 Issue dateTitleTopic
ML20184A2871 July 2020LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0
ML20150C88129 May 2020LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Flow Induced Vibration
ML20150C51729 May 2020LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Flow Induced Vibration
ML20133J91411 May 2020LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0
ML20099H0808 April 2020LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0Safe Shutdown
Earthquake
Fatality
ML20097F1926 April 2020Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0
ML20094H6743 April 2020LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0Probabilistic Risk Assessment
ML20072H3279 March 2020LLC - Public Meeting Presentation: Topic - Emergency Core Cooling System Boron (ECCS) Distribution, PM-0320-69218, Revision 0
ML20069A1635 March 2020ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0Fuel cladding
ML20069A9695 March 2020ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision OUltimate heat sink
ML20069A1544 March 2020ACRS Full Committee Presentation: NuScale Topical Report- Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0Fuel cladding
ML20066G2803 March 2020LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0Severe Accident Management Guideline
ML20066F46728 February 2020Enclosure 1: ACRS Subcommittee Presentation: NuScale FSAR Topic- Resolution of Chapter 15 Phase 2 Open Items, PM-0220-69062, Revision 0Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Exemption Request
ML20066G27728 February 2020ACRS Full Committee Presentation: NuScale - Steam Generator Design, PM-0220-69051, Revision 0
ML20054A96219 February 2020ACRS Subcommittee Presentation: NuScale Topical Report - Non-Loss-of-Coolant Accident, PM-0220-68852, Revision 0Fuel cladding
ML20054A40617 February 2020ACRS Subcommittee Presentation: NuScale Topical Report- Loss-of-Coolant Accident Evaluation Model, PM-0220-68917, Revision 0Ultimate heat sink
ML20054B63417 February 2020Nuscale - ACRS Subcommittee Presentation: NuScale Topical Report - Rod Ejection Accident Methodology, PM-1019-67365, Revision 0Fuel cladding
ML20035C7894 February 2020Nuscale - ACRS Subcommittee Presentation, FSAR, Steam Generator Design
ML19340B5916 December 2019Public Meeting - NuScale Incorporated by Reference (Ibr) SlidesIncorporated by reference
ML19324C83613 November 2019LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Source Term Methodology Application, PM-1119-67928, Revision 0Exemption Request
ML19192A16610 July 2019Presentation Entitled, Evaluation Methodology for Stability Analysis of the NuScale Power Module.
ML19169A16614 June 2019Mitigation of Beyond-Design-Basis-Events, NuScale FSAR Chapter 20, PM-0619-65964, Revision 0Safe Shutdown
ML19135A0649 May 2019LLC - Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale FSAR Chapter 21, Multi-Module Design Considerations, PM-0519-65533, Revision 0Ultimate heat sink
Probabilistic Risk Assessment
ML19105A13511 April 2019ACRS Presentation: NuScale Chapter 5, Reactor Coolant System and Connecting Systems Overview, PM-0419-65159, Revision 0Boric Acid
Ultimate heat sink
Non-Destructive Examination
Pressure Boundary Leakage
Flow Induced Vibration
ML19105A13110 April 2019Enclosuacrs Presentation: Chapter 4, Reactor Overview, PM-0419-65096, Revision 0Shutdown Margin
Anticipated operational occurrence
Flow Induced Vibration
ML19098A7802 April 2019LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems, PM-0319-64807, Revision 0Shutdown Margin
Ultimate heat sink
Nondestructive Examination
Overtravel
Earthquake
ML19073A04811 March 2019LLC - ACRS Presentation Chapter 10 - Steam and Power Conversion System, PM-0219-64501, Revision 1
ML19073A05111 March 2019ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 1Offsite Dose Calculation Manual
Process Control Program
ML19073A05311 March 2019Enclosure 1: ACRS Presentation Chapter 12 - Radiation Protection, PM-0219-64534, Revision 1High Radiation Area
ML19050A16320 February 2019Enclosure 1: ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 0Offsite Dose Calculation Manual
Process Control Program
ML19053A51819 February 2019Nuscale - Dhrs and ECCS Logic Changes, PM-0219-64563, Revision 0Post Accident Monitoring
ML19050A39813 February 2019Enclosure 1: ACRS Presentation Chapter 10 - Steam and Power Conversion System, PM-0219-64501, Revision 0
ML19045A30612 February 2019PM-0219-64475-NP, Revision 0, Reactor Vessel Flange Tool (Rft) Design Plan and Schedule.
ML19042A0735 February 2019Nuscale - Chapters 2 and 17 ACRS Full Committee, PM-0219-64333, Revision 0
ML19024A20423 January 2019ECCS Valve DCA Demonstration Testing, PM-0119-64160-NP, Revision 0Boric Acid
ML18360A17819 December 2018Enclosure 2: Presentation Titled, Addressing Component Fatigue for NuScale Dca.
ML18362A14219 December 2018Enclosure 2: Absorption Coefficient for Pool Water and Reactor Building Floor Interaction, PM-1218-63882, Revision 0
ML18347A20318 December 2018Enclosure 1: ACRS Presentation Chapter 17 - Quality Assurance and Reliability Assurance, PM-1218-63732, Revision 0Ultimate heat sink
ML18347A20718 December 2018ACRS Presentation Chapter 2 - Site Characteristics and Site Parameters, PM-1218-63753, Revision 0Tornado Generated Missile
ML19025A22118 December 2018Enclosure 2: Slides Titled, Basis for an Rft Stand COL Item, PM-1218-63892-NP, Revision 0, Non-Proprietary Version
ML18331A16020 November 2018Enclosure 2: Addressing Component Fatigue for NuScale DCA, November 20, 2018Operating Basis Earthquake
Flow Induced Vibration
ML18338A10314 November 2018Nuscale - LTC RAI Closure Plan, PM-1118-63594-NP, Revision 0, Nonproprietary Version
ML18235A31523 August 2018LLC - Presentation Materials Entitled ACRS Presentation: NuScale Instrumentation and Controls Design Overview, PM-0618-60212, Revision 0Mission time
ML18222A1938 August 2018Enclosure 1: NuScale Accident Source Terms Methodology Options PM-0818-61166, Revision 0
ML18213A1571 August 2018Risk-Informed Review of NuScale Initial Test Program, PM-0718-61123, Revision 0
ML18220A87425 July 2018Enclosunuscale CIRLT-RAI 9474
ML18156A1261 June 2018LLC Submittal of Presentation Materials Entitled, ACRS Presentation Chapter 8 Overview, for Use During a Public Meeting on June 6, 2018Post Accident Monitoring
Emergency Lighting
ML18156A12731 May 2018LLC Submittal of Presentation Materials Entitled NuScale Power Containment Leak Rate Test Program, PM-0518-59978, Revision 1Exemption Request
ML18116A44224 April 2018Enclosure 2: NuScale Power Comprehensive Vibration Assessment Program - Audit Report Summary Discussion, Revision 0, PM-0218-58803-NP (Non-Proprietary Version)
ML18037A6738 February 2018PM-0218-58480, Revision 0, Shutdown Capability of the NuScale Power Module.Shutdown Margin