Issuance of Order for Interim Safeguards and Security Compensatory Measures for Indian Point Nuclear Generating Station, Unit 1
ML021410332
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/23/2002
From: Collins S
Office of Nuclear Reactor Regulation
To: Kansler M
Entergy Nuclear Operations
Hickman, J B, NRR/DLPM/PDIV-2, 415-3017
Shared Package
ML021410366 List:
References
Download: ML021410332 (4)


Text

SAFEGUARDS INFORMATION May 23, 2002 Mr. Michael Kansler Sr. Vice President and Chief Operating Officer Indian Point Nuclear Generating Station, Unit 1 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

ISSUANCE OF ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES FOR INDIAN POINT NUCLEAR GENERATING STATION, UNIT 1

Dear Mr. Kansler:

The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued the enclosed Order that modifies the current license for your facility to require compliance with the specified interim safeguards and security compensatory measures. The Order applies to decommissioning nuclear power plants with spent fuel in the spent fuel pool. Addressees are listed in Attachment 1 to the enclosed Order. These interim compensatory measures are listed in Attachment 2 (contains Safeguards Information) to the enclosed Order. The Commission recognizes that you have voluntarily and responsibly implemented additional security measures following the events of September 11, 2001, however, in light of the current threat environment, the Commission concludes that the security measures should be embodied in an Order, consistent with the established regulatory framework. The Commission has determined that the current threat environment requires that the enclosed Order be effective immediately.

These actions are interim and the basis for the Order is the need to take prudent actions to address security requirements in the current threat environment. This Order does not obviate the need for licensees to continue to meet the objectives of Security Level III, described in NRC Information Notice 98-35, Threat Assessment and Consideration of Heightened Physical Protection Measures, and maintain the effectiveness of existing security measures taken in response to the events of September 11, 2001. The requirements will remain in effect pending notification from the Commission that a significant change in the threat environment has occurred, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs.

The enclosed Order calls for responses and actions within specified time frames.

NOTICE: Attachment 2 to the Order (Interim Compensatory Measures) contains "Safeguards Information." Upon separation of Attachment 2 to the Order, this letter, the enclosed Order, and Attachment 1 to the Order (Addressee List) are "DECONTROLLED."

SAFEGUARDS INFORMATION

Michael Kansler SAFEGUARDS INFORMATION With respect to the notices and submission required by Sections III.B and III.C of the Order, for any requirement of Attachment 2 that requires an analysis or is contingent upon completion of another requirement of Attachment 2, it will be a sufficient response if the licensee states in its twenty-day submission: (1) that completion of the requirement is dependent upon completion of an analysis or other requirement; (2) the expected date of completion of the analysis or other requirement; and (3) that upon such completion, the licensee will promptly submit the results of such analysis or inform the NRC of the completion of the other requirement and the actions thereafter proposed with respect to the requirement at issue, as well as the projected date of completion. No extension of time from the twenty-day requirement is necessary for such responses submitted within twenty days.

As a separate matter, if the licensee wishes to preserve its right to request a hearing on any requirement contingent upon completion of an analysis or other requirement, a request for an extension of time to request a hearing must be filed within twenty days of the date of this order in accordance with Section IV of the Order. Such a request may seek a reasonable period of time to request a hearing beyond the date that the staff informs the licensee whether the actions proposed and completion date for the requirement(s) contingent upon an analysis or other requirement are satisfactory.

Please contact your Project Manager to facilitate resolution of any issues related to compliance with the requirements in the enclosed Order, or if you have any other questions.

The enclosed Order has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No.50-003

Enclosures:

1. Order
2. Order Attachment 1 - Address List
3. Order Attachment 2 - Interim Compensatory Measures for High Threat Environment (Safeguards Information) cc w/Enclosure 1 and Attachment 1 only: See next page NOTICE: Attachment 2 to the Order (Interim Compensatory Measures) contains "Safeguards Information." Upon separation of Attachment 2 to the Order, this letter, the enclosed Order, and Attachment 1 to the Order (Addressee List) are "DECONTROLLED."

SAFEGUARDS INFORMATION

Michael Kansler SAFEGUARDS INFORMATION With respect to the notices and submission required by Sections III.B and III.C of the Order, for any requirement of Attachment 2 that requires an analysis or is contingent upon completion of another requirement of Attachment 2, it will be a sufficient response if the licensee states in its twenty-day submission: (1) that completion of the requirement is dependent upon completion of an analysis or other requirement; (2) the expected date of completion of the analysis or other requirement; and (3) that upon such completion, the licensee will promptly submit the results of such analysis or inform the NRC of the completion of the other requirement and the actions thereafter proposed with respect to the requirement at issue, as well as the projected date of completion. No extension of time from the twenty-day requirement is necessary for such responses submitted within twenty days.

