Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20210R358 | 13 August 1999 | Proposed Tech Specs Allowing Performance of CRDM & Ni Instrumentation Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling,while Fuel Is in Reactor Vessel | Shutdown Margin |
ML20210Q410 | 6 August 1999 | Proposed Tech Specs Section 3/4.6.4, Vacuum Relief, Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers & Revising Action Statements & Srs,Per NUREG-1433 | |
ML20209G358 | 14 July 1999 | Proposed Tech Specs Pages Re Amend to Licenses NPF-11 & NPF-18,revising TS Allowing LCS Units 1 & 2 to Operate at Uprated Power Level of 3489 Mwt | Process Control Program |
ML20209D393 | 7 July 1999 | Proposed Tech Specs,Changing Proposed Degraded Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable Value | |
ML20209D323 | 7 July 1999 | Proposed Tech Specs,Revising MCPR Safety Limits & Adding Approved Siemens Power Corp Methodology List of TRs for COLR | Anticipated operational occurrence Fuel cladding |
ML20206T140 | 19 May 1999 | Proposed Tech Specs Section 3/4.4.4, Chemistry, Relocating to UFSAR | Pressure Boundary Leakage |
ML20195E010 | 9 November 1998 | Proposed Tech Specs Re Application for Amends to Licenses NPF-11 & NPF-18,adding Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer | |
ML20195E054 | 9 November 1998 | Proposed Tech Specs Pages Re Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value to TS 3/4.3.3 & TS Table 3.3.3-2 | Safe Shutdown |
ML20154M464 | 16 October 1998 | Proposed Tech Specs,Lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect | Shutdown Margin Reactor Vessel Water Level Scram Discharge Volume Feedwater Controller Failure |
ML20217M667 | 1 May 1998 | Proposed Tech Specs Adding Ventilation Filter Testing Program | Ultimate heat sink |
ML20216E322 | 7 April 1998 | Proposed Tech Specs Pages Re Addition of Ventilation Filter Testing Program | |
ML20217J298 | 24 March 1998 | Proposed Tech Specs Deleting Unit 1 License Condition 2.C.(30)(a) in Entirety | |
ML20202C897 | 2 February 1998 | Proposed Tech Specs Re Changes to Relocate Fire Protection Requirements | Safe Shutdown Fire Barrier Hydrostatic Fire Protection Program |
ML20203G505 | 12 December 1997 | Proposed Tech Specs,Modifying Bypass Logic for Msli Valve Isolation Acuation Instrumentation on Condenser Low Vacuum | Reactor Vessel Water Level |
ML20199K548 | 24 November 1997 | Proposed Ts,Adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for Rwcs Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms & Eliminating RHR Sys Steam Condensing Mode Isolation Actuation Instrumentation | Reactor Vessel Water Level |
ML20211P933 | 15 October 1997 | Proposed Tech Specs Eliminating Unnecessary Detail from Accident Monitoring Instrumentation Surveillance Requirements | |
ML20217C377 | 26 September 1997 | Proposed Tech Specs Adding Ventilation Filter Testing Program | Reactor Vessel Water Level |
ML20216H771 | 4 September 1997 | Corrected TS Bases Sections B 3/4.2.1 & B 3/4.2.3 Re Thermal Limits | |
ML20216C638 | 29 August 1997 | Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates | Shutdown Margin Offsite Dose Calculation Manual Anticipated operational occurrence Fuel cladding |
ML20141J567 | 12 August 1997 | Proposed Tech Specs Surveillance Requirement 4.7.1.3.c Re Ultimate Heat Sink by Deletion of Sediment Deposition Insp in Lake Screen House | Ultimate heat sink |
ML20151K955 | 1 August 1997 | Proposed Tech Specs Changing Title of Site Quality Verification Director to Manager of Quality & Safety Assessment | Safe Shutdown |
ML20148U259 | 1 July 1997 | Proposed Tech Specs to Change Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases. TS Affected Are TS Definition 1.4,TS Tables 3/4.3.2-1 & 3/4.3.6-1 & Bases for TS 3/4.3.1 | Reactor Vessel Water Level Squib Scram Discharge Volume Fuel cladding |
ML20148Q430 | 1 July 1997 | Proposed Tech Specs Reflecting Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation & Unnecessary Challenges to ESF | Unanalyzed Condition |
ML20148N020 | 19 June 1997 | Proposed Tech Specs,Relocating Fire Protection Requirements | Safe Shutdown Fire Protection Program |
ML20141L037 | 27 May 1997 | Proposed Tech Specs,Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administrative Changes | Safe Shutdown Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Fire Protection Program |
ML20137W513 | 14 April 1997 | Proposed Tech Specs Re Feedwater/Main Turbine Trip Sys Actuation Instrumentation Design Change | Reactor Vessel Water Level Feedwater Controller Failure |
