Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K462 | 30 January 1998 | Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Tva,Sequoyah Nuclear Plant,Units 1 & 2 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure boundary leak Through Wall Leak Scaffolding |
ML20092H128 | 31 August 1995 | Evaluation of Sequoyah Nuclear Plant Offsite Dose Calculation Manual,Rev 28 | Offsite Dose Calculation Manual |
ML20072T915 | 31 August 1994 | Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Sequoyah-1/-2, Technical Evaluation Rept | |
ML20087A526 | 31 December 1991 | Analysis of Bellows Expansion Joints in the Sequoyah Containment | Hydrostatic Finite Element Analysis Earthquake Flow Induced Vibration |
ML20085M386 | 24 October 1991 | Final Technical Evaluation Rept,Sequoyah Nuclear Plant, Units 1 & 2 Station Blackout Evaluation | Safe Shutdown |
ML20066D282 | 31 December 1990 | Evaluation of Severe Accident Risks: Sequoyah,Unit 1. Appendices | Time to boil Probabilistic Risk Assessment Fatality |
ML20066D273 | 31 December 1990 | Evaluation of Severe Accident Risks: Sequoyah,Unit 1.Main Report | Probabilistic Risk Assessment Earthquake Fatality Failure to Scram |
ML20066D265 | 31 December 1990 | Simplified Containment Event Tree Analysis for the Sequoyah Ice Condenser Containment | |
ML20059H459 | 31 July 1990 | Risk-Based Insp Guide for Sequoyah Nuclear Power Station Final Rept, Informal Rept | Shutdown Margin Probabilistic Risk Assessment |
ML20059A131 | 19 July 1990 | Mod 20,revising Contract to Purchase Addl Training Aids,To Use to TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20059A122 | 19 July 1990 | Notification of Contract Execution,Mod 20,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20043A368 | 30 April 1990 | Analysis of Core Damage Frequency: Sequoyah,Unit 1,INTERNAL Events | |
ML20043A281 | 30 April 1990 | Analysis of Core Damage Frequency: Sequoyah,Unit 1,INTERNAL Events Appendices | |
ML19332C992 | 30 November 1989 | Draft Risk-Based Insp Guide for Sequoyah Sequoyah Nuclear Power Station. | Shutdown Margin Probabilistic Risk Assessment |
ML20248E219 | 16 August 1989 | Mod 16,reflecting Return of Equipment to Tva,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20248E212 | 16 August 1989 | Notification of Contract Execution,Mod 16,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20247R394 | 16 May 1989 | Mod 15,extending Period of Performance,Providing Addl Work Re Training for NRC Inspectors & Supervisors,Changing NRC Project Officer & Adding TVA Project Manager & Increasing Contract Ceiling & Funding to Use of TVA Reactor.. | |
ML20247R385 | 16 May 1989 | Notification of Contract Execution,Mod 15,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn,For Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20245J926 | 31 March 1989 | TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Sequoyah Nuclear Plant Units 1 & 2, Technical Evaluation Rept | Loop seal Anticipated operational occurrence |
ML20154H327 | 23 August 1988 | Technical Evaluation Rept Re Requests for Relief,Pump & Valve Inservice Testing Program,Sequoyah Nuclear Plant, Units 1 & 2 | |
ML20196C164 | 4 February 1988 | Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 | |
ML20147C323 | 30 December 1987 | Requests for Relief,Pump & Valve Inservice Testing Program, Sequoyah Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | |
ML20236F347 | 18 September 1987 | Requests for Relief,Pump & Valve Inservice Testing Program, Sequoyah Nuclear Plant,Units 1 & 2, Technical Evaluation Rept | Stroke time Power-Operated Valves Power Operated Valves |
ML20237H069 | 10 August 1987 | Rev 1 to Technical Evaluation Rept of Dcrdr for Sequoyah Nuclear Power Plant Units 1 & 2 | Safe Shutdown Emergency Lighting |
ML20235T195 | 17 July 1987 | Evaluation of Nuclear Safety Review Staff Concerns Requiring Resolution Before & After Restart, Technical Evaluation Rept | |
ML20234D601 | 25 June 1987 | Errata to Analysis of Core Damage Frequency from Internal Events:Sequoyah,Unit 1, Forwarding Set of 39 Aperture Cards Which Should Have Been Included W/Original rept.W/39 Oversize Drawings | |
ML20214R148 | 29 May 1987 | Notification of Contract Execution,Mod 12,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20214R156 | 29 May 1987 | Mod 12,providing Incremental Funds & Increasing Ceiling,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20213H017 | 11 May 1987 | Conformance to Reg Guide 1.97 Sequoyah Nuclear Plant,Units 1 & 2 | Boric Acid |
ML20206G586 | 8 April 1987 | Notification of Contract Execution,Mod 11,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Brown Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20206G638 | 8 April 1987 | Mod 11,recognizing Administrative Changes Due to NRC Reorganization,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20215G278 | 23 March 1987 | TVA Sequoyah Electrical Medium Voltage Short Circuit Analysis Calculations, Final Technical Evaluation Rept | Safe Shutdown |
ML20214V486 | 28 February 1987 | Evaluation of Severe Accident Risks and the Potential for Risk Reduction:Sequoyah Power Station,Unit 1.Draft for Comment | Loop seal Probabilistic Risk Assessment Earthquake Backfit Fatality |
ML20214B241 | 28 February 1987 | Containment Event Analysis for Postulated Severe Accidents: Sequoyah Power Station,Unit 1.Draft Report for Comment | Probabilistic Risk Assessment Earthquake Failure to Scram |
ML20214B298 | 28 February 1987 | Analysis of Core Damage Frequency from Internal Events: Sequoyah,Unit 1 | Safe Shutdown Boric Acid Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment Failure to Scram |
ML20211E260 | 13 February 1987 | Notification of Contract Execution,Mod 10,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20211E296 | 13 February 1987 | Mod 10,providing Addl Work Entailing Training for NRC Inspectors & Supervisors,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry, Sequoyah & Bellefonte Simulators | Incorporated by reference |
ML20210G487 | 19 September 1986 | Notification of Contract Execution,Mod 9,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20210G557 | 19 September 1986 | Mod 9,providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20214T153 | 4 September 1986 | Mod 6,providing for Lease of Yellow Creek Model to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | Incorporated by reference |
ML20214T129 | 4 September 1986 | Notification of Contract Execution,Mod 6,to Use of TVA Reactor Simulator Facilities of Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20206H144 | 2 September 1986 | Direct Containment Heating Analysis W/Contain Computer Code, Ltr Rept | |
ML20215N428 | 31 August 1986 | Technical Evaluation Rept Re Welding Concern Program at TVA Sequoyah Units 1 & 2 | Backfit |
ML20206M120 | 15 August 1986 | Notification of Contract Execution,Mod 7,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20206M132 | 15 August 1986 | Mod 7,providing Cost Estimate for Leasing of Simulators for Extended Period of Performance,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on the Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20205D008 | 6 August 1986 | Mod 8,providing Incremental Funds,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators | |
ML20205C976 | 6 August 1986 | Notification of Contract Execution,Mod 8,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva | |
ML20206H081 | 9 May 1986 | Some Sensitivities for Direct Containment Heating Loads | |
ML20197J464 | 30 April 1986 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 | |
ML20136H603 | 23 December 1985 | Notification of Contract Execution,Mod 5,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva |