 Issue dateTitleTopic
LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2111 February 2023Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG9 December 2022Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDGProbabilistic Risk Assessment
FLEX
LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)17 November 2022Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds21 March 2022Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds
JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments16 September 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments11 June 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
LR-N21-0024, Response to Request for Additional Information for Proposed Alternative for Examination of ASME Section XI, Examination Category 8-8, Item Number 82.11 and 82.1212 April 2021Response to Request for Additional Information for Proposed Alternative for Examination of ASME Section XI, Examination Category 8-8, Item Number 82.11 and 82.12Hydrostatic
Incorporated by reference
Dissimilar Metal Weld
LR-N21-0031, Response to Request for Additional Information, Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report1 April 2021Response to Request for Additional Information, Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits ReportAnticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
LR-N21-0019, Response to Request for Additional Information (Rai), Steam Generator Tube Inspection Report (ML20261 H589)25 February 2021Response to Request for Additional Information (Rai), Steam Generator Tube Inspection Report (ML20261 H589)Foreign Material Exclusion
LR-N20-0058, Response to Request for Additional Information License Amendment Request Re Application of Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection and Pressurizer Surge Lines16 September 2020Response to Request for Additional Information License Amendment Request Re Application of Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection and Pressurizer Surge LinesHydrostatic
ML19308A5954 November 2019Response to Request for Additional Information, License Amendment Request for Approval of Changes to Emergency Plan Staffing RequirementsMinimum staff
ML19280A0003 October 2019NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145)Minimum staff
LR-N19-0066, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.11 June 2019Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.Power change
LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension30 October 2018Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension
LR-N18-0112, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension20 October 2018Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) ExtensionLarge early release frequency
LR-N18-0108, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension18 October 2018Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) ExtensionAnticipated operational occurrence
LR-N18-0070, Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ..17 July 2018Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ...Mission time
Internal Flooding
Probabilistic Risk Assessment
RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2 May 2018Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
Authorized possession limits
LR-N17-0140, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860)18 October 2017Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860)Probabilistic Risk Assessment
Surveillance Frequency Control Program
LR-N17-0263, Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request14 September 2017Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment RequestMission time
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
Fuel cladding
LR-N17-0125, Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors11 August 2017Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsSafe Shutdown
Unanalyzed Condition
Time of Discovery
Fitness for Duty
High winds
Shutdown Margin
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Grace period
Power change
LR-N17-0115, Response to RAI Re Steam Generator Tube Inspection Report7 August 2017Response to RAI Re Steam Generator Tube Inspection Report
LR-N17-0118, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications7 August 2017Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical SpecificationsProbabilistic Risk Assessment
Surveillance Frequency Control Program
LR-N17-0102, Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-15 June 2017Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-1Dissimilar Metal Weld
LR-N17-0091, Supplemental Information Needed for Acceptance of Requested Licensing Action Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension4 May 2017Supplemental Information Needed for Acceptance of Requested Licensing Action Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) ExtensionSafe Shutdown
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
LR-N17-0079, Supplemental Information for Response to Request for Additional Information, Aging Management Program Plan for Reactor Vessel Internals3 May 2017Supplemental Information for Response to Request for Additional Information, Aging Management Program Plan for Reactor Vessel InternalsAging Management
EVT-1
LR-N17-0001, Supplemental Information for Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals13 January 2017Supplemental Information for Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel InternalsAging Management
LR-N16-0226, Response to Request for Additional Information, Regarding Removing Certain Training Requirements19 December 2016Response to Request for Additional Information, Regarding Removing Certain Training RequirementsNondestructive Examination
LR-N16-0094, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident6 December 2016Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
ML16305A24131 October 2016Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.
LR-N16-0127, Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals5 October 2016Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel InternalsAging Management
LR-N16-0159, Response to Request for Additional Information Regarding Chilled Water System Modifications30 August 2016Response to Request for Additional Information Regarding Chilled Water System Modifications
LR-N16-0153, Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-00118 August 2016Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001Enforcement Discretion
LR-N16-0134, Response to Request for Additional Information Regarding Chilled Water System Modifications12 August 2016Response to Request for Additional Information Regarding Chilled Water System ModificationsEnforcement Discretion
Probabilistic Risk Assessment
LR-N16-0130, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations2 August 2016Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
LR-N16-0109, and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 1715 June 2016and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 17
LR-N16-0055, Response to Request for Additional Information Regarding Chilled Water System Modifications31 March 2016Response to Request for Additional Information Regarding Chilled Water System ModificationsBoric Acid
Ultimate heat sink
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
GOTHIC
ML16083A19423 March 2016Transmittal of Response to Request for Additional Information, RAI-4, Aging Management Program Plan for Reactor Vessel InternalsAging Management
Power change
LR-N16-0012, Supplemental Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems10 February 2016Supplemental Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring SystemsSafe Shutdown Earthquake
Operating Basis Earthquake
LR-N15-0239, Compliance with March 12, 2012 NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Responses to Requests for Additional Information25 January 2016Compliance with March 12, 2012 NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Responses to Requests for Additional InformationBoric Acid
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
LR-N15-0255, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..23 December 2015High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
LR-N15-0235, Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066)27 November 2015Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066)Earthquake
LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)25 November 2015Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)Surveillance Frequency Control Program
ML19031A65830 March 199703/30/1997 Letter Response to Request for Evaluation Re Refueling Accident Inside Containment
ML19031A50323 March 1979Generation Station, Unit 2 - Responses to Requests for Additional Information. Provides 60 Copies of Additional Seismic Qualification Information as Identified During 02/26-28/1979 MeetingEarthquake
ML19031A38118 January 1979Response to Request for Additional Information on Quality Assurance & Subcompartment Analysis, Which Will Be Incorporated Into Fasr in Amendment to ApplicationTemporary Modification
Earthquake
ML19030A65522 August 197808/22/1978 Response to Request for Additional Information Increased Capacity Spent Fuel Racks
ML19031C3727 August 197808/07/1978 Letter Response to IE Bulletin No. 78-08 on Radiation Levels from Fuel Element Transfer Tubes
ML19030A6652 August 197808/02/1978 Response to Request for Additional Information Diesel Generators
ML19030A66031 July 197807/31/1978 Response to Request for Additional Information Increased Capacity Spent Fuel RacksBoric Acid