L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 25 August 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Hydrostatic Probabilistic Risk Assessment Large early release frequency Time Critical Operator Action Fire Protection Program Coast down Exclusive Use Affidavit |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 27 July 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Earthquake Fire Protection Program |
L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 31 May 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Continuous fire watch Fire Protection Program |
ML23151A436 | 24 May 2023 | License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Incorporated by reference Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power Uprate |
ML23151A437 | 24 May 2023 | Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Incorporated by reference Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit Power Uprate |
ML23095A008 | 4 April 2023 | Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Internal Flooding Nondestructive Examination Emergency Lighting Missed surveillance Pressure and Temperature Limits Report Surveillance Frequency Control Program Battery sizing Fuel cladding Recently irradiated fuel Offsite Circuit Power change |
L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application | 3 March 2023 | Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application | Annual Radioactive Effluent Release Report License Renewal Subsequent License Renewal Environmental Justice |
L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 | 1 December 2022 | Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 | |
L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement | 5 October 2022 | Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement | Commercial Grade Dedication |
L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report | 12 August 2022 | Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report | |
L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information | 29 March 2022 | Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information | Hydrostatic VT-2 Through Wall Leak |
L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology | 19 November 2021 | Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology | Fuel cladding |
L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 10 | 25 October 2021 | Response to Request for Additional Information for ISI Relief Request No. 10 | Time to boil Through-Wall Leak Through Wall Leak |
L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 10 | 15 October 2021 | Response to Request for Additional Information for ISI Relief Request No. 10 | |
ML21258A379 | 14 September 2021 | Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor. | |
L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report | 24 June 2020 | Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report | |
L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | 8 June 2020 | Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | Safe Shutdown Time of Discovery High winds Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Operator Manual Action FLEX Annual Radioactive Effluent Release Report Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re | 21 May 2020 | Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re | Surveillance Frequency Control Program |
L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements | 16 April 2020 | Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements | Grab sample Offsite Dose Calculation Manual Unidentified leakage |
L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | 9 April 2020 | Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | |
ML20098F341 | 7 April 2020 | Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information | Downpower |
L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications | 22 July 2019 | Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications | |
ML19158A503 | 7 June 2019 | NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 Consultation | Grab sample License Renewal Subsequent License Renewal Accidental discharge |
L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response | 4 June 2019 | Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response | Coatings Aging Management |
L-2019-048, Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 8 | 15 March 2019 | Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 8 | Boric Acid Aging Management License Renewal Earthquake Power Uprate |
L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses | 6 March 2019 | Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses | Functionality Assessment Aging Management License Renewal Subsequent License Renewal Affidavit |
L-2019-033, Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses | 1 March 2019 | Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses | Aging Management |
ML19056A125 | 25 February 2019 | Turky Point SLRA RAIs 1 2 3 4 5 6 7 8 9 11 - Set 8 Rev 1 Irradiated Concrete-Steel Responses | Boric Acid Aging Management License Renewal Subsequent License Renewal Earthquake Power Uprate |
L-2019-012, Response to Follow-on NRC RAI No. B.2.3.9-1 a | 13 February 2019 | Response to Follow-on NRC RAI No. B.2.3.9-1 a | Boric Acid Non-Destructive Examination Temporary Modification Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Through-Wall Leakage Dissimilar Metal Weld |
L-2019-023, Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals | 31 January 2019 | Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals | Probabilistic Risk Assessment Fire Protection Program |
L-2018-234, Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision | 21 December 2018 | Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision | Probabilistic Risk Assessment |
L-2018-223, Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses | 14 December 2018 | Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses | Boric Acid Fire Barrier Coatings Aging Management Moisture barrier Through-Wall Leakage Dissimilar Metal Weld |
L-2018-222, Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses | 12 December 2018 | Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses | Aging Management |
L-2018-218, Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review | 28 November 2018 | Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review | |
L-2018-191, Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review | 28 November 2018 | Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review | Safe Shutdown Boric Acid Fire Barrier Coatings Aging Management Operability Determination License Renewal Subsequent License Renewal Dissimilar Metal Weld |
L-2018-193, Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review | 2 November 2018 | Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review | Safe Shutdown Boric Acid Coatings Temporary Modification Aging Management Moisture barrier License Renewal Subsequent License Renewal EVT-1 Through-Wall Leakage Dissimilar Metal Weld |
L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. | 31 October 2018 | WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. | Safe Shutdown Safe Shutdown Earthquake Hydrostatic VT-2 Liquid penetrant |
ML18299A114 | 24 October 2018 | Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses | |
L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses | 17 October 2018 | Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses | Boric Acid Fire Barrier Probabilistic Risk Assessment Coatings Incorporated by reference Aging Management Moisture barrier License Renewal Subsequent License Renewal Fire Protection Program Dissimilar Metal Weld Power Uprate |
L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items | 17 October 2018 | Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items | Temporary Modification Aging Management |
ML18296A024 | 16 October 2018 | Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review | Boric Acid High Radiation Area Hydrostatic Coatings VT-2 Finite Element Analysis Aging Management License Renewal Subsequent License Renewal Power Uprate |
ML18299A116 | 15 October 2018 | Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal | Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Aging Management License Renewal Subsequent License Renewal Power Uprate |
ML18299A117 | 12 October 2018 | Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) | Aging Management Exemption Request |
L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines | 12 October 2018 | Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines | Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Through-Wall Leak |
ML18299A118 | 12 October 2018 | Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 | Through-Wall Leak |
ML18283A310 | 5 October 2018 | Responses to Requests for Additional Information for Subsequent License Renewal Application Environmental Review | Ultimate heat sink |
L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review | 5 October 2018 | Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review | |
L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses | 14 September 2018 | Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses | Safe Shutdown Post Accident Monitoring Aging Management License Renewal Subsequent License Renewal Fire Protection Program |