Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With | 4 October 1999 | Rev 4 to Severe Weather Plan, Including Summary of Changes.With | High winds Temporary Modification |
ML20217A242 | 30 September 1999 | Proposed Tech Specs Removing Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow | |
ML20211Q236 | 8 September 1999 | Proposed Tech Specs 3/4.8.1,revised by Relocating 18-month Surveillance to Subject Sdg to Insps IAW Procedures Prepared in Conjunction with Mfg Recommendations to Section 3.8.1.1.4.8 of UFSAR | |
ML20211Q807 | 8 September 1999 | Proposed Tech Specs & Associated Bases for Specification 3/4.8.1, AC Sources, to Eliminate Requirement for Accelerated Testing of Standby DGs & Associated NRC Reporting Requirements | |
ML20211G228 | 24 August 1999 | Proposed Tech Specs Pages,Relocating Cycle Specific Operating Parameters from TSs to Colr,Including Moving Location of Insert 6 from Page 6-21 to Page 6-22 of Administrative Control Section & Renumbering Methods List | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20211C037 | 18 August 1999 | Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated with Replacement SGs | |
ML20210J048 | 28 July 1999 | STP Unit 1,Cycle 9 Startup Testing Summary Rept | |
ML20209G935 | 15 July 1999 | Proposed Tech Specs 3.7.1.6 Re Atmospheric Steam Relief Valves | |
ML20209H337 | 13 July 1999 | Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting | Condition Adverse to Quality |
ML20209H213 | 13 July 1999 | Rev 4,revised Pages 29 & 30 of 102 to Procedure 0ERP01-ZV-IN01, Emergency Classification | Earthquake |
ML20209G446 | 13 July 1999 | Proposed Tech Specs,Modifying 3.6.3 Action B,Clarifyin Use of Check Valve with Flow Through Valve Secured as Means to Isolated Affected Containment Penetrations | |
ML20209C151 | 1 July 1999 | Proposed Tech Specs Pages Re Amend to License NPF-80, Changing TSs 3.3.2 & 3.7.8 Allowing All Fuel Handling Bldg Exhaust Air Sys Components to Be Inoperable for Period of 8 Hours to Facilitate Repair of Train B Exhaust Booster Fan | Ultimate heat sink |
ML20209B534 | 24 June 1999 | Proposed Tech Specs Section 6.9.1.6.a,adding Min Measured RCS Flow,Which Lists Parameters Included in COLR | |
ML20209H315 | 23 June 1999 | Rev 4 to 0PGP02-ZA-0003, Comprehensive Risk Management | Probabilistic Risk Assessment |
ML20195E470 | 7 June 1999 | Proposed Tech Specs Pages Re Proposed Amend to Licenses NPF-76 & NPF-80,deleting Total Allowance,Sensor Error & Z Terms from ESFAS & RTS Instrumentation Trip Setpoint Tables of TS 2.2.1 & 3.3.2 | Anticipated operational occurrence |
ML20195E421 | 7 June 1999 | Proposed Tech Specs,Relocating cycle-specific RCS-related TS Parameter Limits to COLR | Anticipated operational occurrence Fuel cladding |
ML20209H308 | 1 June 1999 | Rev 3 to 0PGP04-ZA-0604, Probabilistic Risk Assessment Program | Probabilistic Risk Assessment Large early release frequency |
ML20205S351 | 19 April 1999 | Proposed Tech Specs Bases Page 3/4 8-3 Removing Reference to Fast Transfer Capability That Is Inconsistent with STP Design Bases as Described in UFSAR Chapters 8.2 & 8.3 | Anticipated operational occurrence Offsite Circuit |
ML20205G808 | 30 March 1999 | Proposed Tech Specs,Relocating Section 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 | Safe Shutdown Earthquake |
ML20204J968 | 22 March 1999 | Proposed Tech Specs Incorporating New TS for Atmospheric Steam Relief Valve Instrumentation & Revising TS 3.7.1.6 Re Atmospheric Steam Relief Valves | |
ML20204D158 | 15 March 1999 | Proposed Tech Specs 3/4.7.9 for Snubbers to TRM | High Radiation Area Offsite Dose Calculation Manual Process Control Program |
ML20207D965 | 2 March 1999 | Proposed Tech Specs Change Clarifies Use of Check Valve with Flow Through Valve Secured as Means to Isolate Containment Penetration in TS 3.6.3 Action B | |
ML20207C472 | 24 February 1999 | Proposed Tech Specs Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance | |
