R24-S012, Frame 11 C, OPEN the breaker for 2E11-F068B, RHRSW Control Valve.

At 106RJR24, manually OPEN 2E11-F068B to approximately 40% OPEN.

At panel 2C82-P001, START 2E11-C001B OR 2E11-C001 D, RHR Serv Wtr Pump.

At 106RJR24 WHILE in communication with an operator at pane12H21-P173, ADJUST 2E11-F068B, RHRSW Control Valve, to obtain a flow rate of 4400 GPM as indicated on 2E 11-R071, RHR Heat Exchanger Service Water Flow.

NOTES: I* The RHR Hx is initially isolated to prevent damage to the Hx from the hydraulic shock created by starting the RHR Pump.

IF THE ONLY OPERATING PUMP IN AN RHR LOOP IN SUPPRESSION POOL CAUTION I COOLING WATER TRIPS, IT IS POSSIBLE THAT THE LPCIINJECTION LINE AND THE DRYWELL SPRAY LINE MAY DRAIN TO THE TORUS.

3.0 At panel 2C82-P001, Perform the following:

IF Suppression Pool temperature is < 100°F, Confirm CLOSED/CLOSE 2E11-F047B, Hx Inlet Vlv.

Confirm OPEN/OPEN 2E11-F003B, Hx Outlet Vlv.

4.0 At panel 2C82-P001, confirm 2E11-F048B, Hx Bypass Vlv, is OPEN.

5.0 At panel 2C82-P001, OPEN 2E11-F028B, RHR Torus Spray or Test Vlv.

6.0 Confirm 2E 11-F007B, Min Flow Vlv, is OPEN.

7.0 At pane12C82-P001, START 2E11-C002B, RHR Pump 2B.

8.0 At panel 2C82-P001, THROTTLE OPEN 2E11-F024B, Full Flow Test Line, to obtain a flow rate of less than or equal to 7700 GPM as indicated on 2C82-R004, RHR Flow, on panel 2C82-P001.

8.1 Confirm 2E 11-F007B, Min Flow Vlv, CLOSES.

G16.030 MGR-0009 Rev. 5.0 J1+/-

J1+/-

J1+/-

J1+/-

SNC PLANT E. I. HATCH l DOCUMENT TITLE:

I DOCUMENT NUMBER:

SHUTDOWN FROM OUTSIDE CONTROL ROOM 31 RS-OPS-001-2 ATTACHMENT ~

TITLE:

TORUS COOLING FROM THE REMOTE SHUTDOWN PANEL Pg 36 of 47 Version No:

6.12 Attachment Page 5 of 5 RHR Service Water flow must be maintained at less than 4400 GPM with one RHR iNOTE:\\ Service Water Pump operating, OR less than 8800 GPM with two RHR Service Water Pumps operating in a single RHR Service Water Loop.

9.0 At panel 2C82-P001, Confirm O~EN/OPEN the following valves:

2E11-F047B, Hx Inlet Vlv.

2E11-F003B, Hx Outlet Vlv.

10.0 At paneI2C82-P001, CLOSE 2E11-F048B, Hx Bypass Vlv.

11.0 At 106RJR24, ADJUST 2E11-F068B, RHRSW Control Valve, to maintain greater then or equal to 20 PSID as indicated on 2E11-DPIS-N003B, at 87RLR24, on panel 2H21-P021.

12.0 IF Torus Spray is desired, THEN at panel 2C82-P001, OPEN 2E11-F027B, Torus Spray Vlv.

13.0 WHEN Suppression Pool Cooling is no longer required, SHUT DOWN RHR from Suppression Pool Cooling by performing the following steps:

13.1 At panel 2C82-P001, CLOSE 2E11-F027B, Torus Spray Vlv.

13.2 At paneI2C82-P001, CLOSE 2E11-F024B Full Flow Test Line.

13.3 At panel 2C82-P001, SHUT DOWN 2E11-C002B, RHR Pump 2B.

13.4 At panel 2C82-P001, CLOSE 2E11-F028B, RHR Torus Spray or Test Vlv.

13.5 At panel 2C82-P001, OPEN 2E 11-F048B, Hx Bypass Vlv.

NOTE: I RHR Service Water may be left in operation to support Shutdown Cooling.

