Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML24003A181 | 8 January 2024 | Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 | |
ML23345A036 | 11 December 2023 | ATWS Uet December 11, 2023 Pre-submittal Meeting Slides | Probabilistic Risk Assessment Large early release frequency |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23272A062 | 29 September 2023 | Ultimate Heat Sink Temperature Tech Spec Limit Change | Ultimate heat sink |
ML23229A483 | 17 August 2023 | RR 20-Year ISI Pre-Submittal NRC Meeting Handout | |
ML23229A172 | 17 August 2023 | RR Pen-75 Pre-Submittal NRC Meeting Handout | Finite Element Analysis |
ML23229A013 | 17 August 2023 | Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23163A164 | 12 June 2023 | 2022 Braidwood/Byron End-of-Cycle Meeting Presentation | |
ML23157A035 | 6 June 2023 | Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides | |
NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides | 21 February 2023 | Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides | |
ML23033A666 | 9 February 2023 | Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna | |
ML23033A667 | 30 January 2023 | Public Call with Constellation January 30, 2023 (Slides) | |
ML22159A333 | 9 June 2022 | Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting | Coronavirus |
ML22124A148 | 10 May 2022 | (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) | |
ML22124A149 | 10 May 2022 | (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) | |
ML22098A051 | 11 April 2022 | 2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides) | |
ML22013A394 | 13 January 2022 | Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System | |
ML21320A067 | 17 November 2021 | NRC Pre-Submittal Meeting - Braidwood, Unit 2, LAR for Removal of Unit 2 License Condition for Closure Stud Hole Location No. 35 (EPID L-2021-LRM-0089) (Slides) | Aging Management Pressure and Temperature Limits Report |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML21165A194 | 16 June 2021 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation | Coronavirus |
ML21165A288 | 16 June 2021 | Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) | Coronavirus |
ML21166A372 | 15 June 2021 | End-of-Cycle Meeting Presentation | High Radiation Area Coronavirus |
ML21162A332 | 11 June 2021 | BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs | |
ML21144A017 | 24 May 2021 | Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting | |
ML21134A016 | 24 May 2021 | Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) | |
ML21130A625 | 12 May 2021 | NRC Pre-Submittal Meeting - Braidwood LAR for Ultimate Heat Sink (EPID L-2021-LRM-0040) (Slides) | Ultimate heat sink |
ML21078A095 | 8 March 2021 | Session W20 - James Petty - Slide Deck 3 | |
ML20258A030 | 22 September 2020 | Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns | |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML20246G877 | 3 September 2020 | Licensee'S Presentation for September 3, 2020 Public Telephone Conference | |
ML20209A532 | 24 July 2020 | 2019 Braidwood and Byron End-of-Cycle Presentation | Coronavirus |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20175A872 | 23 June 2020 | Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach | |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20163A654 | 18 June 2020 | 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) | Coronavirus |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML20168A319 | 15 June 2020 | Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation | Coronavirus |
ML20091L043 | 1 April 2020 | Public Meeting Handout for Braidwood, Unit 2, April 1, 2020 | Pandemic Coronavirus |
ML19246B716 | 29 August 2019 | Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs | |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18276A071 | 4 October 2018 | Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR | Earthquake |
ML18218A112 | 8 August 2018 | Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 | Weld Overlay |
ML18171A084 | 21 June 2018 | GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) |