Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N438 | 25 October 1999 | Safety Evaluation Supporting Amend 17 to License DPR-9 | |
ML20217P355 | 22 October 1999 | LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided | Contraband Stolen |
NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Fermi 2.With | |
NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Fermi 2.With | |
NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Fermi 2.With | |
NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Fermi 2.With | |
NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with | 30 June 1999 | Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with | |
NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Fermi 2.With | |
ML20206J930 | 10 May 1999 | SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves | Power-Operated Valves Backfit |
ML20206G508 | 5 May 1999 | Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety | Incorporated by reference |
NRC-99-0022, Monthly Operating Rept for Apr 1999 for Fermi 2.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Fermi 2.With | |
ML20205Q714 | 15 April 1999 | Safety Evaluation Supporting Amend 16 to License DPR-9 | |
ML20205P972 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Fermi 2 | |
ML20204E037 | 17 March 1999 | Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month Period | Incorporated by reference |
ML20204D036 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Fermi 2 | |
ML20198S334 | 6 January 1999 | Safety Evaluation Supporting Amend 15 to License DPR-9 | |
ML20207B749 | 31 December 1998 | 1998 Annual Operating Rept for Fermi 2 | Deep Dose Equivalent |
ML20205Q962 | 31 December 1998 | Revised Monthly Operating Rept for Dec 1998 for Fermi 2 | |
NRC-99-0005, Monthly Operating Rept for Dec 1998 for Fermi 2.With | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Fermi 2.With | |
NRC-99-0021, 1998 Annual Financial Rept for Detroit Edison Co. with | 31 December 1998 | 1998 Annual Financial Rept for Detroit Edison Co. with | |
NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Fermi 2.With | |
NRC-98-0160, Monthly Operating Rept for Oct 1998 for Fermi 2.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Fermi 2.With | |
ML20154R233 | 21 October 1998 | Safety Evaluation Supporting Amend 13 to License DPR-9 | |
ML20154L103 | 14 October 1998 | Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode | Foreign Material Exclusion |
ML20154H816 | 30 September 1998 | Rev 0 to COLR Cycle 7 for Fermi 2 | Safety Limit Minimum Critical Power Ratio Abnormal operational transient Fuel cladding |
NRC-98-0139, Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With | |
ML20153B881 | 18 September 1998 | Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML20151X065 | 11 September 1998 | Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for Plant | Stroke time Incorporated by reference Power-Operated Valves |
ML20153B792 | 31 August 1998 | Rev 0 to Fermi 1 Sar | Earthquake Fire Protection Program |
NRC-98-0111, Monthly Operating Rept for Aug 1998 for Fermi 2.With | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Fermi 2.With | |
ML20237E117 | 25 August 1998 | Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Scaffolding |
ML20236X861 | 5 August 1998 | SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2 | Finite Element Analysis |
NRC-98-0109, Monthly Operating Rept for July 1998 for Fermi 2 | 31 July 1998 | Monthly Operating Rept for July 1998 for Fermi 2 | |
ML20236K326 | 1 July 1998 | SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2 | Finite Element Analysis |
NRC-98-0127, Annual Rept for Period 970701-980630 | 30 June 1998 | Annual Rept for Period 970701-980630 | |
NRC-98-0097, Monthly Operating Rept for June 1998 for Fermi,Unit 2 | 30 June 1998 | Monthly Operating Rept for June 1998 for Fermi,Unit 2 | |
NRC-98-0079, Monthly Operating Rept for May 1998 for Fermi 2 | 31 May 1998 | Monthly Operating Rept for May 1998 for Fermi 2 | |
NRC-98-0076, Monthly Operating Rept for Apr 1998 for Fermi 2 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Fermi 2 | |
NRC-98-0072, Monthly Operating Rept for Mar 1998 for Fermi 2 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Fermi 2 | |
NRC-98-0050, Monthly Operating Rept for Feb 1998 for Fermi 2 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for Fermi 2 | |
NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 2 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Fermi 2 | |
ML20198L424 | 8 January 1998 | Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr Interval | Stroke time Incorporated by reference |
NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company | 31 December 1997 | 1997 Annual Financial Rept for Detroit Edison Company | |
NRC-98-0015, Monthly Operating Rept for Dec 1997 for Fermi 2 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Fermi 2 | |
ML20217N382 | 31 December 1997 | Annual Operating Rept for 970101-1231 | |
ML20205Q960 | 31 December 1997 | Revised Monthly Operating Rept for Dec 1997 for Fermi 2 | |
NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility | 23 December 1997 | Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility | |
ML20197A992 | 15 December 1997 | Rev 0 to Efp,Unit 1 Fermi 1 Sar | Hydrostatic Earthquake Fire Protection Program Fatality |
NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 2 | 30 November 1997 | Monthly Operating Rept for Nov 1997 for Fermi 2 | |
NRC-97-0117, Monthly Operating Rept for Oct 1997 for Fermi 2 | 31 October 1997 | Monthly Operating Rept for Oct 1997 for Fermi 2 |