Category:Letter
MONTHYEARML23234A1232024-03-28028 March 2024 US600 DC and SDA 50.46 Exemption - Letter ML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to NuScales EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 2024-03-28
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to NuScales EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20072H3272020-03-0909 March 2020 LLC - Public Meeting Presentation: Topic - Emergency Core Cooling System Boron (ECCS) Distribution, PM-0320-69218, Revision 0 ML20069A9692020-03-0505 March 2020 ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision O ML20069A1632020-03-0505 March 2020 ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1542020-03-0404 March 2020 ACRS Full Committee Presentation: NuScale Topical Report- Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2772020-02-28028 February 2020 ACRS Full Committee Presentation: NuScale - Steam Generator Design, PM-0220-69051, Revision 0 ML20054A9622020-02-19019 February 2020 ACRS Subcommittee Presentation: NuScale Topical Report - Non-Loss-of-Coolant Accident, PM-0220-68852, Revision 0 ML20054B6342020-02-17017 February 2020 Nuscale - ACRS Subcommittee Presentation: NuScale Topical Report - Rod Ejection Accident Methodology, PM-1019-67365, Revision 0 ML20054A4062020-02-17017 February 2020 ACRS Subcommittee Presentation: NuScale Topical Report- Loss-of-Coolant Accident Evaluation Model, PM-0220-68917, Revision 0 ML20035C7892020-02-0404 February 2020 Nuscale - ACRS Subcommittee Presentation, FSAR, Steam Generator Design ML19340B5912019-12-0606 December 2019 Public Meeting - NuScale Incorporated by Reference (Ibr) Slides ML19324C8362019-11-13013 November 2019 LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Source Term Methodology Application, PM-1119-67928, Revision 0 ML19204A2772019-07-22022 July 2019 Discussion Topic July 22, 2019 Public Meeting to Discuss Interface Requirement Associated with the NuScale Design Certification Application ML19190A0882019-07-0303 July 2019 LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation, NuScale FSAR Chapter 20, Mitigation of Beyond-Design-Basis Events, PM-0719-66189, Revision 0 ML19169A1662019-06-14014 June 2019 Mitigation of Beyond-Design-Basis-Events, NuScale FSAR Chapter 20, PM-0619-65964, Revision 0 ML19135A0642019-05-0909 May 2019 LLC - Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale FSAR Chapter 21, Multi-Module Design Considerations, PM-0519-65533, Revision 0 ML19134A0742019-05-0909 May 2019 LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale FSAR Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation, PM-0519-65372, Revision 0 ML19105A1352019-04-11011 April 2019 ACRS Presentation: NuScale Chapter 5, Reactor Coolant System and Connecting Systems Overview, PM-0419-65159, Revision 0 ML19098A7802019-04-0202 April 2019 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems, PM-0319-64807, Revision 0 ML19079A2382019-03-20020 March 2019 Enclosure 1: ACRS Presentation: NuScale Chapter 9, Auxiliary Systems, PM-0319-64807, Revision 0 ML19073A0482019-03-11011 March 2019 LLC - ACRS Presentation Chapter 10 - Steam and Power Conversion System, PM-0219-64501, Revision 1 ML19073A0512019-03-11011 March 2019 ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 1 ML19050A1632019-02-20020 February 2019 Enclosure 1: ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 0 ML19053A5182019-02-19019 February 2019 Nuscale - Dhrs and ECCS Logic Changes, PM-0219-64563, Revision 0 ML19045A3062019-02-12012 February 2019 PM-0219-64475-NP, Revision 0, Reactor Vessel Flange Tool (Rft) Design Plan and Schedule. ML19042A0732019-02-0505 February 2019 Nuscale - Chapters 2 and 17 ACRS Full Committee, PM-0219-64333, Revision 0 ML19024A2042019-01-23023 January 2019 ECCS Valve DCA Demonstration Testing, PM-0119-64160-NP, Revision 0 ML18362A1422018-12-19019 December 2018 Enclosure 2: Absorption Coefficient for Pool Water and Reactor Building Floor Interaction, PM-1218-63882, Revision 0 ML18347A2032018-12-18018 December 2018 Enclosure 1: ACRS Presentation Chapter 17 - Quality