Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
ML09181000429 June 200908/14/2009 Notice of Meeting with Progress Energy to Discuss the Results of the Nrc'S Inspection of the Crystal River Power Plant License Renewal Program to Be Conducted July 27 - August 14, 2009, at the Crystal River SiteLicense Renewal
3F0609-04, Initial Exam 2009-301 General Correspondence10 June 2009Initial Exam 2009-301 General Correspondence
ML09042036210 June 2009Nuclear Generating Plant License Renewal ReviewLicense Renewal
NRC-2009-0234, FRN: General Notice. Biweekly Notice. Application and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations. Sholly Report for Fr Publication on June 16, 20095 June 2009FRN: General Notice. Biweekly Notice. Application and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations. Sholly Report for Fr Publication on June 16, 2009Safe Shutdown
Fuel cladding
Offsite Circuit
ML0915505785 June 2009FRN: General Notice. Biweekly Notice. Application and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations. Sholly Report for Fr Publication on June 16, 2009Safe Shutdown
Fuel cladding
Offsite Circuit
ML10132040131 May 2009093-89529, Environmental Support Document South Cooling Tower Laydown Area Citrus County, FloridaPower Uprate
ML09110005629 May 2009License Amendment, Issuance of Amendment Regarding the Revision of the Steam Generator Portion of the Technical Specifications to Replacement of the Steam GeneratorsOperational leakage
3F0509-05, NRC Correspondence Distribution List Update29 May 2009NRC Correspondence Distribution List Update
ML09149031429 May 2009Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the CompanyLicense Renewal
Power change
3F0509-09, Response to Request for Additional Information to License Amendment Request 307, Revision 0: Methodology for Rod Ejection Accident Analysis Under Extended Power Uprate Conditions29 May 2009Response to Request for Additional Information to License Amendment Request #307, Revision 0: Methodology for Rod Ejection Accident Analysis Under Extended Power Uprate ConditionsPower Uprate
Exclusive Use
Affidavit
TAC:MD954729 May 2009
3F0509-08, Third Ten-Year Inservice Inspection (ISI) Interval Relief Request 09-003-II, Revision 128 May 2009Third Ten-Year Inservice Inspection (ISI) Interval Relief Request #09-003-II, Revision 1VT-2
3F0509-06, Response to Request for Additional Information Regarding Relief Request 09-001-IT for the Inservice Testing Program27 May 2009Response to Request for Additional Information Regarding Relief Request 09-001-IT for the Inservice Testing Program
TAC:ME098727 May 2009
3F0509-07, License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information22 May 2009License Amendment Request #303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional InformationTornado Missile
ML09120041522 May 2009Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating PlantAging Management
License Renewal
3F0509-02, 2008 Annual Radiological Environmental Operating Report13 May 20092008 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML09132016512 May 2009Summary of Category 3 Public/Open House Meeting with Crystal River to Discuss Annual AssessmentOpen House
ML10139040011 May 2009E-mail from Paul Roberts, May 11, 2009, Transmitting Questions on Crystal River Unit 3 Plant Lift Extension (Note: There Are No Words in the Body of the E-mail)
ML10139039911 May 2009Attachment to E-mail from Paul Roberts, May 11, 2009, Questions on the Use of Carborundum Neutron Absorbing Material in the Spent Fuel Pool
ML09138002311 May 2009Response to Request for Additional Information for the Review of the License Renewal ApplicationSafe Shutdown
Internal Flooding
License Renewal
Turbine Missile
Recently irradiated fuel
Overspeed trip
ML0912708617 May 2009Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the CompanyLicense Renewal
ML0912602466 May 2009Corporate Notification Letter for Initial License Examination 2009-301
ML0914602574 May 2009Letter Preparation of an Supplemental Environmental Impact Statement (SEIS) for the Proposed Renewal of the Operating License for the Crystal River Unit 3 Nuclear Generating Plant (CR-3)License Renewal
ML0914602614 May 2009Nuclear Generating Plant License Renewal Application Review, Levy County
