Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07327050730 June 2002WCAP-12655, Rev. 2, Emergency Diesel Generator Loading Study, Indiain Point Unit 2.Boric Acid
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Emergency Lighting
Fuel cladding
Offsite Circuit
Backfit
JPN-02-019, & James A. FitzPatrick Nuclear Power Plant Entergy Quality Assurance Program Manual13 June 2002& James A. FitzPatrick Nuclear Power Plant Entergy Quality Assurance Program Manual
ML02164036313 June 2002Letter Addressed to Mr. Robert Barrett Re Notice of Enforcement Discretion for Entergy Nuclear Regarding Indian Point Unit 3 (NOED No. 2002-01-02)Ultimate heat sink
Enforcement Discretion
Nondestructive Examination
NL-02-076, Licensee Amendment Request (LAR No. 02-008) - Revision to the Steam Generator Tube Surveillance Requirements for Eddy Current Inspection Probe Diameter in Technical Specifications13 June 2002Licensee Amendment Request (LAR No. 02-008) - Revision to the Steam Generator Tube Surveillance Requirements for Eddy Current Inspection Probe Diameter in Technical SpecificationsOperating Basis Earthquake
ML02157022213 June 2002Y20020156 - R. Warrington E-mail Request for the Shut Down of Indian Point Nuclear Generating Unit Nos. 2 and 3
NL-02-084, Response to Request for Additional Information Regarding One-Time Extension of Containment Integrated Leak Rate Test Frequency13 June 2002Response to Request for Additional Information Regarding One-Time Extension of Containment Integrated Leak Rate Test Frequency
CNRO-2002-00037, Entergy Nuclear Northeast, Response to NRC Request for Additional Information on Application for Exemption from Definition of Total Effective Dose Equivalent13 June 2002Entergy Nuclear Northeast, Response to NRC Request for Additional Information on Application for Exemption from Definition of Total Effective Dose EquivalentExemption Request
ML05073011912 June 2002Letter to President Bush from D. Greenland, Re Whb 317012
ML02164050011 June 2002Enclosure - NOED Request from Indian Point 3 Nuclear Power Plant, Dtd 06/11/2002. Provides Formal Documentation of Request for Enforcement Discretion Made by Entergy Nuclear Operations, Inc for Indian Point 3 Via Conference Calls of June 67Ultimate heat sink
Non-Destructive Examination
Enforcement Discretion
Through Wall Leak
ML02175046911 June 2002Request for Enforcement Discretion; Service Water SystemUltimate heat sink
Non-Destructive Examination
Enforcement Discretion
Through Wall Leak
ML02162015210 June 2002Attachments - Indian Point 3 Site Visit, CRDM Nozzle EvaluationBoric Acid
Packing leak
NL-02-081, Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures10 June 2002Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
ML02161019410 June 2002Site Visit Trip ReportBoric Acid
Non-Destructive Examination
ML0218400277 June 2002May 2002 Monthly Operating Report for Indian Point Unit 3
ML0218401365 June 2002Proposed Changes to Technical Specifications: Selective Adoption of Alternate Source Term and Incorporation of Generic Changes; TSTF-51, TSTF-68; & TSTF-312Fuel cladding
ML0216104055 June 2002Technical Specification Pages for Amendment 229 Fuel Storage Building Air Filtration System
ML0214400745 June 2002License Amendment Fuel Storage Building Air Filtration SystemProbabilistic Risk Assessment
TAC:MB39205 June 2002
ML0217107825 June 2002Emergency Response Activation Implementing ProceduresEarthquake
ML0218406024 June 2002Letter from the Secretary to the Parents Concerned About Indian Point Denying That Organization'S Motion for Reconsideration of the Secretary'S 3/28/2002 Denial of the Organization'S Petition to Reopen the Record
ML0215602804 June 2002Technical Specification Indian Point Unit 2
ML0213601594 June 2002Amendment Power Range Neutron Flux High Setpoint with Inoperable Main Steam Safety Valve (Tac mb3978)
ML0216403773 June 2002Proposed Changes to Technical Specifications: Relaxation of Pressure Water Level Requirements & Removal of One-Time Allowance for Station Battery ReplacementShutdown Margin