Assurance and Reliability Assurance, PM-1218-63732, Revision 0 ML18347A2072018-12-18018 December 2018 ACRS Presentation Chapter 2 - Site Characteristics and Site Parameters, PM-1218-63753, Revision 0 ML18331A1602018-11-20020 November 2018 Enclosure 2: Addressing Component Fatigue for NuScale DCA, November 20, 2018 ML18338A1032018-11-14014 November 2018 Nuscale - LTC RAI Closure Plan, PM-1118-63594-NP, Revision 0, Nonproprietary Version ML18235A3152018-08-23023 August 2018 LLC - Presentation Materials Entitled ACRS Presentation: NuScale Instrumentation and Controls Design Overview, PM-0618-60212, Revision 0 ML18222A1932018-08-0808 August 2018 Enclosure 1: NuScale Accident Source Terms Methodology Options PM-0818-61166, Revision 0 ML18213A1572018-08-0101 August 2018 Risk-Informed Review of NuScale Initial Test Program, PM-0718-61123, Revision 0 ML18220A8742018-07-25025 July 2018 Enclosunuscale CIRLT-RAI 9474 ML18205A3182018-07-24024 July 2018 NRC Staff Questions for the August 1, 2018 Public Meeting with NuScale on ITP ML18116A4422018-04-24024 April 2018 Enclosure 2: NuScale Power Comprehensive Vibration Assessment Program - Audit Report Summary Discussion, Revision 0, PM-0218-58803-NP (Non-Proprietary Version) ML18090A0032018-04-0202 April 2018 Handout for the April 2, 2018 Public Meeting to Discuss NuScale Plans to Respond to the NRC Staff RAIs Related to Sections 3.7 and 3.8 ML18085A0722018-03-26026 March 2018 NRC Staff Questions for April 9, 2018 Public Meeting with NuScale on DCA Chapter 20 ML18037A6732018-02-0808 February 2018 PM-0218-58480, Revision 0, Shutdown Capability of the NuScale Power Module. ML18019A1612018-01-23023 January 2018 LLC - Shutdown Capability of the NuScale Power Module ML18019A1632018-01-23023 January 2018 Source Term Revision, Revision 0, PM-0118-58201 2020-07-01
[Table view] Category:Slides and Viewgraphs
MONTHYEARML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to NuScales EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20072H3272020-03-0909 March 2020 LLC - Public Meeting Presentation: Topic - Emergency Core Cooling System Boron (ECCS) Distribution, PM-0320-69218, Revision 0 ML20069A1632020-03-0505 March 2020 ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A9692020-03-0505 March 2020 ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision O ML20069A1542020-03-0404 March 2020 ACRS Full Committee Presentation: NuScale Topical Report- Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066F4672020-02-28028 February 2020 Enclosure 1: ACRS Subcommittee Presentation: NuScale FSAR Topic- Resolution of Chapter 15 Phase 2 Open Items, PM-0220-69062, Revision 0 ML20066G2772020-02-28028 February 2020 ACRS Full Committee Presentation: NuScale - Steam Generator Design, PM-0220-69051, Revision 0 ML20054A9622020-02-19019 February 2020 ACRS Subcommittee Presentation: NuScale Topical Report - Non-Loss-of-Coolant Accident, PM-0220-68852, Revision 0 ML20054A4062020-02-17017 February 2020 ACRS Subcommittee Presentation: NuScale Topical Report- Loss-of-Coolant Accident Evaluation Model, PM-0220-68917, Revision 0 ML20054B6342020-02-17017 February 2020 Nuscale - ACRS Subcommittee Presentation: NuScale Topical Report - Rod Ejection Accident Methodology, PM-1019-67365, Revision 0 ML20035C7892020-02-0404 February 2020 Nuscale - ACRS Subcommittee Presentation, FSAR, Steam Generator Design ML19340B5912019-12-0606 December 2019 Public Meeting - NuScale Incorporated by Reference (Ibr) Slides ML19324C8362019-11-13013 November 2019 LLC Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Source Term Methodology Application, PM-1119-67928, Revision 0 ML19192A1662019-07-10010 July 2019 Presentation Entitled, Evaluation Methodology for Stability Analysis of the NuScale Power Module. ML19169A1662019-06-14014 June 2019 Mitigation of Beyond-Design-Basis-Events, NuScale FSAR Chapter 20, PM-0619-65964, Revision 0 ML19135A0642019-05-0909 May 2019 LLC - Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale FSAR Chapter 21, Multi-Module Design Considerations, PM-0519-65533, Revision 0 ML19105A1352019-04-11011 April 2019 