ML20059L010 | 19 September 1990 | Provides Addl Response to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per .Corrective Action:Operations & Compliance Mgt Further Examined Event & Concluded That Trains Vc/Yc Inoperable Per Special Order | |
ML20059L009 | 18 September 1990 | Informs of Delay in Response to Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14.Delay Due to Ongoing Review | |
ML20059J712 | 14 September 1990 | Forwards Monthly Operating Rept for Aug 1990 for McGuire Nuclear Station Units 1 & 2 & Monthly Operating Status Rept for Jul 1990 | |
ML20059L549 | 14 September 1990 | Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld | |
ML20059L552 | 14 September 1990 | Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) | Affidavit |
ML20059K202 | 12 September 1990 | Submits Supplemental Response to Generic Ltr 89-14, Svc Water Sys Problems Affecting Safety-Related Equipment. Intake Structure Insp Program Developed.Procedures for Insp Implemented & Intake Structures Sampled & Analyzed | |
ML20065D467 | 11 September 1990 | Informs of Delay in Response to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per Commitment in | |
ML20064A803 | 10 September 1990 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-369/90-13 & 50-370/90-13.Corrective Actions:Procedures Dealing W/Fuel Handling Will Be Enhanced by Adding Sign Off to Sections Which Ref Fuel Handling in Tech Specs | |
ML20064A804 | 5 September 1990 | Notifies NRC of Mod to 890301 Response to Violations Noted in Insp Repts 50-413/86-18-01 & 50-414/86-18-01 Re Valves. All Valve Locking Mechanisms Would Be Installed by End of Unit 2 Refueling Outage (Approx Aug 1990) | |
ML20059G301 | 4 September 1990 | Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire | |
ML20064A574 | 4 September 1990 | Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) | |
ML20064A567 | 1 September 1990 | Advises That Corrective Actions Re Violation of Insp Rept 50-369/89-01 & 50-370/89-01 Will Be Completed by 910101 | |
ML20059D346 | 30 August 1990 | Forwards Semiannual Effluent Release Rept for First Half of CY90 & Revs to Process Control Program | Process Control Program |
ML20059G832 | 30 August 1990 | Withdraws 880726 Proposed Tech Spec Change,Clarifying Tech Spec 3/4.7.6 Re Emergency Power Requirements for Control Room Ventilation Sys | |
ML20059D201 | 27 August 1990 | Forwards Piedmont Municipal Power Agency , Authorizing Use of Annual Rept for NRC Docket Requirements | |
ML20059D244 | 24 August 1990 | Forwards Special Rept PIR-1-C90-0261 on 900725 Re Cathodic Protection Sys Failure to Pass Acceptance Criteria of 60-day Surveillance.Std Work Request Generated to Check Voltage Potential at Test Station TS-36 on Weekly Basis | |
ML20056B501 | 22 August 1990 | Responds to Violation Noted in Insp Repts 50-413/90-17 & 50-414/90-17.Corrective Actions:Review Will Be Conducted to Determine Category of Infrequently Run Procedures Needing Addl Verification Controls | |
ML20056B498 | 22 August 1990 | Responds to NRC Request for Addl Info Re General Relief Request for Pump Vibration Submitted 900315.Relief Request Changed to Insure Data Taken Over Range That Encompasses All Main Potential Noise Contributors | |
ML20059G914 | 22 August 1990 | Forwards Public Version of Revised Epips,Including Change 0 to RP/O/A/5700/01,Change 0 to RP/O/A/5700/02 & Change 0 to RP/O/A/5700/03 | |
ML20059D190 | 22 August 1990 | Responds to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Valves VC-1,VC-2,VC-3,VC-4, VC-9,VC-10,VC-11 & VC-12 Reopened Upon Discovery of VC-1 - VC-4 Being Closed & Procedure IP/0/13/3006/09 Revised | |
ML16259A239 | 22 August 1990 | Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo | |
ML20056B497 | 20 August 1990 | Clarifies Info Submitted in 871207 & s Re Steam Generator Tube Rupture Analysis Demonstration Runs. Demonstration Runs Met plant-specific Requirements in Section D to NRC SER on WCAP-10698 | |
ML20059B445 | 20 August 1990 | Requests That NRC Approval of Original Relief Request 89-02 Be Extended to Include Changes to Mods MG-22233 & MG-22243 as Described.Hydrostatic Testing Impractical Due to Inadequacy of Test Boundaries | Hydrostatic |