ML20202G687 | 26 January 1999 | Proposed Tech Spec Page 3/4 4-39,revising TS 4.4.10 for Alternate ISI of RCP Flywheels | |
ML20199K568 | 20 January 1999 | Proposed Tech Specs Surveillance Requirement 4.7.1.2.1.a Re AFW Pump Performance Testing | Safe Shutdown Loop seal Tornado Missile Earthquake |
ML20198A218 | 10 December 1998 | Revised TS Pages,Adding Ref to TS Figure 2.1-2 to Bases Section 2.1.1 as Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria | Fuel cladding |
ML20198A195 | 9 December 1998 | Corrected TS Bases Pages B 3/4 8-15,-16 & -17,as Discussed During 981103 Telcon | Battery sizing |
ML20196B812 | 23 November 1998 | Proposed Tech Specs Pages for Proposed Amends to Licenses NPF-76 & NPF-80,relocating Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section | |
ML20155J903 | 3 November 1998 | Proposed Corrected Tech Specs Bases 3/4 9-3 Re Water level- Refueling Cavity & Storage Pools | |
ML20155D544 | 29 October 1998 | Proposed Tech Specs Pages for Proposed Amend to Relocate Turbine Overspeed Protection TS 3/4.3.4 to TRM | Earthquake |
ML20155D556 | 29 October 1998 | Proposed Tech Specs Pages for Proposed Amends to Relocate Snubber TS 3/4.7.9 to TRM | High Radiation Area Ultimate heat sink Earthquake |
ML20155D580 | 29 October 1998 | Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM | |
ML20154M162 | 12 October 1998 | Revised Tech Specs Bases Pages B3/4 8-14 Through -17 | Battery sizing |
ML20154C005 | 30 September 1998 | Proposed Tech Specs Reflecting Replacement SG Tube Insp Surveillance Differences & Deleting Provision Allowing Use of F* Alternate Repair Criteria | Operating Basis Earthquake Pressure Boundary Leakage |
ML20154C507 | 30 September 1998 | Proposed Tech Specs Bases Page B 3/4 9-2,removing Wording Re 10% Value for Clad Gap Iodine Isotopics | |
ML20154A428 | 28 September 1998 | Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys | Ultimate heat sink |
ML20151T162 | 31 August 1998 | Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated W/Replacement SGs | |
ML20238F084 | 28 August 1998 | Proposed Tech Specs Section 4.0.5,excluding Specified Containment Isolation Valves from ISI & Testing Requirements as Stated in Section XI of ASME Boiler & Pressure Vessel Code | Large early release frequency |
ML20236T514 | 22 July 1998 | Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences | |
ML20236R146 | 15 July 1998 | Proposed Changes to Current Tech Specs Bases | |
ML20236L631 | 7 July 1998 | Proposed Tech Specs,Reflecting Rev of Criticality Analyses & Rack Utilization Schemes for Regions 1 & 2 of Spent Fuel Racks as Described in STP UFSAR & TSs | |
ML20236K348 | 6 July 1998 | Proposed Tech Specs,Relocating 3/4.7.13 Requirements for Area Temp Monitoring Sys to Technical Requirements Manual | Boric Acid Shutdown Margin Ultimate heat sink |
ML20236M638 | 6 July 1998 | Proposed Tech Specs,Relocating 3/4.3.3.3 Requirements for Seismic Instrumentation to Technical Requirements Manual | Safe Shutdown |
ML20236N000 | 6 July 1998 | Proposed Tech Specs,Relocating RCS Design Features from TS Section 5.4 to UFSAR | |
ML20247F332 | 7 May 1998 | Proposed Tech Specs Pages,Reflecting Replacement SG Reactor Coolant Flow Differences | Fuel cladding |
ML20217P144 | 2 April 1998 | Proposed Tech Specs 3.4.5 Re voltage-based Repair Criteria | |
ML20202H977 | 16 February 1998 | Proposed Tech Specs Pages,Implementing 1-volt voltage-based Repair Criteria for SG Tube Support plate-to-tube Intersections | Operating Basis Earthquake Earthquake |
ML20198C374 | 31 December 1997 | Proposed Tech Specs 2.1,2.2 & 3/4.2.5 for Alternate Operation W/Reduced Measured RCS Flow | |
ML20197A721 | 17 December 1997 | Proposed Tech Specs Pages,Revising TS 4.6.2.1 to Extend Surveillance Interval of Containment Spray Sys Nozzle Air Flow Test from Five Years to Ten Years | |
ML20199H208 | 20 November 1997 | Revised TS Bases Page B 3/4 4-15 |