Issue date | Title | Topic | |
---|---|---|---|
ML20217C912 | 12 October 1999 | SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change | Shutdown Margin Spiral reload |
SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20217F909 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for LaSalle County Stations,Units 1 & 2.With | Coast down |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212J050 | 21 September 1999 | Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Earthquake |
SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20212C450 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for LaSalle County Station,Units 1 & 2.With | Coast down |
ML20210L866 | 2 August 1999 | Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20210R067 | 31 July 1999 | Monthly Operating Repts for July 1999 for LaSalle County Station,Units 1 & 2.With | Zebra Mussel Downpower |
ML20210E968 | 23 July 1999 | SER Accepting Amend 17 to License SNM-1227 for Siemens Power Corp | |
ML20210C168 | 9 July 1999 | Seventh Refueling Outage ASME Section XI Summary Rept | Packing leak Hydrostatic VT-2 |
SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20209H150 | 30 June 1999 | Monthly Operating Repts for June 1999 for LaSalle County Station,Units 1 & 2.With | Zebra Mussel Downpower Coast down |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20195K148 | 16 June 1999 | Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety | Stroke time Incorporated by reference |
SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20195J787 | 31 May 1999 | Monthly Operating Repts for May 1999 for LaSalle County Station,Units 1 & 2.With | Zebra Mussel Downpower |
ML20209E143 | 31 May 1999 | Cycle 8 COLR, for May 1999 | |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |
ML20206L554 | 11 May 1999 | Safety Evaluation Approving Amend to Include as Authorized Activity,Storage of Moderated Special Nuclear Matl in sea-land Containers Equipped with Storage Grids Fastened to Floor | |
SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with | 30 April 1999 | Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with | Safe Shutdown Unanalyzed Condition Hydrostatic Battery sizing Turbine Missile Fuel cladding Fire Protection Program Flow Induced Vibration |
SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20206N207 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for LaSalle County Station,Units 1 & 2.With | Downpower |
ML20205Q529 | 16 April 1999 | SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained | Weld Overlay |
ML20205J601 | 7 April 1999 | Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 | |
SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | Safe Shutdown |
ML20205R272 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for LaSalle County Station,Units 1 & 2.With | Downpower |
ML20205L842 | 31 March 1999 | Rev 2 to EMF-96-125, LaSalle Unit 2 Cycle 8 Reload Analysis | Anticipated operational occurrence Feedwater Controller Failure Fuel cladding |
ML20205L830 | 31 March 1999 | Administrative Technical Requirements App B (Amend 26) LaSalle Unit 2 Cycle 8 COLR & Reload Transient Analysis Results, for Mar 1999 | |
ML20205L839 | 22 March 1999 | Rev 2 to 960103, Neutronics Licensing Rept for LaSalle Unit 2,Cycle 8 | Shutdown Margin |
ML20205C567 | 19 March 1999 | Simulator Four-Yr Certification Rept | Safe Shutdown |
ML20207D234 | 1 March 1999 | Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 | Reactor Vessel Water Level Weld Overlay Hydrostatic VT-2 EVT-1 Liquid penetrant Flow Induced Vibration |
ML20204C814 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for LaSalle County Station,Units 1 & 2.With | Downpower |
ML20204B157 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With | Shutdown Margin |
SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With | 31 January 1999 | Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Weld Overlay Internal Flooding Hydrostatic Temporary Modification Feedwater Controller Failure Turbine Missile Scaffolding Flow Induced Vibration |
ML20207C737 | 31 December 1998 | Annual Rept for LaSalle County Station for Jan 1998 Through Dec 1998 | Loop seal Packing leak Fire Barrier FLEX Scaffolding Downpower |
ML20205D131 | 31 December 1998 | 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 | |
ML20199E460 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for LaSalle County Station,Units 1 & 2.With | |
ML20205M706 | 31 December 1998 | Unicom Corp 1998 Summary Annual Rept. with | |
SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With | |
ML20198M909 | 23 December 1998 | SER Supporting Processing of TVA Lead Test Assembly | |
ML20198B380 | 14 December 1998 | SER Accepting one-time Request for Relief from Certain Provisions of Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a for Certain Plant Safety/Relief Valves | |
ML20206N226 | 9 December 1998 | LER 98-S03-00:on 981116,protected Area Was Entered Without Current Authorization for Unescorted Access Due to Programmatic Deficiency Error.Changed Badge Control Process | Fitness for Duty |
ML20196D965 | 30 November 1998 | Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee | VT-2 |
ML20196C839 | 30 November 1998 | Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 | |
ML20197K098 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for LaSalle County Station,Unts 1 & 2.With | Downpower |
ML20196G124 | 30 November 1998 | COLR for Quad Cities Unit 1 Cycle 16 | |
ML20196C873 | 30 November 1998 | Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station | Weld Overlay |