Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24029A17430 January 2024Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion
ML24003A1818 January 2024Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024
ML23345A03611 December 2023ATWS Uet December 11, 2023 Pre-submittal Meeting SlidesProbabilistic Risk Assessment
Large early release frequency
ML23317A07114 November 2023NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides)
ML23272A06229 September 2023Ultimate Heat Sink Temperature Tech Spec Limit ChangeUltimate heat sink
ML23255A10411 August 2023Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout
ML23163A16412 June 20232022 Braidwood/Byron End-of-Cycle Meeting Presentation
NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides21 February 2023Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides
ML23033A6669 February 2023Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna
ML23033A66730 January 2023Public Call with Constellation January 30, 2023 (Slides)
ML22159A3339 June 2022Presentation Slides for Braidwood and Byron 2021 End of Cycle MeetingCoronavirus
ML21320A06717 November 2021NRC Pre-Submittal Meeting - Braidwood, Unit 2, LAR for Removal of Unit 2 License Condition for Closure Stud Hole Location No. 35 (EPID L-2021-LRM-0089) (Slides)Aging Management
Pressure and Temperature Limits Report
ML21314A44710 November 2021Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection IntervalMoisture barrier
ML21166A37215 June 2021End-of-Cycle Meeting PresentationHigh Radiation Area
Coronavirus
ML21162A33211 June 2021BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs
ML21130A62512 May 2021NRC Pre-Submittal Meeting - Braidwood LAR for Ultimate Heat Sink (EPID L-2021-LRM-0040) (Slides)Ultimate heat sink
ML21078A0958 March 2021Session W20 - James Petty - Slide Deck 3
ML20261G73216 September 2020Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55aIncorporated by reference
Exemption Request
ML20209A53224 July 20202019 Braidwood and Byron End-of-Cycle PresentationCoronavirus
ML20178A42030 June 2020NEI Slides for June 30, 2020, Public Meeting on COVID-19 ResponseExemption Request
Pandemic
Coronavirus
ML20175A87223 June 2020Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach
ML20170B02123 June 2020NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) InspectionsBoric Acid
Weld Overlay
Nondestructive Examination
Stress corrosion cracking
Pandemic
Coronavirus
COVID-19
Pressure Boundary Leakage
ML20169A55916 June 2020Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1)Pandemic
Coronavirus
ML20163A65516 June 20206-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator InspectionsPandemic
Coronavirus
ML20091L0431 April 2020Public Meeting Handout for Braidwood, Unit 2, April 1, 2020Pandemic
Coronavirus
ML18347B31419 December 2018Bwrvip/Asme Relief Request Discussion December 19, 2018
ML18334A21630 November 2018Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018GOTHIC
ML18319A12719 November 2018Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation AreasHigh Radiation Area
Deep Dose Equivalent
ML18218A1128 August 2018Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1Weld Overlay
Stress corrosion cracking
ML18054B35927 February 2018Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli
ML17132A17725 May 2017LAR for Control Room Cooling at Byron and Braidwood StationsPost Accident Monitoring
ML16077A15622 March 2016Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards
ML16062A4222 March 2016Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit AppealAnticipated operational occurrence
Backfit
Power Uprate
ML15232A68327 August 2015Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request
ML15209A97230 July 2015Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and BraidwoodWeld Overlay
License Renewal
ML15204A49323 July 2015Bb Station Requests for Relief for Alternate Examination FrequencyWeld Overlay
ML15204A50523 July 2015EPRI Tech Basis for Brd-Byr Head RRBoric Acid
Weld Overlay
VT-2
Pressure Boundary Leakage
ML15133A47320 May 2015Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood StationsUnanalyzed Condition
Anticipated operational occurrence
Cyber Security
ML15135A42619 May 2015EOC Public Meeting SlidesUnanalyzed Condition
Ultimate heat sink
Mission time
Open House
ML15104A49314 April 2015Preliminary Site-Specific Results of the Environmental Review for Braidwood Station License RenewalEnvironmental Justice
ML14342A81210 December 2014Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh NozzlesWeld Overlay
License Renewal
ML14261A11122 September 20142014 NEI Fire Protection Information Forum NRC Public SlidesCoatings
Multiple Spurious Operation
Earthquake
Fire Protection Program
Very Early Warning Fire Detection
Backfit
ML14251A48510 September 2014Byron/Braidwood Auxiliary Feedwater Cross-TieProbabilistic Risk Assessment
ML14177A64123 June 2014UHS Pre-submittal Meeting PresentationSafe Shutdown
Ultimate heat sink
Enforcement Discretion
ML13249A1894 September 2013ILRT Extension LAR Pre-submittal Meeting Slides
ML13224A28812 August 20132012 Braidwood Station End-of-Cycle Public Meeting Licensee Presentation
ML13224A2928 August 20132012 Braidwood Station End-of-Cycle Public Meeting NRC Presentation
ML13107A05323 April 2013Pre-Submittal Meeting MSIV Actuators Slides
ML12227A51714 August 2012Licensee End-of-Cycle Public Meeting Slides
ML12227A53314 August 2012NRC End-of-Cycle Slide Presentation