ACRS Presentation: NuScale Chapter 5, Reactor Coolant System and Connecting Systems Overview, PM-0419-65159, Revision 0 ML19105A1312019-04-10010 April 2019 Enclosuacrs Presentation: Chapter 4, Reactor Overview, PM-0419-65096, Revision 0 ML19098A7802019-04-0202 April 2019 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems, PM-0319-64807, Revision 0 ML19073A0482019-03-11011 March 2019 LLC - ACRS Presentation Chapter 10 - Steam and Power Conversion System, PM-0219-64501, Revision 1 ML19073A0512019-03-11011 March 2019 ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 1 ML19073A0532019-03-11011 March 2019 Enclosure 1: ACRS Presentation Chapter 12 - Radiation Protection, PM-0219-64534, Revision 1 ML19050A1632019-02-20020 February 2019 Enclosure 1: ACRS Presentation Chapter 11 - Radioactive Waste Management, PM-0219-64543, Revision 0 ML19053A5182019-02-19019 February 2019 Nuscale - Dhrs and ECCS Logic Changes, PM-0219-64563, Revision 0 ML19050A3982019-02-13013 February 2019 Enclosure 1: ACRS Presentation Chapter 10 - Steam and Power Conversion System, PM-0219-64501, Revision 0 ML19045A3062019-02-12012 February 2019 PM-0219-64475-NP, Revision 0, Reactor Vessel Flange Tool (Rft) Design Plan and Schedule. ML19042A0732019-02-0505 February 2019 Nuscale - Chapters 2 and 17 ACRS Full Committee, PM-0219-64333, Revision 0 ML19024A2042019-01-23023 January 2019 ECCS Valve DCA Demonstration Testing, PM-0119-64160-NP, Revision 0 ML18360A1782018-12-19019 December 2018 Enclosure 2: Presentation Titled, Addressing Component Fatigue for NuScale Dca. ML18362A1422018-12-19019 December 2018 Enclosure 2: Absorption Coefficient for Pool Water and Reactor Building Floor Interaction, PM-1218-63882, Revision 0 ML18347A2032018-12-18018 December 2018 Enclosure 1: ACRS Presentation Chapter 17 - Quality Assurance and Reliability Assurance, PM-1218-63732, Revision 0 ML18347A2072018-12-18018 December 2018 ACRS Presentation Chapter 2 - Site Characteristics and Site Parameters, PM-1218-63753, Revision 0 ML19025A2212018-12-18018 December 2018 Enclosure 2: Slides Titled, Basis for an Rft Stand COL Item, PM-1218-63892-NP, Revision 0, Non-Proprietary Version ML18331A1602018-11-20020 November 2018 Enclosure 2: Addressing Component Fatigue for NuScale DCA, November 20, 2018 ML18338A1032018-11-14014 November 2018 Nuscale - LTC RAI Closure Plan, PM-1118-63594-NP, Revision 0, Nonproprietary Version ML18235A3152018-08-23023 August 2018 LLC - Presentation Materials Entitled ACRS Presentation: NuScale Instrumentation and Controls Design Overview, PM-0618-60212, Revision 0 ML18222A1932018-08-0808 August 2018 Enclosure 1: NuScale Accident Source Terms Methodology Options PM-0818-61166, Revision 0 ML18213A1572018-08-0101 August 2018 Risk-Informed Review of NuScale Initial Test Program, PM-0718-61123, Revision 0 ML18220A8742018-07-25025 July 2018 Enclosunuscale CIRLT-RAI 9474 ML18156A1262018-06-0101 June 2018 LLC Submittal of Presentation Materials Entitled, ACRS Presentation Chapter 8 Overview, for Use During a Public Meeting on June 6, 2018 ML18156A1272018-05-31031 May 2018 LLC Submittal of Presentation Materials Entitled NuScale Power Containment Leak Rate Test Program, PM-0518-59978, Revision 1 ML18116A4422018-04-24024 April 2018 Enclosure 2: NuScale Power Comprehensive Vibration Assessment Program - Audit Report Summary Discussion, Revision 0, PM-0218-58803-NP (Non-Proprietary Version) ML18037A6732018-02-0808 February 2018 PM-0218-58480, Revision 0, Shutdown Capability of the NuScale Power Module. 2020-07-01
[Table view] |
Text
L0-0419-64807 April 2, 2019 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Submittal of Presentation Materials Entitled "ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems," PM-0319-64807, Revision 0 The purpose of this submittal is to provide presentation materials to the NRC for use during the upcoming Advisory Committee on Reactor Safeguards (ACRS) NuScale Full Committee meeting on April 4, 2019. The materials support NuScale's presentation of Chapter 9, "Auxiliary Systems" of the NuScale design certification application.
