Request for List of Protected Species and Essential Fish Habitat within the Area Under Evaluation for the Crystal River Unit 3 Nuclear Generating Station License Renewal Application Review
ML090360156
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/13/2009
From: David Wrona
License Renewal Projects Branch 2
To: Crabtree R
US Dept of Commerce, National Marine Fisheries Service
Brittner, D. NRR/DLR/RPB2 415-3797
References
Download: ML090360156 (6)


Text

April 13, 2009 Dr. Roy E. Crabtree Regional Administrator Southeast Region National Marine Fisheries Service 263 13th Avenue, South St. Petersburg, FL 33701

SUBJECT:

REQUEST FOR LIST OF PROTECTED SPECIES AND ESSENTIAL FISH HABITAT WITHIN THE AREA UNDER EVALUATION FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION REVIEW

Dear Dr. Crabtree:

The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application submitted by Florida Power Corporation for the renewal of the operating license for Crystal River Unit 3 Nuclear Generating Plant (CR-3). CR-3 is located 35 miles southwest of Ocala, Florida. As part of the review of the license renewal application (LRA), the NRC is preparing a Supplemental Environmental Impact Statement (SEIS) under the provisions of Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51), the NRC regulation that implements the National Environmental Policy Act (NEPA) of 1969. The SEIS includes an analysis of pertinent environmental issues, including endangered or threatened species and impacts to marine resources and habitat. This letter is being submitted under the provisions of the Endangered Species Act of 1973, as amended, and the Fish and Wildlife Coordination Act of 1934, as amended, and the Sustainable Fisheries Act of 1996.

The proposed action is to renew the facility operating license for CR-3 for an additional 20 years beyond the expiration of the current operating license. The proposed action would include the use and continued maintenance of existing plant facilities and transmission lines. The Crystal River site covers approximately 4,738 acres, of which approximately 1,062 acres is industrial.

The area surrounding the site is characterized by approximately 3,676 acres consisting of four natural habitat types: salt marsh, hardwood hammock forest, pineland, and freshwater swamp.

CR-3 is equipped with a once-through open-cycle cooling system that withdraws cooling water from and discharges back into the intake canal. The intake system includes four pump bays with conventional traveling screens. The screens are rotated and washed every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Material from the screens is washed onto a trough and sluiced to a sump adjacent to the intake canal. CR-3 uses four circulating water pumps. The discharge from the once-through cooling systems of Units 1, 2, 3 is used as cooling tower makeup for Units 4 and 5. Units 1, 2, 4, and 5 are fossil fuel generating units.

R. Crabtree The Final Environmental Statement (Atomic Energy Commission, 1973) identifies two 500-kilovolt transmission lines that were built to connect CR-3 to the electric grid: (1) the Central Florida line terminating at the central Florida Substation and (2) the Lake Tarpon line terminating at the Lake Tarpon Substation. The lines are contained in a common corridor for the first 5.3 miles of corridor, then diverge, with the Central Florida line continuing east and the Lake Tarpon line angling southeast, continuing directly south, and turning southwest toward Tarpon Springs. The transmission corridors of interest are approximately 134 miles long and occupy approximately 2,440 acres. Both lines are owned and operated by Progress Energy. The corridors pass through low population areas that are primarily forest and agricultural land (Environmental Protection Agency, 1994). The lines cross numerous state and U.S. highways and the Withlacoochee, Pithlachascotee, and Anclote rivers. Corridors that pass through agricultural land generally continue to be used as such. Florida Power Corporation plans to maintain these transmission lines, which are integral to the larger transmission system, indefinitely. These transmission lines will remain a permanent part of the transmission system after CR-3 is decommissioned.

To support the SEIS preparation process and to ensure compliance with Section 7 of the Endangered Species Act, the NRC requests information on Federally-listed, proposed, and candidate species and critical habitat that may be in the vicinity of the Crystal River site. In addition, please provide any information you consider appropriate under the provisions of the Fish and Wildlife Coordination Act. Also in support of the SEIS preparation and to ensure compliance with Section 305 of the Magnuson-Stevens Fishery Conservation and Management Act, the NRC requests a list of essential fish habitat that has been designated in the vicinity of the Crystal River site.

On April 16, 2009, the NRC staff will hold two public license renewal and environmental scoping meetings at the Plantation Inn, 9301 W Fort Island Trail, Crystal River, FL 34429. The first session will convene at 2:00 p.m. and will continue until 5:00 p.m., as necessary. The second session will convene at 7:00 p.m., with a repeat of the overview portions of the meeting, and will continue until 10:00 p.m., as necessary. Additionally, the NRC staff will host informal discussions one hour before the start of the session. Once the draft SEIS is completed, your office will receive a copy of the draft SEIS along with a request for comments.

R. Crabtree The CR-3 LRA is available on the internet at http://www.nrc.gov/reactors/operating/licensing/renewal/applications/crystal/crystal-lra.pdf. If you have any questions concerning the NRC staff review of this LRA, please contact Elaine Keegan, Project Manager at 301-415-8517 or by e-mail at elaine.keegan@nrc.gov.

Sincerely,

\\RA Lisa Regner for \\

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosures:

1. Transmission System
2. Crystal River Site layout cc w/encls: See next page

ML090360156 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME SFigueroa DBrittner DWrona (LRegner for)

DATE 4/10/09 04/13/09 04/13/09

Letter to R. Crabtree from D. Wrona dated April 13, 2009 DISTRIBUTION:

SUBJECT:

REQUEST FOR LIST OF PROTECTED SPECIES AND ESSENTIAL FISH HABITAT WITHIN THE AREA UNDER EVALUATION FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION REVIEW HARD COPY:

DLR RF E-MAIL:

PUBLIC [or NON-PUBLIC, if applicable]

RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter RidsNrrPMRKuntz Resource RidsNrrPMDBrittner Resource AJones, OGC LLake, RII MSykes, RII TMorrissey, RII RReyes, RII

Crystal River Nuclear Plant, Unit 3 cc:

Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)

Florida Power Corporation P.O. Box 14042 St. Petersburg, FL 33733-4042 Mr. James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, FL 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Daniel R. Westcott Supervisor, Licensing & Regulatory Programs Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. David T. Conley Associate General Counsel II - Legal Dept.

Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Daniel L. Roderick Vice President, Nuclear Projects &

Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Robert J. Duncan II Vice President, Nuclear Operations Progress Energy Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Post Office Box 1551 Raleigh, NC 27602-1551