Issue date | Title | Topic | |
---|---|---|---|
ML20212J631 | 1 October 1999 | SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 | Incorporated by reference |
ML20217G372 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With | |
ML20212F083 | 23 September 1999 | Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval | Safe Shutdown VT-2 Incorporated by reference |
ML20212F476 | 23 September 1999 | Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively | |
ML20212C476 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With | |
ML20210L436 | 2 August 1999 | Cycle 9 12-Month SG Insp Rept | |
ML20210L445 | 31 July 1999 | Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept | |
ML20216E378 | 31 July 1999 | Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20210G663 | 28 July 1999 | Cycle 9 90-Day ISI Summary Rept | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20209H383 | 30 June 1999 | Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With | |
ML20211F903 | 30 June 1999 | Cycle 9 Refueling Outage | |
ML20196J852 | 28 June 1999 | Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) | Non-Destructive Examination Incorporated by reference |
ML20195K295 | 31 May 1999 | Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20206Q895 | 5 May 1999 | Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 | |
ML20206R503 | 30 April 1999 | Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With | |
ML20205P981 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20204C311 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20205B663 | 28 February 1999 | Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys | |
ML20203H738 | 18 February 1999 | Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions | Shutdown Margin |
ML20211A202 | 31 January 1999 | Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections | Weak link |
ML20198S730 | 31 December 1998 | Cycle 10 Voltage-Based Repair Criteria 90-Day Rept | |
ML20199G364 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20197J562 | 3 December 1998 | Unit 1 Cycle 9 90-Day ISI Summary Rept | Packing leak Hydrostatic |
ML20197K116 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20195F806 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With | |
ML20154H609 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20154H625 | 17 September 1998 | Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr | |
ML20153B088 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With | |
ML20239A063 | 27 August 1998 | SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2 | Backfit |
ML20236Y209 | 7 August 1998 | Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08 | Boric Acid Stroke time Hydrostatic Incorporated by reference Power-Operated Valves Scaffolding |
ML20237A441 | 31 July 1998 | Blended Uranium Lead Test Assembly Design Rept | Safe Shutdown Shutdown Margin Fuel cladding Power change |
ML20237B522 | 31 July 1998 | Monthly Operating Repts for July 1998 for Snp | |
ML20236P644 | 10 July 1998 | LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134 | |
ML20236R005 | 30 June 1998 | Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant | |
ML20249A898 | 31 May 1998 | Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 | |
ML20247L514 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant | |
ML20217K447 | 27 April 1998 | Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05 | Incorporated by reference |
ML20217E222 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant | |
ML20248L261 | 28 February 1998 | Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 | |
ML20202J791 | 31 January 1998 | Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 | |
ML20199J257 | 31 January 1998 | Cycle 9 Voltage-Based Repair Criteria 90-Day Rept | |
ML20199J244 | 29 January 1998 | Snp Unit 2 Cycle Refueling Outage Oct 1997 | |
ML20199F853 | 13 January 1998 | ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8 | |
ML20198M148 | 31 December 1997 | Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 | |
ML20199A293 | 31 December 1997 | Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 | |
ML20197J101 | 30 November 1997 | Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 | |
ML20199C295 | 13 November 1997 | LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns | |
ML20199C720 | 31 October 1997 | Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant | |
ML20198Q557 | 23 October 1997 | Rev 0 to, Sequoyah Nuclear Plant,Unit 2,Cycle 9,COLR |