ML20134A193 | 20 January 1997 | Proposed Tech Specs 3/4.1.3.5 Re Control Rod Scram accumulators,3/4.4.4.3.2 Re Reactor Coolant Sys Operational leakage,3/4.5.1 Re ECCS - operating,3/4.5.3 Re ECCS, Suppression Chamber & 3/4.6.2.1 Re Suppression Chamber | Grab sample Pressure Boundary Leakage |
ML20135E684 | 2 December 1996 | Proposed Tech Specs,Requesting Amend to Section 3.4.2 to Revise SRV Configuration to Include Only 13 of Current 18 SRVs | Pressure Boundary Leakage |
ML20129J449 | 31 October 1996 | Proposed Tech Specs Re Elimination of Seismic Monitoring Instrumentation Requirements | Shutdown Margin Earthquake |
ML20129B798 | 14 October 1996 | Proposed Tech Specs 2.1.2 Re Thermal Power,High Pressure & High flow,5.3 Re Reactor core,4.0 Re Design features,3/4.1.3 Re Control Rods & 3/4.2.4 Re Linear Heat Generation Rate | Anticipated operational occurrence Overtravel Fuel cladding |
ML20116A960 | 15 July 1996 | Proposed Tech Specs Re Revision of App A,Ts for Licenses NPF-11 & NPF-18,relocating Fire Protection Requirements of Listed TS Sections | Safe Shutdown Fire Barrier Hydrostatic Emergency Lighting Safeguards Contingency Plan Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML20113C864 | 21 June 1996 | Proposed Tech Specs,Including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys | |
ML20107F064 | 16 April 1996 | Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements | Reactor Vessel Water Level Scram Discharge Volume Fuel cladding |
ML20107A864 | 8 April 1996 | Proposed Tech Specs for Siemens Power Corp Fuel Transition | Shutdown Margin Packing leak Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Feedwater Controller Failure Overtravel Fuel cladding Pressure Boundary Leakage Fire Protection Program Fire Watch |
ML20096G341 | 18 January 1996 | Proposed Tech Specs,Changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High | Reactor Vessel Water Level Offsite Dose Calculation Manual |
ML20095K697 | 21 December 1995 | Proposed Tech Specs,Deleting TS LCO 3.4.2 Action Statement B | Shutdown Margin Stroke time Pressure Boundary Leakage |
ML20093D442 | 2 October 1995 | Proposed TS Section 3.4.2,changing SRV Safety Valve Function Lift Setting Tolerance | |
ML20091P897 | 28 August 1995 | Proposed Tech Specs,Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits for Unit 2 | Squib Design basis earthquake Scram Discharge Volume Exemption Request Earthquake |
ML20084U307 | 8 June 1995 | Proposed Tech Specs Re Revised SRs & Administrative Requirements Associated W/Edgs | Safe Shutdown Offsite Circuit |
ML20084C249 | 23 May 1995 | Proposed Tech Specs,Clarifying Described Equipment out-of- Svc Options | Shutdown Margin Abnormal operational transient Feedwater Controller Failure Fuel cladding |
ML20083P640 | 19 May 1995 | Proposed Tech Specs,Revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days | |
ML20082J934 | 11 April 1995 | Proposed Tech Specs Re Extension of Specific Surveillance Intervals | |
ML20087H787 | 31 March 1995 | Proposed Tech Specs Section 3.4.2,revising SRV Safety Function Lift Setting Tolerances | |
ML20078H153 | 30 January 1995 | Proposed Tech Specs,Proposing One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS | Reactor Vessel Water Level Stroke time Power Operated Valves |
ML20077S304 | 13 January 1995 | Proposed Tech Specs Revising Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels | Fuel cladding |
ML20078R708 | 14 December 1994 | Proposed Tech Specs,Minimizing Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation in Reactor Protection,Isolation,Emergency Core Cooling,Recirculation Pump Trip & RCIC Sys | Shutdown Margin Reactor Vessel Water Level Scram Discharge Volume |
ML20078B957 | 24 October 1994 | Proposed Tech Specs Associated W/Exemption Requests from App J for LaSalle Unit 2 to Return to Cilrt Type a Test Schedule of Three Times in 10 Yrs & for LaSalle Units 1 & 2 to Decouple Cilrt Type a Test Schedule from ISI Schedule | Shutdown Margin Reactor Vessel Water Level Packing leak Offsite Dose Calculation Manual Stroke time Hydrostatic Squib Process Control Program Exemption Request Pressure Boundary Leakage |
ML20069J780 | 9 June 1994 | Proposed Tech Specs for Partial Implementation of GE ARTS Program | Shutdown Margin Offsite Dose Calculation Manual Abnormal operational transient Scram Discharge Volume Earthquake Fuel cladding |
ML20065A223 | 22 March 1994 | Proposed Tech Specs Re Deletion of Primary Containemnt Structural Integrity | Process Control Program Pressure Boundary Leakage |
ML20063F344 | 28 January 1994 | Proposed Tech Specs 3.3.1 & 3.3.4,extending Surveillance Test Interval from Monthly to Quarterly to Verify Proper Position of MSIV Limit Switches for RPS Instrumentation Operability | Reactor Vessel Water Level Fuel cladding |