ML19024A204

From kanterella
Jump to navigation Jump to search
ECCS Valve DCA Demonstration Testing, PM-0119-64160-NP, Revision 0
ML19024A204
Person / Time
Site: NuScale
Issue date: 01/23/2019
From:
NuScale
To:
Office of New Reactors
References
LO-0119-64248 PM-0119-64160-NP, Rev 0
Download: ML19024A204 (13)


Text

L0-0119-64248 :

"ECCS Valve DCA Demonstration Testing," PM-0119-64160-NP, Revision 0, nonproprietary version NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360-0500 Fax 541.207.3928 www.nuscalepower.com

NuScale Nonproprietary ECCS Valve DCA Demonstration Testing NRC Update 1/23/19 Dan Lassiter - Engineering Greg Myers - Licensing PM-01_ 19-64160-NP Revision: 0 Copyright 2019 by NuScale Power, LLC.

w ~!:'.~"~~-~~"

Template#: 0000-21727-F01 R4

Acknow ledgeme nt & Disclaimer This material is based upon work supported by the Department of Energy under Award Number DE-NE0008820.

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

2 PM-0119-64160-NP Revision: 0 Copyright 2019 by NuScale Power, LLC.

M!!!:'.~.~~"'*~ .

Template#: 0000-21727-F01 R4

ECCS Valve DCA Demonstration Test

  • Obiectives:
  • - Demonstrate main valve functionality at operating temperature and pressure fluid conditions
  • Criteria: Moving to fully open position when actuated below IAB release

- Demonstrate IAB functionality at operating temperature and pressure fluid conditions

  • Criteria: Block main valve actuation above threshold pressure, permit main valve actuation below release pressure

- Demonstrate IAB and trip line functionality at operating chemistry fluid conditions (boric acid solutions)

  • Criteria: Negligible IAB and trip line performance compared to water only tests 3

PM-0119-64160-N P Revision: 0 Copyright 2019 by NuScale Power, LLC.

M!'!!:'.~"~~b.~.

Template#: 0000-21727-F01 R4

ECCS Valve DCA Demonstration Test

((2(a),(c) 4 PM-0119-64160-NP Revision: 0 Copyright 2019 by NuScale Power, LLC. W~!J.~E~b.~. Template#: 0000-21727-F01 R4

ECCS Valve DCA Demonstration Test ((

                                                                       }}2(a),(c) 5 PM-0119-64160-NP
                                                         *~! NUSCALE .

Powo, lo, ull humunk;nd Revision: O Copyright 2019 by NuScale Power, LLC. Template#: 0000-21727-F01 R4

ECCS Valve DCA Demonstration Test ((

                                                                        }}2(a),(c) 6 PM-0119-64160-NP
                                                         *~! NUSCALE .

eowe, 101 all hamcnkh,d Revision: 0 Copyright 2019 by NuScale Power, LLC. Template#: 0000-21727-F01 R4

Main Valve and IAB Actuation Tests ((

                                                                        }}2(a),(c) 7 PM-0119-64160-NP Revision: 0         Copyright 2019 by NuScale Power, LLC.

M~!:'.~"fl~b§ - Template#: 0000-21727-F01 R4

ECCS Valve DCA Demonstration Test ((

                                                                        }}2(a),{c) 8 PM-0119-64160-NP
                                                          *~! NUSCALe**

eowe, lo, ull humonk;nd Revision: 0 Copyright 2019 by NuScale Power, LLC. Template#: 0000-21727-F01 R4

ECCS Valve DCA Demonstration Test ((

                                                                       }}2(a),(c) 9 PM-0119-64160-NP
                                                         *"'I! NUSCALE .

Powo, lo, ull huma"klnd Revision: O Copyright 2019 by NuScale Power, LLC. Template#: 0000-21727-F01 R4

Boric Acid Effects Test ((

                                                                       }}2(a),(c) 10 PM-0119-641.60-NP Revision: 0        Copyright 2019 by NuScale Power, LLC.

w~~.~.~~!£ Template#: 0000-21727-F01 R4

Schedule 2019 ((

                                                                  }}2(a),(c) 11 PM-0119-64160-NP
                                                          * !NUSCALE .
                                                          "       Powe, lo, ull humao,Hnd Revision: 0       Copyright 2019 by NuScale Power, LLC.

Template#: 0000-21727-F01 R4

Portland Office Richland Office 6650 SW Redwood Lane, 1933 Jadwin Ave., Suite 130 Suite 210 Richland, WA 99354 Portland, OR 97224 541. 360. 0500 971.371.1592 Arlington Office Corvallis Office 2300 Clarendon Blvd., Suite 1110 1100 NE Circle Blvd., Suite 200 Arlington, VA 22201 Corvallis, OR 97330 541.360.0500 London Office 1st Floor Portland House Rockville Office Bressenden Place 11333 Woodglen Ave., Suite 205 London SW1 E 5BH Rockville, MD 20852 United Kingdom 301. 770. 0472 +44 (0) 2079 321700 Charlotte Office 2815 Coliseum Centre Drive, Suite 230 Charlotte, NC 28217 980.349.4804 http://www. nusca/epower. com W Twitter: @NuSca/e_Power NUSCALE' Power for all humankind 12 PM-0119-64160-N P

                                                                                                       * ! NUSCALe**
                                                                                                        "       Powo, lo, ull humankh,d Revision: 0                                      Copyright 2019 by NuScale Power, LLC.

Template#: 0000-21727-F01 R4}}