ML20059C120 | 20 August 1990 | Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement | |
ML20059B658 | 17 August 1990 | Responds to Violation Noted in Insp Repts 50-413/90-15 & 50-414/90-15.Corrective Actions:Present Methods of Testing Operability of CO2 Fire Protection Sys Will Be Evaluated by 910201 to Determine If Addl Testing Necessary | |
ML20059C159 | 17 August 1990 | Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld | |
ML20063Q095 | 15 August 1990 | Forwards Monthly Operating Rept for Jul 1990 for Catawba Nuclear Station Units 1 & 2 & Revised Rept for June 1990 | |
ML20063Q090 | 15 August 1990 | Forwards Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2 & Revised Rept for June 1990 | |
ML20059C123 | 15 August 1990 | Advises That Util Submitting Special Rept Re Valid Failure of Diesel Generator 2B Would Be Delayed Until 880229 Had Incorrect Ltr Date.Date of Ltr Should Have Been 880204 Instead of 880104.Corrected Ltr Encl | |
ML20063Q267 | 14 August 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo | |
ML20059C221 | 13 August 1990 | Forwards Revised Chapter 16, Selected Licensee Commitments Manual, to Plant Updated Fsar,Per 10CFR50.4 & 50.71.Manual Contains Commitments Which Require Control But Not Appropriate in Tech Specs | |
ML20063Q026 | 10 August 1990 | Forwards Rev 0 to Catawba Unit 2 Cycle 4 Core Operating Limits Rept, Per Tech Spec 6.9.1.9 | |
ML20063Q067 | 10 August 1990 | Submits Revised Response to Violations Noted in Insp Rept 50-413/90-09.Procedure to Verify Test Inputs Modified to Verify Dummy Input Signal to Channel RTD Circuit | |
ML20058N018 | 8 August 1990 | Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire | |
ML20063Q018 | 7 August 1990 | Confirms That Planned Corrective Actions Listed in Paragraph 3 of Insp Repts 50-369/90-10 & 50-370/90-10,appropriately Described | |
ML20081E160 | 1 August 1990 | Advises of Completion of 900330 Commitment Re Standing Work Request for Insp of Air Flow Monitors & Dampers,Per Violations Noted in Insp Rept 50-413/90-03 & 50-414/90-03 | |
ML20058P326 | 1 August 1990 | Forwards Public Version of Rev 26 to Station Directive 3.8.4, Onsite Emergency Organization | Potassium iodide |
ML20059K029 | 1 August 1990 | Forwards Comments on Reactor Operator & Senior Reactor Operator Written Exams Administered on 900730 | |
ML20058L181 | 1 August 1990 | Forwards Safety Evaluation of Large Break LOCA Event Reanalysis Per 10CFR50.46 Re Peak Clad Temp Increases | Stroke time |
ML20058L406 | 1 August 1990 | Forwards Rev 0 to Inservice Insp Rept Unit 1 McGuire 1990 Refueling Outage 6 | |
ML20056A954 | 1 August 1990 | Provides Final Response to NUREG-0737,Item II.D.1, Performance Testing of Safety Relief Valves. Util Will Change Seal Configuration for Existing Valves to Seal on Steam Medium & Install Continuous Drain for Loop Piping | |
ML20081E095 | 27 July 1990 | Forwards Decommissioning Financial Assurance Certification Rept for Duke Power Co,co-owner of Catawba Nuclear Station Units 1 & 2 | |
ML20055H974 | 26 July 1990 | Forwards end-of-cycle 3 Steam Generator Insp Rept.Nineteen Tubes Removed from Svc by Plugging W/Rolled Mechanical Plug | |
ML20055H523 | 24 July 1990 | Discusses co-licensee Relationship & Obligations Re Decommissioning Financial Assurance for Facilities | |
ML20056A157 | 23 July 1990 | Forwards Public Version of Change 0 to RP/0/A/5700/10 & Rev 25 to Section 18.2 of Radiation Protection Manual.W/ Dh Grimsley 900730 Release Memo | |
ML20055H457 | 19 July 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-413/90-11 & 50-414/90-11.Corrective actions:I-beams/ Hoists Rolled to Ends of Ice Condenser & Securely Located on Rails to Prevent Any Movement | |
ML20055H174 | 18 July 1990 | Withdraws 880527 & 0725 Amends Clarifying Requirements for Containment Pressure Control Sys | |
ML20055J344 | 17 July 1990 | Advises That Commitment Re Procedure IP/O/A/3190/01,per Violation in Insp Repts 50-413/90-06 & 50-414/90-06, Completed on 900619 | |
NLS9000259, Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes | 16 July 1990 | Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes | |
ML20055H413 | 16 July 1990 | Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04 | Earthquake Potassium iodide |