The enclosure to this letter is the non proprietary version of the presentation entitled "ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems," PM-0319-64807, Revision 0.
This letter makes no regulatory commitments and no revisions to any existing regulatory commitments.
If you have any qu*estions, please contact Carrie Fosaaen at 541-452-7126 or at cfosaaen@nuscalepower.com.
Sine~~
~~
/z::;;;; Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Robert Taylor, NRC, OWFN-8H12 Michael Snodderly, NRC, TWFN-2E26 Samuel Lee, NRC, OWFN-8H12 Gregory Cranston, NRC, OWFN-8H12 Getachew Tesfaye, NRC, OWFN-8H12
Enclosure:
"ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems," PM-0319-64807, Revision 0 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360-0500 Fax 541.207.3928 www.nuscaleoower.com
L0-0419-64807
Enclosure:
"ACRS Full Committee Presentation: NuScale Chapter 9, Auxiliary Systems," PM-0319-64807, Revision 0 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360-0500 Fax 541.207.3928 www.nuscalepower.com
NuScale Nonproprietary ACRS Full Committee Presentation:
NuScale Chapter 9, Auxiliary Systems PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
w t:i.Y.f:i£~.~;~"
Template#: 0000-21727-F01 R5
Presentation Team Scott Harris Supervisor, Mechanical Systems
Refueling and Remote Handling Zackary Rad Director, Regulatory Affairs Zach Houghton Manager, Mechanical Design 2
PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
N~!:'.~.l;;~b.§.
Template#: 0000-21727-F01 R5
Reactor Building Crane
- Designed to ASME NOG-1 Type 1 (Meets NUREG-0554 requirements)
- Designed to be Seismic Category 1 (Required to withstand earthquake stress and retain load.)
- Movement uses redundant position control system interlocks
- RBC has augmented Quality Control per Part Ill of the QAPD (because of Risk Significance)
- Augmented requirements conform to regulatory requirements. (SRP 9.1.5, NUREG-0554, NUREG-0612, and RG 1.13)
- The RBC doesn't perform any functions that meet the regulatory definition of safety-*related.
3 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
i-1 f!!J.~"~-~-~g '
Template#: 0000-21727-F01 R5
RBC Control System
-"'. Hoist overtravel (upper limit switches, lower limit switches)
- Hoist overload
- Slack rope and Hoist drum rope mis-spooling
- Hoist overspeed
- Unbalanced load
- Reactor building crane-fuel handling machine (FHM) interlock
- Bridge and trolley overtravel limits
- Restricted handling path and speed (30 fUmin traverse, 2 fUmin hoist)
- Operator monitored 4
PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
Wt!!:l.~.~!h.r Template#: 0000-21727-F01 R5
RBC Control System
- Physical relay controlled - no software
- Cuts power to motors and brakes (stops motors, sets brakes)
- Independent of any controls used for normal operation
- Redundant Physical Load Control Systems
- Redundant gearboxes, cables, brakes on main hoist
- Redundant elements are all capable of performing their function individually at full load 5
PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
N~~.~-~~!..~.
