ML18360A178

From kanterella
Jump to navigation Jump to search
Enclosure 2: Presentation Titled, Addressing Component Fatigue for NuScale Dca.
ML18360A178
Person / Time
Site: NuScale
Issue date: 12/19/2018
From:
NuScale
To:
Office of New Reactors
Shared Package
ML18360A196 List:
References
AF-1218-63891, LO-1218-63890 PM-1218-63889-NP, Rev. 0
Download: ML18360A178 (14)


Text

L0-1218-63890 :

"Addressing Component Fatigue for NuScale DCA," PM-1218-63889, Revision 0, nonproprietary version NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360-0500 Fax 541.207.3928 www.nuscalepower.com

NuScale Nonproprietary Addressing Component Fatigue for NuScale DCA December 18, 2018 PM-1218-63889-NP Revision: O Copyright 2018 by NuScale Power, LLC.

N!:{!:'.?.~!br Template#: 0000-21727-F01 R4

Bounding Locations for Stress Analyses

((

w 2(a),(c) 2 PM-1218-63889-NP ~!:'.?.~~-~[ Revision: O Copyright 2018 by NuScale Power, LLC. Template#: 0000-21727-F01 R4

Current State of Calculations

  • The listed calculations are in varying states of completion.
           - Completed final calculations
           - Completed preliminary calculations
           - In progress calculations
  • Calculations consider loading combinations applicable to fatigue as required by the design specification.
  • Calculations consider applicable primary and secondary stresses (Level A & B).
  • Calculations are performed in accordance with Section 111 of the ASME Boiler and Pressure Vessel Code (2013 Edition) 3 PM-1218-63889-NP Revision: 0 Copyright 2018 by NuScale Power, LLC.

M  !:{!!,?,~~-~r Template#: 0000-21727-F01 R4

Completed Final Calculations

  • ECCS Valves

((

                                  }} 2(a),(c)
  • CROM Pressure Housing

((

                                    \
                                                                }} 2(a),(c) 4 PM-1218-63889-NP Revision: O          Copyright 2018 by NuScale Power, LLC.

w  !':1.!,J,i;"~"~b~ . Template#'. 0000-21727-F01 R4

Completed Prelim. Calculations

  • RPV Main Steam Plenum

((

                  }}2(a),(c)
  • RPV Feedwater Plenum

((

                                                                                     }}2(a),(c) 5 PM-1218-63889-NP Revision: 0                 Copyright 2018 by NuScale Power, LLC.

Mt:tl,l.l?.lt.~h~ - Template#*. 0000-21727-F01 R.4

Completed Prelim. Calculations

  • CNV Main Steam Nozzles

((

                     }}2(a),(c)
  • CNV Feedwater Nozzles

((

                  }}2(a),(c) 6 PM-1218-63889-NP Revision: O                    Copyright 2018 by NuScale Power, LLC.

N~!,'.?.~~-~.~. Template#*. 0000-21727-F01 R4

Completed Prelim. Calculations

  • eNV eves Nozzles

((

                                                                           }}2(a),(c) 7 PM-1218-63889-NP Revision: O           Copyright 2018 by NuScale Power, LLC.

i-1 ~\J.?.\:.1.~.~ . Template#: 0000-21727-F01 R4

Calculations in Progress

  • Calculations that have not been completed yet include:
         - RPV refueling flange
         - CNV refueling flange
         - DHRS Condenser
  • These calculations will use current inputs 8

PM-1218-63889-NP Revision: 0 Copyright 2018 by NuScale Power, LLC. M~!!.?.~1.t~r Template#: 0000-21727-F01 R4

Reactor Vessel Internals ((

                              }}2(a),(c) 9 PM-1218-63889-NP Revision: O      Copyright 2018 by NuScale Power, LLC.
-1 ti!:'.?I;~b.r Template#: 0000-21727-F01 R4

(( Reactor Vessel Internals 10 PM-1218-63889-NP Revision: 0 Copyright 2018 by NuScale Power, LLC. Template#: 0000-21727-F01 R4

Fatigue - Away from Process Lines ((

                                                                         }}2(a),(c) 11 PM-1218-63889-NP Revision: 0       Copyright 2018 by NuScale Power, LLC.

i-1 ~_l:',~"f"~"~~. Template#*. 0000-21727-F01 R4

Current Status

  • Ready to submit for audit:
           - CROM pressure housing (*4457)
           - ECCS Valves (*6306, *6230)
  • Schedule for remaining calculations (to be discussed at meeting):
           - RPV Main Steam Plenum (*2707)
           - CNV Main Steam Nozzles (*2822)
           - CNV Feedwater Nozzles (*2823)
           - RPV Feedwater Plenum (*2771)
           - CNV CVCS Nozzles (*2941)
           - RPV Refueling Flange (*5864)
           - CNV Refueling Flange (*5863)
           - DHRS Condenser (*3617) 12 PM-1218-63889-NP Revision: O                           Copyright 2018 by NuScale Power, LLC.

M~!J.?.~~.tr Template#: 0000-21727-F01 R4

Portland Office Richland Office 6650 SW Redwood Lane, 1933 Jadwin Ave., Suite 130 Suite 210 Richland, WA 99354 Portland, OR 97224 541. 360. 0500 971.371.1592 Arlington Office Corvallis Office 2300 Clarendon Blvd., Suite 1110 1100 NE Circle Blvd., Suite 200 Arlington, VA 22201 Corvallis, OR 97330 541.360.0500 London Office 1st Floor Portland House Rockville Office Bressenden Place 11333 Woodglen Ave., Suite 205 London SW1E 5BH Rockville, MD 20852 United Kingdom 301. 770.0472 +44 (0) 2079 321700 Charlotte Office 2815 Coliseum Centre Drive, Suite 230 Charlotte, NC 28217 980.349.4804 http://www. nuscalepower. com

                      ~   Twitter: @NuScale_Power NUSCALE' Power for all humankind 13 PM-1218-63889-NP Revision: O                                      Copyright 2018 by NuScale Power, LLC.

i-t ~!:'.?.f.~h.r Template#: 0000-21727-F01 R4}}