 Issue dateTitleTopic
ML20217C91212 October 1999SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition ChangeShutdown Margin
Spiral reload
SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 September 1999Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20217F90930 September 1999Monthly Operating Repts for Sept 1999 for LaSalle County Stations,Units 1 & 2.WithCoast down
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212J05021 September 1999Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1Safe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 August 1999Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20212C45031 August 1999Monthly Operating Repts for Aug 1999 for LaSalle County Station,Units 1 & 2.WithCoast down
ML20210L8662 August 1999Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related MovsStroke time
SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 July 1999Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20210R06731 July 1999Monthly Operating Repts for July 1999 for LaSalle County Station,Units 1 & 2.WithZebra Mussel
Downpower
ML20210E96823 July 1999SER Accepting Amend 17 to License SNM-1227 for Siemens Power Corp
ML20210C1689 July 1999Seventh Refueling Outage ASME Section XI Summary ReptPacking leak
Hydrostatic
VT-2
SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 June 1999Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20209H15030 June 1999Monthly Operating Repts for June 1999 for LaSalle County Station,Units 1 & 2.WithZebra Mussel
Downpower
Coast down
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20195K14816 June 1999Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & SafetyStroke time
Incorporated by reference
SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 May 1999Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20195J78731 May 1999Monthly Operating Repts for May 1999 for LaSalle County Station,Units 1 & 2.WithZebra Mussel
Downpower
ML20209E14331 May 1999Cycle 8 COLR, for May 1999
ML20195B25919 May 1999Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood StationsOffsite Dose Calculation Manual
Process Control Program
ML20206L55411 May 1999Safety Evaluation Approving Amend to Include as Authorized Activity,Storage of Moderated Special Nuclear Matl in sea-land Containers Equipped with Storage Grids Fastened to Floor
SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with30 April 1999Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. withSafe Shutdown
Unanalyzed Condition
Hydrostatic
Battery sizing
Turbine Missile
Fuel cladding
Fire Protection Program
Flow Induced Vibration
SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With
ML20206N20730 April 1999Monthly Operating Repts for Apr 1999 for LaSalle County Station,Units 1 & 2.WithDownpower
ML20205Q52916 April 1999SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be MaintainedWeld Overlay
ML20205J6017 April 1999Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2
SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.WithSafe Shutdown
ML20205R27231 March 1999Monthly Operating Repts for Mar 1999 for LaSalle County Station,Units 1 & 2.WithDownpower
ML20205L84231 March 1999Rev 2 to EMF-96-125, LaSalle Unit 2 Cycle 8 Reload AnalysisAnticipated operational occurrence
Feedwater Controller Failure
Fuel cladding
ML20205L83031 March 1999Administrative Technical Requirements App B (Amend 26) LaSalle Unit 2 Cycle 8 COLR & Reload Transient Analysis Results, for Mar 1999
ML20205L83922 March 1999Rev 2 to 960103, Neutronics Licensing Rept for LaSalle Unit 2,Cycle 8Shutdown Margin
ML20205C56719 March 1999Simulator Four-Yr Certification ReptSafe Shutdown
ML20207D2341 March 1999Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205Reactor Vessel Water Level
Weld Overlay
Hydrostatic
VT-2
EVT-1
Liquid penetrant
Flow Induced Vibration
ML20204C81428 February 1999Monthly Operating Repts for Feb 1999 for LaSalle County Station,Units 1 & 2.WithDownpower
ML20204B15728 February 1999Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.WithShutdown Margin
SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With31 January 1999Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).WithSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Weld Overlay
Internal Flooding
Hydrostatic
Temporary Modification
Feedwater Controller Failure
Turbine Missile
Scaffolding
Flow Induced Vibration
ML20207C73731 December 1998Annual Rept for LaSalle County Station for Jan 1998 Through Dec 1998Loop seal
Packing leak
Fire Barrier
FLEX
Scaffolding
Downpower
ML20205D13131 December 19981998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2
ML20199E46031 December 1998Monthly Operating Repts for Dec 1998 for LaSalle County Station,Units 1 & 2.With
ML20205M70631 December 1998Unicom Corp 1998 Summary Annual Rept. with
SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With31 December 1998Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With
ML20198M90923 December 1998SER Supporting Processing of TVA Lead Test Assembly
ML20198B38014 December 1998SER Accepting one-time Request for Relief from Certain Provisions of Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a for Certain Plant Safety/Relief Valves
ML20206N2269 December 1998LER 98-S03-00:on 981116,protected Area Was Entered Without Current Authorization for Unescorted Access Due to Programmatic Deficiency Error.Changed Badge Control ProcessFitness for Duty
ML20196D96530 November 1998Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by LicenseeVT-2
ML20196C83930 November 1998Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1
ML20197K09830 November 1998Monthly Operating Repts for Nov 1998 for LaSalle County Station,Unts 1 & 2.WithDownpower
ML20196G12430 November 1998COLR for Quad Cities Unit 1 Cycle 16
ML20196C87330 November 1998Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 StationWeld Overlay