Template#: 0000-21727-F01 R5
RBC Control System
- In the event of failure of load lift control system:
- Redundant upper travel limit switches
- Two-blocking capable (Hard upper limit doesn't damage RBC)
- Raise to top of travel - fuel still covered, shielding maintained, reactor module base is 29 feet above the floor
- In the event of a failure of travel control system:
- Traverse speed limited, operator monitors motion, speed is slow enough to enable operator to protect from impacts (30 ft/min)
- Energy absorbing hard stops, designed to protect in event of redundant limit switch failure (at end of travel for bridge and trolley) 6 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
Nt!!:l.~.f.!h~
- Template#: 0000-21727-F01 R5
Digital l&C Design and Development
- Design and development of any RBC software-based components follows a rigorous quality assurance program to ensure high quality and reliable operation based on the safety and risk significance.
- RBC Software Integrity Level (SIL)
- RBC is nonsafety-related, risk-significant which invokes SIL 3
- Independent verification and validation is required for SIL 3 and SIL 4 digital l&C.
- NuScale Digital l&C Software Quality Assurance Program described in DCA Section 7.2.1, and complies with ASME NQA-1-2008 and NQA-1a-2009 7
PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
W~!:'.~.fA~g .
Template#: 0000-21727-F01 R5
Initial Testing Program ASME NOG-1 and Other Required Controls Testing (from DCA Table 14.2-52 and 14.2-52a)
- Functional testing of controls and components
- Test speed limit at full load
- Brake function (redundant brakes for hoist and travel)
- Lowering speed limit and lowering brake test 8
PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
w ~!:'.~"~~b.§"
Template#: 0000-21727-F01 R5
Initial Testing Program Prerequisites
- Rated Load Test -ASME NOG Hoists (Main, Aux and Wet)
- Rated Load Test -ANSI N14.6 - MLA and NPM lift fixture
- Instrument Calibrations completed Component Testing
- Controls - interlocks and limits on RBC motion tested
- Loss of Control/Power or Seismic event - Results in no movement of bridge trolley, all hoists and brakes are set 9
PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
i-1 ~!!.li.~~b§"
Template#: 0000-21727-F01 RS
Initial Testing Program Component Testing (continued)
- Load Path Verification includes:
- speeds - max limits enforced
- bridge/trolley movement - toggles from full speed to microspeed when in proximity to reference locations - other NPMs or load path boundary
- Main hoist movement - elevation enforced and proximity
- Main hoist rotation
- Full seating of NPM in reactor bay receiver 10 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
N~!:)g:.~hg*
Template#: 0000-21727-F01 R5
ITAAC ITAAC 03.10.01
- ASME NOG-1 Inspection of main hoist machinery - redundant and non-redundant structural components - bridge, trolley, wire rope drum, hook, drive train, two-blocking and overload ITAAC 03.10.02 and 03.10.03
- ASME NOG-1 Inspection of aux and wet hoist machinery - same scope as ITAAC 03.10.01 ITAAC 03.10.04
- ASME NOG-1 main hoist Full Load (100o/o) and Rated Load (125°/o) testing ITAAC 03.10.05 and 03.10.06
- ASME NOG-1 aux and wet hoists Full Load and Rated Load testing 11 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
w !'!!:'.~.f~b.~.
Template#: 0000-21727-F01 R5
ITAAC ITAAC 03.10.07
- ANSI N 14.6 MLA single load path tested to 300°/o of Manufacturer's rating
- ANSI N14.6 MLA dual load path tested to 150°/o of Manufacturer's rating
Nti!:'.~-~.!.~~ .
Template#: 0000-21727-F01 R5
Pool Liner
- Protect concrete from the borated pool water.
- Collect pool leakage and direct to sumps.
e ow ** l o , u ll hcmo o, bnd Revision : 0 Copyright 2019 by NuScale Power, LLC .
