Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station7 December 2023Davis BesseCorrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station
L-23-092, Occupational Radiation Exposure Report for Year 202227 April 2023Davis BesseOccupational Radiation Exposure Report for Year 2022
ML23123A21226 January 2023Comanche PeakComment (2158) of Cynthia Jackson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2
ML15212A94615 July 2015Crystal RiverNon-Concurrence Process - Response to Crystal River, Unit 3, Defueled Technical Specifications
ML14227A1099 July 2014Byron
Braidwood
Bryron, Units 1 & 2 - Imposition of Facility-Specific Baskfit Compliance with Licensing Basis Plant Design Requirements
ML14063A17428 January 2014Byron
Braidwood
Making Non-Concurrence NCP-2013-014 Public Available
ML13267A0809 December 2013Byron
Braidwood
Reactor Systems Branch Safety Evaluation Input to Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 Measurement Uncertainty Recapture Power Update
ML0331601205 November 2003Indian PointHandwritten Note from C. Jackson to M. Lopez-Otin on Draft Statement W/O Notes
ML0336001282 July 2003Indian PointE-mail from Christopher Jackson to Vicki Bolling and Maria Lopez-Otin Re FEMA Insert
ML0104002188 February 2001Mtg W/ NEI Re Std Tech Specs - ML010400218
ML0104002598 February 2001Mtg W/ NEI Re 10 CFR 72.48.... - ML010400259
ML0101004459 January 2001Mtg W/ NEI Re Standard Tech Specs for Dry Spent Fuel Storage Casks - ML010100445
ML20057E20629 September 1993Indian PointApplication for Amends to Licenses DPR-5 & DPR-26,revising Frequency of Radioactive Effluent Release Rept from Semiannual to Annual
ML20057E25829 September 1993Indian PointApplication for Amends to Licenses DPR-5 & DPR-26,changing TS to Clarify Administrative Control of High Radiation Area Keys
ML20011F0098 February 1990Comanche PeakCertifies That Util Covered for Decontamination Liability & Excess Property Insurance,Effective on 900208
ML20082R55330 November 1983Indian PointRO 83-43:two Independent Nonautomatic,Motor Operated Isolation Valves on Containment Spray Pump Discharge Pipes Found Closed & Deenergized Instead of Open & Deenergized,As Required.Caused by Operator Error.Valves Opened
ML20081D55614 October 1983Indian PointPart 21 Rept Re Westinghouse Identifying Calibr Errors in Environ Qualification of Lot 4 Barton Transmitters.Impact Being Evaluated
ML20090H3625 October 1983Indian PointRo:On 831004,138-kV Station Auxiliary Power Supply Lost When Pilot Wire Receiver Relay Tripped.Cause Under Investigation. Supply Reestablished to All 6.9-kV Buses.Also Reported Per Part 21
ML20076G3031 August 1983Indian PointRo:On 830729,review of Log Sheets Determined Isolation Valve Seal Water Sys Violated Tech Specs.Corrective Action Taken to Assure Locally Indicated Pressure on Tank Maintained Per Tech Specs
ML20069A7782 March 1983Indian PointRo:On 830301,shaft Matl Found in Square Motor Housing RHR Pump 22 Was Carbon Steel Instead of Stainless Steel.Change Does Not Involve Unreviewed Safety Question Based on Use for Fewer than 24 Calender Months.Equipment Will Be Replaced
ML20071A69222 February 1983Indian PointSupplemental Testimony of La Cohen,Cw Jackson,G Liebler & Wa Monti Re Onsite Emergency Planning.Discusses Recent Enhancements to Alert/Notification & Backup Communication Sys.Certificate of Svc Encl.Related Correspondence
ML20083Q50914 February 1983Indian PointRO 83-003:on 830213,RCS Leakage from Packing on Valve 731 Exceeded Tech Spec Limit.Subsequent Analysis After Hot Shutdown Determined Leakage to Be within Tech Specs.Also Reported Per 10CFR21
ML20066G7699 November 1982Indian PointRo:On 821108,upper End Plug from One Fuel Rod Found Lodged Between Upper End Plugs of Adjacent Fuel Rods within Assembly.Affected Assembly Will Not Be Returned to Core for Cycle 6.Also Reportable Per Part 21
ML20063B65118 August 1982Indian PointRO 82-32:on 820817,steam Generator 22 Blowdown Outer Isolation Valve CV1215A Closed.Caused by Failure of 1315A Solenoid Valve.Jumper Installed in Instrument Air Sys to Establish Blowdown.Also Reportable Per Part 21
ML20054F5982 June 1982Indian PointRo:On 820601,contractor Employee Experienced Personal Exposure Rate of 8.6 Rem While Working in Spent Fuel Pool. Encl Withheld (Ref 10CFR2.790)
ML20051P5326 May 1982Indian PointRO 82-17:on 820505,air Conditioning Sys,Booster Fans for Filter Operation & Cooling Water Supply Declared Inoperable Due to Motor Failures.Also Reported Per Part 21
ML20042A66411 March 1982Indian PointRo:Operating Procedures Will Be Revised to Require Operability of Safeguards Equipment Necessary to Mitigate Steamline Break Transient Prior to Heating RCS Above 350 F from Cold Shutdown
ML20042A5688 March 1982Indian PointRO 82-009:on 820305,nitrogen Pressure in Boron Injection Tank Observed Below 90 Psig.Caused by Failure of Two Nitrogen Pressure Regulator Valves.Procedure Changed.Also Reported Per Part 21
ML20039G0685 January 1982ZimmerDirect Testimony of C Jackson Addressing ZAC-ZACK Contentions 20c(5) & 20e(6).Related Correspondence