Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20206P150 | 5 January 1999 | LER 98-S03-00:on 981207,security Officer Discovered Uncontrolled Safeguards Info Drawing.Caused by Failure to Follow Established Procedures & Policies.Drawing Was Controlled by Site Security.With | Time of Discovery |
ML20216F993 | 31 December 1998 | Piedmont Municipal Power Agency 1998 Annual Rept | |
ML20198E638 | 17 December 1998 | LER 98-S02-00:on 981130,security Access Was Revoked Due to Falsification of Criminal Record.Individual Was Escorted from Protected Area & Unescorted Access Was Restricted. with | |
ML20153G460 | 30 September 1998 | USI A-46 Seismic Evaluation Rept, Vols 1-2 | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting Design basis earthquake Earthquake Scaffolding |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
ML15261A468 | 4 September 1998 | Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively | Safe Shutdown Probabilistic Risk Assessment Maintenance Rule Program |
ML20248F744 | 31 May 1998 | Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity | |
ML20247L904 | 31 December 1997 | 1997 Annual Rept for Duke Energy Corporation & Saluda River Electric Cooperative,Inc,Financial Statements as of Dec 1997 & 1996 Together W/Auditors Rept | |
RA-97-0258, LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review | 19 December 1997 | LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review | Time of Discovery |
ML20198J765 | 15 October 1997 | Safety Evaluation Accepting 10-yr Interval Insp Program Plan Alternatives for Listed Plants Units | VT-2 Incorporated by reference |
ML20211M649 | 8 October 1997 | Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted | |
ML20217Q275 | 30 June 1997 | CP&L Fitness for Duty Program Performance Data for Period 970101-0630 | Fitness for Duty Blind Performance Test |
ML20148S314 | 30 June 1997 | Ro:On 970422,Oconee Unit 2 Was Shut Down Due to Leak in Rcs. Leak Was Caused by Crack in Pipe to safe-end Weld Connection at RCS Nozzle for HPI Sys A1 Injection Line.Unit 1 Was Shut Down to Inspect Hpis Injection Lines & Implement Ldst Mods | |
ML20148H250 | 5 June 1997 | Safety Evaluation Accepting Proposed Restructuring of Util Through Acquisition Of,& Merger W/Panenergy Corp | |
ML20210E359 | 27 March 1997 | Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A | |
ML20134N712 | 20 February 1997 | Safety Evaluation Accepting Relief Request 96-04 for Plant | Hydrostatic |
ML20138L215 | 31 January 1997 | Monthly Operating Repts for Jan 1997 for Oconee Nuclear Station,Units 1,2 & 3 | |
ML20138L228 | 31 December 1996 | Revised Monthly Operating Repts for Dec 1996 for Oconee Nuclear Station,Units 1,2 & 3 | |
ML20133C123 | 23 December 1996 | Informs Commission of Staff Review of Request for License Amends from DPC to Perform Emergency Power Engineered Safeguards Functional Test on Three Oconee Nuclear Units | Shutdown Margin Time to boil |
ML20115F247 | 3 July 1996 | Part 21 Rept Re Piping (Small Portion of Unmelted Matl Drawn Lengthwise Into Bar During Drawing Process) Defect That Existed in Bar as Received from Mill.Addl Insp Procedure for Raw Matl Instituted | |
ML17353A434 | 31 October 1995 | Rev 1 to BAW-2245, Initial Rt of Linde 80 Welds Based on Fracture Toughness in Transition Range. | |
ML20107M893 | 31 October 1995 | Nonproprietary DPC Fuel Reconstitution Analysis Methodology | Anticipated operational occurrence Safe Shutdown Earthquake Earthquake Fuel cladding Affidavit Depleted uranium |
ML14183A695 | 18 September 1995 | Safety Evaluation Approving Relocation of Technical Support Ctr | |
ML17264A118 | 31 July 1995 | Response to Part (1) of GL 92-01,Rev 1,Suppl 1. | |
