 Issue dateTitleTopic
ML20217N43825 October 1999Safety Evaluation Supporting Amend 17 to License DPR-9
ML20217P35522 October 1999LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was ProvidedContraband
Stolen
NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With30 September 1999Monthly Operating Rept for Sept 1999 for Fermi 2.With
NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With31 August 1999Monthly Operating Rept for Aug 1999 for Fermi 2.With
NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With31 July 1999Monthly Operating Rept for July 1999 for Fermi 2.With
NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With30 June 1999Monthly Operating Rept for June 1999 for Fermi 2.With
NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with30 June 1999Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with
NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With31 May 1999Monthly Operating Rept for May 1999 for Fermi 2.With
ML20206J93010 May 1999SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate ValvesPower-Operated Valves
Backfit
ML20206G5085 May 1999Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of SafetyIncorporated by reference
NRC-99-0022, Monthly Operating Rept for Apr 1999 for Fermi 2.With30 April 1999Monthly Operating Rept for Apr 1999 for Fermi 2.With
ML20205Q71415 April 1999Safety Evaluation Supporting Amend 16 to License DPR-9
ML20205P97231 March 1999Monthly Operating Rept for Mar 1999 for Fermi 2
ML20204E03717 March 1999Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month PeriodIncorporated by reference
ML20204D03628 February 1999Monthly Operating Rept for Feb 1999 for Fermi 2
ML20198S3346 January 1999Safety Evaluation Supporting Amend 15 to License DPR-9
ML20207B74931 December 19981998 Annual Operating Rept for Fermi 2Deep Dose Equivalent
ML20205Q96231 December 1998Revised Monthly Operating Rept for Dec 1998 for Fermi 2
NRC-99-0005, Monthly Operating Rept for Dec 1998 for Fermi 2.With31 December 1998Monthly Operating Rept for Dec 1998 for Fermi 2.With
NRC-99-0021, 1998 Annual Financial Rept for Detroit Edison Co. with31 December 19981998 Annual Financial Rept for Detroit Edison Co. with
NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With30 November 1998Monthly Operating Rept for Nov 1998 for Fermi 2.With
NRC-98-0160, Monthly Operating Rept for Oct 1998 for Fermi 2.With31 October 1998Monthly Operating Rept for Oct 1998 for Fermi 2.With
ML20154R23321 October 1998Safety Evaluation Supporting Amend 13 to License DPR-9
ML20154L10314 October 1998Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling ModeForeign Material Exclusion
ML20154H81630 September 1998Rev 0 to COLR Cycle 7 for Fermi 2Safety Limit Minimum Critical Power Ratio
Abnormal operational transient
Fuel cladding
NRC-98-0139, Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With30 September 1998Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With
ML20153B88118 September 1998Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20151X06511 September 1998Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for PlantStroke time
Incorporated by reference
Power-Operated Valves
ML20153B79231 August 1998Rev 0 to Fermi 1 SarEarthquake
Fire Protection Program
NRC-98-0111, Monthly Operating Rept for Aug 1998 for Fermi 2.With31 August 1998Monthly Operating Rept for Aug 1998 for Fermi 2.With
ML20237E11725 August 1998Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam ProgramHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Scaffolding
ML20236X8615 August 1998SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2Finite Element Analysis
NRC-98-0109, Monthly Operating Rept for July 1998 for Fermi 231 July 1998Monthly Operating Rept for July 1998 for Fermi 2
ML20236K3261 July 1998SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2Finite Element Analysis
NRC-98-0127, Annual Rept for Period 970701-98063030 June 1998Annual Rept for Period 970701-980630
NRC-98-0097, Monthly Operating Rept for June 1998 for Fermi,Unit 230 June 1998Monthly Operating Rept for June 1998 for Fermi,Unit 2
NRC-98-0079, Monthly Operating Rept for May 1998 for Fermi 231 May 1998Monthly Operating Rept for May 1998 for Fermi 2
NRC-98-0076, Monthly Operating Rept for Apr 1998 for Fermi 230 April 1998Monthly Operating Rept for Apr 1998 for Fermi 2
NRC-98-0072, Monthly Operating Rept for Mar 1998 for Fermi 231 March 1998Monthly Operating Rept for Mar 1998 for Fermi 2
NRC-98-0050, Monthly Operating Rept for Feb 1998 for Fermi 228 February 1998Monthly Operating Rept for Feb 1998 for Fermi 2
NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 231 January 1998Monthly Operating Rept for Jan 1998 for Fermi 2
ML20198L4248 January 1998Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr IntervalStroke time
Incorporated by reference
NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company31 December 19971997 Annual Financial Rept for Detroit Edison Company
NRC-98-0015, Monthly Operating Rept for Dec 1997 for Fermi 231 December 1997Monthly Operating Rept for Dec 1997 for Fermi 2
ML20217N38231 December 1997Annual Operating Rept for 970101-1231
ML20205Q96031 December 1997Revised Monthly Operating Rept for Dec 1997 for Fermi 2
NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility23 December 1997Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility
ML20197A99215 December 1997Rev 0 to Efp,Unit 1 Fermi 1 SarHydrostatic
Earthquake
Fire Protection Program
Fatality
NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 230 November 1997Monthly Operating Rept for Nov 1997 for Fermi 2
NRC-97-0117, Monthly Operating Rept for Oct 1997 for Fermi 231 October 1997Monthly Operating Rept for Oct 1997 for Fermi 2