G16.030 MGR-0009 Rev. 5.0

\\ j N/R

)

I FINAL 04106/09 Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM Plant 3 Energy to Serve Your World SM

SOUTHERN NUCLEAR OPERATING COMPANY

~PLANT E. I. HATCH r)

FORM TITLE: TRAINING MATERIAL REVISION SHEET Page 1 of 1 Pro![amlCourse Code:

OPERATIONS TRAINING Media Number:

LR-JP-27.18 00 10/28/99 Initial development RAB DHG 01 04/24/00 Made Step 4 for both units non-critical, correct RAB DHG title,

02 11102100 I Include objective number, change time allowance RAB DHG based on 03 03/11102 Include initial operator statement RAB RAB 04 03/08/05 Documentum revision DNM RAB 05 05/27/05 Revised Initial License statement for successful RAB RAB completion 06 I 04118106 Remove ResDonse Cues RAB RAB

')

)

LR-JP-27.18-06 Page 1 of5 UNIT 1 (X)

UNIT 2 0

TRANSFER 600 V AC ESSENTIAL (LPCI BUS) FROM NORMAL TO ALTERNATE LR-JP-27.18-06 The task shall be completed when the operator has transferred a LPCI Bus (1R24-S018A) from its Normal to Alternate source per 34S0-R24-003-1.

027.018 fE;!NlJMBERf: 027.018.0 PLANT HATCH JTA IMPORTANCE RATING:

RO 3.43 SRO 3.53 KIA CATALOG NUMBER: 203000K1.08 KIA CATALOG JTA IMPORTANCE RATING:

RO 3.5 SRO 3.5 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

APPROXIMATE COMPLETION TIME:

23.0 Minutes I SIMULATOR SETUP:

N/A

)

,)

UNITl READ AND GIVE A COpy TO THE OPERATOR INITIAL CONDITIONS:

1.
2.
3.
4.
5.
6.

Unit 1 and Unit 2 are operating at 95% power.

The Normal Supply Breaker for the lA LPCI Bus, lR24-S01SA, must be replaced by maintenance.

Electrical power distribution for both units is aligned in a normal full power lineup.

lR24-S04S is energized lR24-S01S AlB Alt. Supply Breaker is CLOSED.

IR26-MlOS Manual Disconnect Switch (1R24-S0ISA Alt supp) is OFF.

INITIATING CUES:

Transfer IR24-S01SA from its Normal to its Alternate supply per 34S0-R24-003-1.

1

2.
3.
4.

For INITIAL Operator Programs:

LR-JP-27.1S-06 Page 3 of5 For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

START TIME: ___ _

NOTE:

To prevent going int%ut of the RCA twice, provide the initiating cue outside the RCA.

Operator obtains the procedure.

Operator obtains a copy of 34S0-SAT /UNSAT R24-003-1.

Operator reviews the procedure's Operator has reviewed the SAT/UNSAT precautions and limitations.

precautions and limitations.

Select procedure section for Operator goes to section 7.1.2, SAT/UNSAT "Energizing 1R24-S01Sa from "Energizing 1R24-S01Sa from Alternate Source".

Alternate Source".

De-energize 1 R24-S0 lSA.

Operator goes to section 7.2.1 SAT /UNSAT "De-energizing 1R24-S0 lSA" I

I PROMPT:

IF the operator asks if 1R24-S01SA has been de-energized, INFORM the operator that 1R24-S01SA has NOT been de-energized.

The operator CALLS the Control Room and REQUESTS that a Control Room Operator OPEN the lR24-S0 18A normal supply breaker on IHII-P60L SAT /UNSAT PROMPT:

AS the Control Room Operator, INFORM the operator that IR24-S0ISA normal supply breaker is open.

NOTE:

For the next step, per the initial conditions, IR26-M10S is OFF

(*

  • Indicates critical step)

In the 600VAC lCD Transformer Room, the operator PLACES the lR26-M018 Manual Disconnect switch to the OFF position.

SAT/UNSAT

In the 600 V AC 2C Bus Room, the operator PLACES the lR26-M077 disconnect switch to the OFF position.

LR-JP-27.18-06 Page 4 of5 SAT/UNSAT NOTE:

For the next step, per the initial conditions, lR24-S048 is energized

\\

/

8. Confirm 1 R24-S048 is energized via Operator confirms lR24-S048 is the lR22-S006 IF 4160 VAC Bus energized via the IR22-S006 IF 4160 VAC Bus NOTE:

For the next step, per the initial conditions, IR24-S018 AlB Alt.

Supply Breaker is CLOSED

9. Confirm CLOSED/CLOSE lR24-Operator confirms SO 18AIB Alt Supply Bkr.

CLOSED/CLOSE lR24-SO 18A/B Alt Supply Bkr.

NOTE.

For the next step, per the initial conditions, lR26-MI08 is OFF

10. I Confirm OFF lR26-M108, Manual Disconnect.
11. I Confirm disconnect switch lR26-M109 is the OFF position.
12. I Confirm lR24-S048 "Power Available" In the 1 CD 600VAC Transformer Room, the operator CONFIRMS the lR26-Ml08 disconnect switch is in the OFF position.

In the 1 CD 600V AC Transformer Room, the operator CONFIR11S the lR16-Ml09 disconnect switch is in the OFF position.

In the lCD 600VAC Transfonner Room, at the lR26-M107 transfer switch, the operator CONFI~1\\1S lR24-S048 "Power Available" light is ILLUMINATED.

In the lCD 600VAC Transformer Room, the operator PLACES lR26-M107 transfer switch to lR24-S018A position.

The operator SECURES lR26-M107 transfer switch in the correct position.

(** Indicates critical step)

SAT I UNSAT SAT IUNSAT SAT IUNSAT SAT I UNSAT SAT/UNSAT SAT I UNSAT SAT IlJNSAT

)

)

16. I VerifY lR24-S018A is energized.

In the 1 CD 600V AC TransfOlmer Room, the operator PLACES the lR26-M108 Disconnect switch to CONFIRM lR24-S018A is energized by observing an ILUJMlNA TED position indication lights (red or green) for IEI1-F015A AND/OR 1E11-F007A.

LR-JP-27.18-06 Page 5 of5 SAT/UNSAT SAT/UNSAT PROMPT:

As the Control Room Operator, inform the operator that IEll-FOI5A and IEll-F007A have light indications illuminated.

NOTE:

The terminating cue shall be given to the operator when:

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

END TIME: ___

(*

  • Indicates critical step)

SOUTHERN NUCLEAR PLANT E. I. HATCH PAGE 5 OF 11 DOCUMENT TITLE:

1R24-S018A/B 600 VOLT MCC OPERATION DOCUMENT NUMBER: I VERSION NO:

34S0-R24-003-1 5.9 7.1.2 Energizing 1 R24-S018A From Alternate Source (1 R24-S048)

CONTINUOUS I NOTE 1 R24-S018A 600 VAC MCC MUST NOT be powered simultaneously from its Normal AND Alternate sources.

7.1.2.1 7.1.2.2 DE-ENERGIZE 1 R24-S018A per the De-energizing 1 R24-S018A 600 VAC MCC subsection (7.2.1) of this procedure.

CONFIRM 1R24-S048 is energized via the 1R22-S006 1F 4160 VAC Bus.

NOTE Breaker position can be determined EITHER at 1H11-P601 panel OR locally at breaker.

However, breaker must be positioned locally.

