SNRC-1620, Suppl 15 to Startup Rept for Period 890501-0801 | 15 August 1989 | Suppl 15 to Startup Rept for Period 890501-0801 | Shutdown Margin Fire Protection Program |
SNRC-1597, Suppl 14 to Startup Rept for Period 890201-0501 | 1 May 1989 | Suppl 14 to Startup Rept for Period 890201-0501 | Shutdown Margin Fire Protection Program |
SNRC-1513, Suppl 12 to Startup Rept for Period Aug-Nov 1988 | 9 November 1988 | Suppl 12 to Startup Rept for Period Aug-Nov 1988 | Shutdown Margin Fire Protection Program |
SNRC-1484, Suppl 11 to Startup Rept for May-Aug 1988 | 3 August 1988 | Suppl 11 to Startup Rept for May-Aug 1988 | Shutdown Margin Fire Protection Program |
SNRC-1458, Suppl 10 to Startup Rept for Period 880201-0501,Shoreham Nuclear Power Station | 11 May 1988 | Suppl 10 to Startup Rept for Period 880201-0501,Shoreham Nuclear Power Station | Shutdown Margin Fire Protection Program |
ML20246H987 | 30 April 1988 | Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 | |
ML20153G348 | 25 November 1987 | Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept | |
ML20236Q074 | 11 November 1987 | Suppl 8 to Startup Rept for Period 870801-1101 | Shutdown Margin Fire Protection Program |
SNRC-1357, Suppl 7 to Startup Rept for 870501-0801 | 11 August 1987 | Suppl 7 to Startup Rept for 870501-0801 | Shutdown Margin Fire Protection Program |
SNRC-1336, Suppl 6 to Shoreham Nuclear Power Station Startup Rept for Feb-May 1987 | 14 May 1987 | Suppl 6 to Shoreham Nuclear Power Station Startup Rept for Feb-May 1987 | |
ML20211C245 | 6 February 1987 | Suppl 5 to Startup Rept for 861115-870201 | Shutdown Margin Fire Protection Program |
ML20212Q950 | 31 January 1987 | Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test | |
ML20215E462 | 30 November 1986 | Voltage Study for Split Group Bus Configuration | |
ML20198A001 | 15 May 1986 | Suppl 2 to Startup Rept for 860215-0515 | Shutdown Margin Stroke time Fire Protection Program |
ML20195C779 | 20 February 1986 | Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) | |
ML20195C760 | 20 February 1986 | Rev 1 to Seismic Instruments Channel Check | |
ML20210T527 | 19 February 1986 | Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat) | |
ML20195C894 | 18 February 1986 | Rev 2 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support) | |
ML20195C852 | 18 February 1986 | Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg) | |
ML20195C768 | 18 February 1986 | Rev 1 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) | |
ML20195C873 | 17 February 1986 | Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat). Related Documentation Encl | |
ML20195C867 | 17 February 1986 | Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat) | |
SNRC-1234, Suppl 1 to Startup Rept for 851115-860215 | 14 February 1986 | Suppl 1 to Startup Rept for 851115-860215 | Shutdown Margin Stroke time Fire Watch |
ML20195C860 | 14 February 1986 | Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation) | |
ML20195C752 | 7 February 1986 | Rev 1 to Triaxial Seismic Switch Channel Calibr for D51-N150 | |
ML20195C739 | 7 February 1986 | Rev 1 to Triaxial Time-History Accelerograph Channel Calibr | Earthquake |
ML20137B487 | 15 November 1985 | Shoreham Nuclear Power Station Startup Test Rept | Shutdown Margin Fire Protection Program |
ML20213G152 | 26 September 1985 | Sanitized Version of Test Program on Isolation Relays & Analog Signal Isolators for Use in Hope Creek Generating Station. W/Three Oversize Drawings | |
ML20133N021 | 27 August 1985 | Electrical Cable Separation Verification Testing | |
ML20099E656 | 18 February 1985 | Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 | Hydrostatic |
ML20112J719 | 4 February 1985 | Rev a to Qualification Rept for Model KDI-1000 High-Range Containment Area Radiation Detector & Mineral-Insulated Cable Sys | |
ML20104A960 | 18 January 1985 | Reactor Vessel Cavity Seal Test Results | Hydrostatic |
ML20198E744 | 10 January 1985 | Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co | |
ML20100G399 | 3 December 1984 | Tdi Emergency Diesel Generator 103 10 Cycle Confirmatory Test/Insp Rept | Safe Shutdown Nondestructive Examination Liquid penetrant |
ML20137Z827 | 30 November 1984 | Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal Switch | Earthquake |
ML20098F544 | 30 September 1984 | Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip Restraints | Finite Element Analysis |
ML20100N109 | 31 August 1984 | Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept | |
ML20094C151 | 12 July 1984 | Extension of Retainer Lifetime to 4 Cycles | Flow Induced Vibration |
ML20094G745 | 30 April 1984 | Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints | |
ML20138P455 | 19 April 1984 | Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201. Related Documentation Encl | Coatings |
ML20100N115 | 31 March 1984 | Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept | |
ML20090J560 | 23 March 1984 | Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) | |
ML20080B269 | 29 February 1984 | Diesel Generator Rocker Arm Lube Oil Temp Test Rept - SER Confirmatory Item 26 for Callaway & Item B.26 for Wolf Creek | |
ML20080U493 | 31 January 1984 | Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station | |
ML20086P064 | 1 December 1983 | Section 5.0, Startup Addenda, to Monthly Project Status Rept | Hydrostatic |
ML20083G315 | 22 November 1983 | Shoreham Diesel Generator Recovery Program | Safe Shutdown Breakaway torque |
ML20079J698 | 31 October 1983 | Field Test of Emergency Diesel Generator 101 | |
ML20080C539 | 15 October 1983 | Preliminary Rev 0 to Pre-Core Emergency & Auxiliary Feedwater Sys Test, Test Results Rept for 830503-0703 | Power Operated Valves |
ML20080C560 | 5 October 1983 | Preliminary Rev 0 to Pre-Core Instrumentation Correlation, Test Results Rept for 830516-0701 | |
ML20080C451 | 19 September 1983 | Preliminary Rev 0 to Pre-Core Chemical & Vol Control Sys Integrated Test, Test Results Rept for 830604-0704 |