SNRC-1620, Suppl 15 to Startup Rept for Period 890501-080115 August 1989Suppl 15 to Startup Rept for Period 890501-0801Shutdown Margin
Fire Protection Program
SNRC-1597, Suppl 14 to Startup Rept for Period 890201-05011 May 1989Suppl 14 to Startup Rept for Period 890201-0501Shutdown Margin
Fire Protection Program
SNRC-1513, Suppl 12 to Startup Rept for Period Aug-Nov 19889 November 1988Suppl 12 to Startup Rept for Period Aug-Nov 1988Shutdown Margin
Fire Protection Program
SNRC-1484, Suppl 11 to Startup Rept for May-Aug 19883 August 1988Suppl 11 to Startup Rept for May-Aug 1988Shutdown Margin
Fire Protection Program
SNRC-1458, Suppl 10 to Startup Rept for Period 880201-0501,Shoreham Nuclear Power Station11 May 1988Suppl 10 to Startup Rept for Period 880201-0501,Shoreham Nuclear Power StationShutdown Margin
Fire Protection Program
ML20246H98730 April 1988Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1
ML20153G34825 November 1987Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept
ML20236Q07411 November 1987Suppl 8 to Startup Rept for Period 870801-1101Shutdown Margin
Fire Protection Program
SNRC-1357, Suppl 7 to Startup Rept for 870501-080111 August 1987Suppl 7 to Startup Rept for 870501-0801Shutdown Margin
Fire Protection Program
SNRC-1336, Suppl 6 to Shoreham Nuclear Power Station Startup Rept for Feb-May 198714 May 1987Suppl 6 to Shoreham Nuclear Power Station Startup Rept for Feb-May 1987
ML20211C2456 February 1987Suppl 5 to Startup Rept for 861115-870201Shutdown Margin
Fire Protection Program
ML20212Q95031 January 1987Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test
ML20215E46230 November 1986Voltage Study for Split Group Bus Configuration
ML20198A00115 May 1986Suppl 2 to Startup Rept for 860215-0515Shutdown Margin
Stroke time
Fire Protection Program
ML20195C77920 February 1986Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump)
ML20195C76020 February 1986Rev 1 to Seismic Instruments Channel Check
ML20210T52719 February 1986Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat)
ML20195C89418 February 1986Rev 2 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support)
ML20195C85218 February 1986Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg)
ML20195C76818 February 1986Rev 1 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump)
ML20195C87317 February 1986Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat). Related Documentation Encl
ML20195C86717 February 1986Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat)
SNRC-1234, Suppl 1 to Startup Rept for 851115-86021514 February 1986Suppl 1 to Startup Rept for 851115-860215Shutdown Margin
Stroke time
Fire Watch
ML20195C86014 February 1986Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation)
ML20195C7527 February 1986Rev 1 to Triaxial Seismic Switch Channel Calibr for D51-N150
ML20195C7397 February 1986Rev 1 to Triaxial Time-History Accelerograph Channel CalibrEarthquake
ML20137B48715 November 1985Shoreham Nuclear Power Station Startup Test ReptShutdown Margin
Fire Protection Program
ML20213G15226 September 1985Sanitized Version of Test Program on Isolation Relays & Analog Signal Isolators for Use in Hope Creek Generating Station. W/Three Oversize Drawings
ML20133N02127 August 1985Electrical Cable Separation Verification Testing
ML20099E65618 February 1985Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2Hydrostatic
ML20112J7194 February 1985Rev a to Qualification Rept for Model KDI-1000 High-Range Containment Area Radiation Detector & Mineral-Insulated Cable Sys
ML20104A96018 January 1985Reactor Vessel Cavity Seal Test ResultsHydrostatic
ML20198E74410 January 1985Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co
ML20100G3993 December 1984Tdi Emergency Diesel Generator 103 10 Cycle Confirmatory Test/Insp ReptSafe Shutdown
Nondestructive Examination
Liquid penetrant
ML20137Z82730 November 1984Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal SwitchEarthquake
ML20098F54430 September 1984Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip RestraintsFinite Element Analysis
ML20100N10931 August 1984Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept
ML20094C15112 July 1984Extension of Retainer Lifetime to 4 CyclesFlow Induced Vibration
ML20094G74530 April 1984Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints
ML20138P45519 April 1984Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201. Related Documentation EnclCoatings
ML20100N11531 March 1984Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept
ML20090J56023 March 1984Reactor Containment Bldg Integrated Leak Rate Test (Preoperational)
ML20080B26929 February 1984Diesel Generator Rocker Arm Lube Oil Temp Test Rept - SER Confirmatory Item 26 for Callaway & Item B.26 for Wolf Creek
ML20080U49331 January 1984Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station
ML20086P0641 December 1983Section 5.0, Startup Addenda, to Monthly Project Status ReptHydrostatic
ML20083G31522 November 1983Shoreham Diesel Generator Recovery ProgramSafe Shutdown
Breakaway torque
ML20079J69831 October 1983Field Test of Emergency Diesel Generator 101
ML20080C53915 October 1983Preliminary Rev 0 to Pre-Core Emergency & Auxiliary Feedwater Sys Test, Test Results Rept for 830503-0703Power Operated Valves
ML20080C5605 October 1983Preliminary Rev 0 to Pre-Core Instrumentation Correlation, Test Results Rept for 830516-0701
ML20080C45119 September 1983Preliminary Rev 0 to Pre-Core Chemical & Vol Control Sys Integrated Test, Test Results Rept for 830604-0704