7.1.2.3 CONFIRM CLOSED/CLOSE 1R24-S018A/B Alt Supply Bkr. (1R24-S048 Fr 1A).

"III NOTE I 1 R24-S048 MCC can NOT power 1 R24-S018A AND 1 R24-S018B simultaneously.

CAUTION I THE HANDLE WEIGHT OF 1R26-M107 TRANSFER SWITCH WILL TAKE SWITCH TO 1 R24-S018B POSITION.

7.1.2.4 7.1.2.5 MGR-0001 Ver. 3 In 600V 1 CD Transformer room, perform the following:

  • At 1R26-M107, Transfer Switch (1R24-S018A/B Alt Supp), CONFIRM 1 R24-S048 "POWER AVAILABLE" light ILLUMINATED
  • PLACE 1 R26-M 107 Transfer Switch to 1 R24-S0 18A position
  • SECURE 1 R26-M1 07 Transfer Switch in the 1 R24-S018A position
  • PLACE to ON 1 R26-M 108 Manual Disconnect Switch -~-

CONFIRM 1 R24-S018A is energized by observing an ILLUMINATED position indication lights (red or green) for 1E11-F015AAND/OR 1E11-F007A.

I

SOUTHERN NUCLEAR PLANT E. I. HATCH DOCUMENT TITLE:

1 R24-S01BAlB 600 VOLT MCC OPERATION 7.2 SHUTDOWN 7.2.1 De-energizing 1R24-S01BA 600 VAC MCC CONTINUOUS I PAGE B OF 11 DOCUMENT NUMBER: I VERSION NO:

34S0-R24-003-1 5.9 7.2.1.1 On 1 H11-P601, CONFIRM OPEN OR OPEN 1 R24-S01BA Norm Supply Bkr.

7.2.1.2 Locally, CONFIRM OFF/PLACE to OFF 1 R26-M1 OB Manual Disconnect Switch (1 R24-S01BA Alt supp). (600V 1 CD Transformer room) 7.2.1.3 CONFIRM OFF/PLACE to OFF1 R26-M077 Manual Disconnect Switch (1 R24-S01BA Normal Supp). (600 VAC 2C Bus room) 7.2.2 De-energizing 1 R24-S01BB 600 VAC MCC 7.2.2.1 7.2.2.2 7.2.2.3 MGR-0001 Ver. 3 CONTINUOUS I On 1 H11-P601, CONFIRM OPEN/OPEN 1 R24-S01BB Norm Supply Bkr.

Locally, CONFIRM OFF/place to OFF 1R26-M109, Manual Disconnect Switch (1 R24-S01BB Alt Supp). (600V 1 CD Transformer room)

CONFIRM OFF/PLACE to OFF 1R26-M07B, Manual Disconnect Switch (1R24-S01BB Normal Supply). (600 VAC 20 Bus room)

~

G)

u,

a a a

<0

<D

=-'

.j:::.

STARTUP2C STARTUPID 1browOver Switch 1R26 MI07 SwingDG lR43 SOOlB STARTUPIC STARTUPID 2R26 M108 M109!

~~~wc~~c~cw~ HH_HcH~~~~j

-I

-I r m O(f)

Oz

.....>eo 0

~Cl)

.j:::.~r I'"""'

en m >>

IN aZZ

.....>e

0

.....>e-l-l N

CP-Im

.j:::.

b_"

<"' (f)

COr" a

mmI

.....>e a"">>

CP a

-I

~ <

0 CO 0

I

~

r o

-I o

~

~>>g m-lO O~I)

-10m

UI~

~~-I rm-ZO O-iZ

~IN

~

~

r--o o

(.UO

.j:::.C (f)~

Om

'z

~-I

.j:::.z bc a~

'fco

.....>em

U
U~

<D

<.....>e

.....>e:=::CJl<.....>e O'

<D 0

-1)<0..... _

.....>e(Q Z

.....>e o.....>e