IR 05000302/200900230 April 2009IR 05000302-09-002; 01/01/2009-03/31/2009; Crystal River Unit 3; Problem Identification and Resolution; Follow-up of Events and Notices of Enforcement DiscretionFire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Scaffolding
Power change
ML09117016830 April 2009Withdrawal of License Amendment Request #310, Revision 0, Application to Adopt Technical Specifications Task Force Traveler 490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity.Power Uprate
TAC:ME073130 April 2009
ML09113061724 April 2009Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards ConsiderationsSafe Shutdown
Fitness for Duty
Shutdown Margin
Post Accident Monitoring
RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums23 April 2009Submittal of Evidence of Guarantee of Payment of Deferred PremiumsAffidavit
Press Release-II-09-026, NRC Schedules Open House to Answer Questions on 2008 Performance of Crystal River Nuclear Power Plant22 April 2009Press Release-II-09-026: NRC Schedules Open House to Answer Questions on 2008 Performance of Crystal River Nuclear Power PlantOpen House
3F0409-12, 2008 Individual Exposure Monitoring Report21 April 20092008 Individual Exposure Monitoring Report
3F0409-07, Submittal of 2008 Radioactive Effluent Release Report21 April 2009Submittal of 2008 Radioactive Effluent Release ReportProcess Control Program
ML09146026220 April 2009Response to NRC 04/13/2009 Letter Regarding Proposed Renewal of Florida Power Corp., Operating License for Crystal River, Unit 3License Renewal
ML09085017620 April 2009Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal ApplicationLicense Renewal
3F0409-03, Sea Turtle Mortality Report17 April 2009Sea Turtle Mortality Report
3F0409-05, Response to Request for Additional Information Regarding Relief Request 08-001-MX, Revision 016 April 2009Response to Request for Additional Information Regarding Relief Request #08-001-MX, Revision 0
ML09146026016 April 2009Transcript of Crystal River, Unit 3, Scoping Meeting: Evening Session, Thursday, April 16, 2009, Pages 1-41Aging Management
License Renewal
ML09146025916 April 2009Transcript of Crystal River, Unit 3, Scoping Meeting: Afternoon Session, Thursday, April,16, 2009, Pages 1-33Aging Management
License Renewal
Chernobyl
ML09146078516 April 2009Utility Element and Generalized Future Land Use Map Received for Gary W. Maidhof, Dept Director, Dept of Development Services, Citrus County, Gov'T at April 16, 2009, Scoping Meeting in Crystal River, Fl
3F0409-06, Withdrawal of License Amendment Request 310, Revision 014 April 2009Withdrawal of License Amendment Request #310, Revision 0Power Uprate
ML09036015613 April 2009Request for List of Protected Species and Essential Fish Habitat within the Area Under Evaluation for the Crystal River Unit 3 Nuclear Generating Station License Renewal Application ReviewLicense Renewal
ML09057040113 April 2009Request for Comments Concerning the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ReviewLicense Renewal
ML09040039213 April 2009Request for List of Protected Species within the Area Under Evaluation for the Crystal River Unit 3 Nuclear Power Station License Renewal Application ReviewLicense Renewal
ML09056058413 April 2009Request for List of Protected Species within the Area Under Evaluation for the Crystal River Unit 3 Nuclear Power Station License Renewal Application ReviewLicense Renewal
ML09055024413 April 2009Request for Comments Concerning the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ReviewLicense Renewal
ML09049074913 April 2009Request for Comments Concerning the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ReviewLicense Renewal
ML09056014010 April 2009License Renewal Application Review (Shpo No. LRP08-0040)License Renewal
3F0409-04, Attachment B Through E - Crystal River, Unit 3 - License Amendment Request 303, Revision 1, Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis.8 April 2009Attachment B Through E - Crystal River, Unit 3 - License Amendment Request #303, Revision 1, Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis.Safe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Tornado Generated Missile
Design basis earthquake
Earthquake
Turbine Missile