As a separate matter, if the licensee wishes to preserve its right to request a hearing on any requirement contingent upon completion of an analysis or other requirement, a request for an extension of time to request a hearing must be filed within twenty days of the date of this order in accordance with Section IV of the Order. Such a request may seek a reasonable period of time to request a hearing beyond the date that the staff informs the licensee whether the actions proposed and completion date for the requirement(s) contingent upon an analysis or other requirement are satisfactory.

Please contact your Project Manager to facilitate resolution of any issues related to compliance with the requirements in the enclosed Order, or if you have any other questions.

The enclosed Order has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No.50-003

Enclosures:

1. Order
2. Order Attachment 1 - Address List
3. Order Attachment 2 - Interim Compensatory Measures for High Threat Environment (Safeguards Information) cc w/Enclosure 1 and Attachment 1 only: See next page NOTICE: Attachment 2 to the Order (Interim Compensatory Measures) contains "Safeguards Information." Upon separation of Attachment 2 to the Order, this letter, the enclosed Order, and Attachment 1 to the Order (Addressee List) are "DECONTROLLED."

SAFEGUARDS INFORMATION DISTRIBUTION (with enclosures 1 and 2 only):

PUBLIC SCollins/JJohnson VDricks JShea GHill (2)

OGC ACRS SECY PD Reading CHolden RGramm JMinns DJohnson TBergman BPlatchek Accession No. (Package) ML021410366 HMiller Accession No. (Cover Letter) ML021410332 Accession No. (Order) ML021420288 Accession No. (Order Attachment 1 - Address List) ML021410261 NRR-106

  • See Previous Concurrence OFFICE DLPM/PM DLPM//LA DLPM/SC DIPM/D OE NSIR/D NAME JHickman* DJohnson* SDembek* BBoger* FCongel* RZimmerman*

DATE 04/17/2002 04/17/2002 04/17/2002 04/18/2002 04/18/2002 04/22/2002 OFFICE OGC, NLO DLPM/D NRR/ADIP NRR/ADPT NRR/D NAME JGoldberg* JZwolinski* WBorchardt* BSheron* SCollins DATE 04/23/2002 04/23/2002 04/23/2002 04/24/2002 05/23/2002 OFFICIAL RECORD COPY

Indian Point Nuclear Generating Station, Unit 1 cc:

Mr. Jerry Yelverton Mr. John McCann Chief Executive Officer Manager, Nuclear Safety and Licensing Entergy Operations Indian Point Nuclear Generating Unit 2 1340 Echelon Parkway Entergy Nuclear Operations, Inc.

Jackson, MS 39213 295 Broadway, Suite 1 P.O. Box 249 Mr. Fred Dacimo Buchanan, NY 10511-0249 Vice President - Operations Entergy Nuclear Operations, Inc. Mr. John Kelly Indian Point Nuclear Generating Units 1 & 2 Director of Licensing 295 Broadway, Suite 1 Entergy Nuclear Operations, Inc.

P.O. Box 249 440 Hamilton Avenue Buchanan, NY 10511-0249 White Plains, NY 10601 Mr. Robert J. Barrett Ms. Charlene Faison Vice President - Operations Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

Indian Point 3 Nuclear Generating Unit 3 440 Hamilton Avenue 295 Broadway, Suite 3 White Plains, NY 10601 P. O. Box 308 Buchanan, NY 10511-0308 Mr. Harry P. Salmon, Jr.

Director of Oversight Mr. Lawrence G. Temple Entergy Nuclear Operations, Inc.

General Manager Operations 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 Senior Resident Inspectors Office, IP2 P.O. Box 249 U.S. Nuclear Regulatory Commission Buchanan, NY 10511-0249 P.O. Box 38 Buchanan, NY 10511 Mr. Dan Pace Vice President Engineering Regional Administrator, Region I Entergy Nuclear Operations, Inc. U.S. Nuclear Regulatory Commission 440 Hamilton Avenue 475 Allendale Road White Plains, NY 10601 King of Prussia, PA 19406 Mr. James Knubel Mr. John M. Fulton Vice President Operations Support Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 October 2001

Indian Point Nuclear Generating Station, Unit 1 cc:

Mr. William Flynn, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. J. Spath, Program Director New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Thomas Walsh Secretary - NFSC Entergy Nuclear Operations, Inc.

Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10595 October 2001