IR 05000247/200200931 May 2002IR 05000247-02-09, on 04/08/2002-18/2002; Dtd 5/31/02 Entergy Nuclear Generation Co, Indian Point 2 Nuclear Power Plant. Supplemental Inspection for One Degraded Cornerstone in a Strategic Performance Area (Mitigating Systems)Significance Determination Process
ML11348A28431 May 2002New York State (NYS) Pre-Filed Hearing Exhibit NYS000120, Goldman, C.J. Eto, and G. Barbose, California Customer Load Reductions During the Electricity Crisis: Did They Help to Keep the Lights on? (LBNL-49733) (May 2002) Excerpted: Abstract
ML12334A60631 May 2002Official Exhibit - NYS000120-00-BD01- Goldman, C.J. Eto, and G. Barbose, California Customer Load Reductions During the Electricity Crisis: Did They Help to Keep the Lights on? (LBNL-49733) (May 2002) Excerpted: Abstract (2002 Eto Paper)
NL-02-042, License Amendment Request (LAR-02-007),, Changes to Effectively Coordinate Indian Point Units 1 & 2 Programs30 May 2002License Amendment Request (LAR-02-007),, Changes to Effectively Coordinate Indian Point Units 1 & 2 Programs
NL-02-071, License Amendment Request (LAR-02-009), Changes to Facility Operating License No. DPR-26 to Reflect Enn/Ipec Reorganizations30 May 2002License Amendment Request (LAR-02-009), Changes to Facility Operating License No. DPR-26 to Reflect Enn/Ipec Reorganizations
ML02162051230 May 2002NRC Mtg with Entergy Ne on IP2 Fundamentals Improvement Plan Attendance Sheet
NL-02-075, Entergy Nuclear Northeast, Indian Point Nuclear Generating Unit 2, - Response to Request for Additional Information Regarding One-time Extension of Containment Integrated Leak Rate Test Frequency30 May 2002Entergy Nuclear Northeast, Indian Point Nuclear Generating Unit 2, - Response to Request for Additional Information Regarding One-time Extension of Containment Integrated Leak Rate Test FrequencyThrough-Wall Leak
ML02178055030 May 2002NRC Public Meeting Feedback Forms for Indian Point 2
ML02155045830 May 20021) 05/30/2002 Entergy Indian Point 2 Regulatory Performance Meeting Slides 2) 05/30/2002 NRC Region I Indian Point 2 Regulatory Performance Meeting Slides
ML02169012430 May 2002Request for License Amendment for 1.4% Measurement Uncertainty Recapture Power UprateSafe Shutdown
Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Time to boil
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Large early release frequency
Fuel cladding
Power change
Power Uprate
Measurement Uncertainty Recapture
ML02123036729 May 2002License Amendment, Credit for Soluble Boron and Burnup in Spent Fuel Pit
ML02155053329 May 2002List of Figures for Amendment No. 227, Indian Point, Unit 2Shutdown Margin
Earthquake
TAC:MB518127 May 2002
ML02169047727 May 2002Y20020156 - R. Warrington E-Mail Request for the Shutdown of Indian Point Nuclear Generating Unit Nos. 2 and 3
ML02144001224 May 2002Summary of Telephone Conference with Entergy Nuclear Operations Response to Bulletin 2002-01, Indian Point Unit Nos. 2 and 3Boric Acid
Non-Destructive Examination
TAC:MB455024 May 2002
ML02142028823 May 2002Order Modifying Licenses for Interim Safeguards and Security Compensatory Measures
ML02141026123 May 2002Addressee List - Order Modifying Licenses for Interim Safeguards and Security Compensatory Measures
ML02141033223 May 2002Issuance of Order for Interim Safeguards and Security Compensatory Measures for Indian Point Nuclear Generating Station, Unit 1
Press Release-I-02-040, NRC, Entergy to Discuss Performance Issues at Indian Point 222 May 2002Press Release-I-02-040: NRC, Entergy to Discuss Performance Issues at Indian Point 2
ML09078020122 May 2002Y20020166 - E-mail. Gregory Cwalina Re Emergency Plan in Westchester
TAC:MB533022 May 2002
ML02143001820 May 2002NRC Staff'S Response to Riverkeeper, Inc.'S Amended Petition for Leave to Intervene and Request for Hearing
ML02140030417 May 2002NRC Region I Public Meeting Feedback Annual Assessment Meeting Conducted by the NRC to Provide Nrc'S Annual Assessment of IP3 Performance
ML02137059517 May 2002RAI, One-Time Extension of Containment Integrated Leakage Rate Test Frequency
TAC:MB336316 May 2002
ML02134029616 May 2002G20010508 - Request for Licensee Comments on Proposed Director'S Decision Ltr Re 2.206 Petition for the Emergency Shutdown of Indian Point, Units 1, 2 and 3