Template#: 0000-21727-F01 R5
Pool Liner
- RXB floor slab is 1O feet of reinforced concrete
- RXB floor slab is capable of withstanding a module drop from maximum hook height without damaging the concrete in such as a way as to cause significant damage to RXB concrete
- Pool liner rupture would result in negligible loss from UHS inventory
- Flooding would fill gaps and channels between liner and RXB concrete 14 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
w ri!:'.~"~~-~g.
Template#: 0000-21727-F01 R5
Reactor Pool Mixing
- Spent Fuel Pool Cooling System
- 2x 1250 gpm pump & heat exchanger trains
- Reactor Pool Cooling System
- 3x 1250 gpm pump & heat exchanger trains
- Combined minimum operating flow (1 SFPCS / 1 RPCS)
- 3.6 Million gallons/ day (-7 Million gallon pool)
- Sample points on discharge of RPCS, SFPCS, and PCUS
- Conductivity monitors on outlet of RPCS, SFPCS, and PCUS
- Conductivity mismatch between systems could indicate a difference in boron concentration between pools 15 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
W~!:'.~"fA~~.
Template#: 0000-21727-F01 R5
Reactor Pool Mixing X = SAMPLING PO INT
- - 0 = CONDUCTIVITY INSTRUMENT RPCS ~o x-==-- ---- ,~==;;;;;;;;;:;;;;;11===~====;r=========;i II
..-----...----...----...--...--1-* ...----.. .--...---....
II 1, Dry Dock 000000 Refueling Pool Reactor Pool
...1 - .. 0000000 pa,JI~
- ..... 0000000 0000000 G 000000
,, 0000000 OOCJCJCJCJCJ CJ CJ CJ CJ CJ CJ CJ Vl u
c...
ooooc C]C]
LL Vl 16 PM-031 9-64807
e ow o, l o, ull hsmork;nd Revision : 0 Copyright 2019 by NuScale Power, LLC .
Template#: 0000-21727-F01 R5
Reactor Pool Mixing
- SR 3.1 .1 .1 (will use samples from RPCS to verify pool boron concentration) '
- Every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- SR 3.5.3.3
- And within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of> 15,000 gal 17 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
N~!:'.~.~-~-~.~ -
Template#: 0000-21727-F01 R5
Acronyms
- ANSI -American National Standards Institute
- NPM - NuScale Power Module
- ASME - American Society of Mechanical
- PCS - Plant Control System Engineers
- QAPD - Quality Assurance Program Description
- PCUS- Pool Cleanup System
- RBC - Reactor Building Crane
- DCA - Design Certification Application
- FHM - Fuel Handling Machine
- RPCS - Reactor Pool Cooling System
- l&C - Instrument and Control
- SFPCS - Spent Fuel Pool Cooling System
- ITAAC - Inspections, Tests, Analyses, and Acceptance Criteria
- SIL- Software Integrity Level
- MCS - Module Control System
- SR - Surveillance Requirement
- SRP - Standard Review Plan
- MLA - Module Lifting Adapter *
- TS - Technical Specification
w ~!:l.~.~~!.r Template#: 0000-21727-F01 R5
Portland Office Richland Office 6650 SW Redwood Lane, 1933 Jadwin Ave., Suite 130 Suite 210 Richland, WA 99354 Porlland, OR 97224 541.360.0500 971.371.1592 Arlington Office Corvallis Office 2300 Clarendon Blvd., Suite 1110 1100 NE Circle Blvd., Suite 200 Arlington, VA 22201 Corvallis, OR 97330 541.360.0500 London Office 1st Floor Porlland House Rockville Office Bressenden Place 11333 Woodglen Ave., Suite 205 London SW1 E 5BH Rockville, MD 20852 United Kingdom 301. 770.0472 +44 (0) 2079 321700 Charlotte Office 2815 Coliseum Centre Drive, Suite 230 Charlotte, NC 28217 980.349.4804 http://www. nuscalepower. com
~ Twitter: @NuScale_Power NUSCALE' Power for all humankind 19 PM-0319-64807 Revision: 0 Copyright 2019 by NuScale Power, LLC.
N~!:'.~.fA!::§'
Template#: 0000-21727-F01 R5