ML20086M085 | 29 June 1995 | DPC TR QA Program | Fitness for Duty Non-Destructive Examination Coatings Nondestructive Examination License Renewal Commercial Grade |
ML20077R363 | 31 December 1994 | Monthly Operating Repts for Dec 1994 for Bfnpp | |
ML20236L597 | 29 December 1994 | SER in Response to 940314 TIA 94-012 Requesting NRR Staff to Determine Specific Mod to Keowee Emergency Power Supply Logic Must Be Reviewed by Staff Prior to Implementation of Mod | Backfit |
ML20064L200 | 31 January 1994 | Final Rept EPRI TR-103591, Burnup Verification Measurements on Spent-Fuel Assemblies at Oconee Nuclear Station | |
ML20059H772 | 17 January 1994 | Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 | |
ML20062K748 | 1 December 1993 | ISI Rept for Unit 2 McGuire 1993 Refueling Outage 8 | |
ML20056E517 | 31 August 1993 | Technical Review Rept, Tardy Licensee Actions | |
ML20046C129 | 2 August 1993 | LER 93-007-00:on 930701,determined That Unit 1 Ssf Rc Makeup Sys Inoperable in Past Due to Design Deficiency.Operations Procedures Revised to Reflect Newly Calculated Operating Limits for Rc Makeup Pump,Rcps & RCS.W/930802 Ltr | |
ML20056G013 | 27 July 1993 | Rev 0 to ISI Rept Unit 2 Oconee 1993 Refueling Outage 13 | |
ML17352A869 | 31 May 1993 | Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. | Boric Acid Coatings Operating Basis Earthquake Tornado Missile Protection Earthquake |
ML20044G531 | 26 May 1993 | Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 | Stroke time |
ML20126J596 | 31 December 1992 | Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl | Hydrostatic |
ML20125C716 | 7 December 1992 | Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl | Stroke time Anchor Darling |
ML20117A598 | 23 November 1992 | Special Rept:On 921119,ability of Control Battery Racks to Withstand Seismic Event Could Not Be Confirmed & Batteries Declared Inoperable.Batteries Expected to Be Restored in TS Required Time | |
ML20127P586 | 23 November 1992 | Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl | |
ML20118B439 | 11 September 1992 | Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option | |
ML20097G042 | 31 May 1992 | Analysis of Capsule OCIII-D Duke Power Company Oconee Nuclear Station Unit-3 | Anticipated operational occurrence Hydrostatic Fuel cladding |
ML20077D067 | 15 November 1991 | Nonproprietary Version of Rev 0 to Boric Acid Corrosion of Oconee Unit 1 Upper Tubesheet | Boric Acid |
ML20079H157 | 30 September 1991 | Nonproprietary Evaluation of Revised Transfer to Cold Leg Recirculation Procedure,Hb Robinson Unit 2 | |
ML20086T295 | 14 June 1991 | Rev 1 to EQ Documentation Package Eqdp 36.0, Boston Insulated Wire Cable | Probabilistic Risk Assessment Temporary Modification Operability Determination Battery sizing Earthquake Commercial Grade Offsite Circuit Overspeed trip Manual Operator Action |
ML20086T286 | 8 March 1991 | Rev 1 to EQ Documentation Package Eqdp 11.1, Dekoron Instrumentation Cables | |
ML20086T256 | 8 March 1991 | Rev 1 to EQ Documentation Package 10.0, Continental Shielded Instrument Cable | |
ML20067A524 | 31 December 1990 | Final Submittal in Response to NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' | Operating Basis Earthquake Finite Element Analysis Code Reconciliation Commercial Grade Power change |
ML20065K697 | 31 October 1990 | Thermal Hydraulic Compatibility Analysis of Anf High Thermal Performance Fuel for Hb Robinson,Unit 2 | |
ML20065K696 | 31 October 1990 | Mechanical Licensing Rept for Hb Robinson High Thermal Performance Fuel Assemblies | Non-Destructive Examination Anticipated operational occurrence Hydrostatic Flow Induced Vibration |